HomeMy WebLinkAbout2024-018SECTION 00520 Agreement
THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the
State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called
OWNER) and Florida Design Drilling, Inc. (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows:
ARTICLE 1 -WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
The proposed project consists of replacing one (1) Upper Floridan Aquifer (UFA)
production well S -1R for Indian River County Utilities Department (OWNER). The
well site location is shown on the attached well location map drawing. The scope of
work will include well construction permitting, drill site preparation, drilling, setting
of steel and PVC casings, grouting, flow testing, wellhead assembly, acidizing (if
necessary), well logging, pump testing, formation water disposal system (including
temporary piping and pumps), well facility disinfection and restoration of well site,
as described in the Invitation to Bid, and shown on the drawings.
ARTICLE 2 - THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
Project Name: Upper Floridan Aquifer South Well No. 1 Replacement (S1 R) -
Rebid
Bid Number: 2024024
Project Address: 1550 9th Street SW, Vero Beach, FL 32962
ARTICLE 3 - ENGINEER
3.01 Kimley-Horn and Associates is hereinafter called the ENGINEER and will act as OWNER's
representative, assume all duties and responsibilities, and have the rights and authority
assigned to ENGINEER in the Contract Documents in connection with the completion of the
Work in accordance with the Contract Documents.
ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment
A. The Work will be substantially completed on or before the 300th calendar day after the date
when the Contract Times commence to run as provided in paragraph 2.03 of the General
Conditions, and completed and ready for final payment in accordance with paragraph 14.07
of the General Conditions on or before the 330th calendar day after the date when the
Contract Times commence to run.
4.03 Liquidated Damages
A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the Work is not completed within the times specified
in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12
of the General Conditions. Liquidated damages will commence for this portion of work. The
parties also recognize the delays, expense, and difficulties involved in proving in a legal
proceeding the actual loss suffered by OWNER if the Work is not completed on time.
Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER
$1,148.00 for each calendar day that expires after the time specified in paragraph 4.02 for
Substantial Completion until the Work is substantially complete. After Substantial
Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work
within the Contract Time or any proper extension thereof granted by OWNER,
CONTRACTOR shall pay OWNER $1,148.00 for each calendar day that expires after the
time specified in paragraph 4.02 for completion and readiness for final payment until the
Work is completed and ready for final payment.
ARTICLE 5 - CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents, an amount in current funds equal to the sum of the amounts
determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.6, below:
A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit.
B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:
Numerical Amount: $1,931,250
Written Amount: one -million, nine -hundred thirty-one thousand, two hundred fifty dollars
ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions and the Contract Documents.
6.02 Progress Payments.
A. The OWNER shall make progress payments to the CONTRACTOR on the basis
of the approved partial payment request as recommended by ENGINEER in
accordance with the provisions of the Local Government Prompt Payment Act,
Florida Statutes section 218.70 et. seq. The OWNER shall retain five percent (5%)
of the payment amounts due to the CONTRACTOR until substantial completion
and acceptance of all work to be performed by CONTRACTOR under the Contract
Documents.
6.03 Pay Requests.
A. The OWNER shall make progress payments to the CONTRACTOR on the basis
of the approved partial payment request as recommended by ENGINEER in
accordance with the provisions of the Local Government Prompt Payment Act,
Florida Statutes section 218.70 et. seq. The OWNER shall retain five percent (5%)
of the payment amounts due to the CONTRACTOR until substantial completion.
B. For construction projects less than $10 million, at the time the Owner is in receipt
of the Certificate of Substantial Completion, the Owner shall have 30 calendar days
to provide a list to the Contractor of items to be completed and the estimated cost
to complete each item on the list. Owner and Contractor agree that the Contractor's
itemized bid shall serve as the basis for determining the cost of each item on the
list. For projects in excess of $10 million, owner shall have up to 45 calendar days
following receipt of Certificate of Substantial Completion of the project to provide
contractor with said list.
C. Within 20 business days following the creation of the list, Owner shall pay
Contractor the remaining contract balance including all retainage previously
withheld by Owner except for an amount equal to 150% of the estimated cost to
complete all of the items on the list. Upon completion of all items on the list, the
Contractor may submit a payment request for the amount of the 150% retainage
held by the Owner. If a good faith dispute exists as to whether one or more of the
items have been finished, the owner may continue to withhold the 150% of the total
cost to complete such items. The owner shall provide Contractor written reasons
for disputing completion of the list.
6.04 Paragraphs 6.02 and 6.03
do not apply to construction services work purchased by the County as OWNER which
are paid for, in whole or in part, with federal funds and are subject to federal grantor laws
and regulations or requirements that are contrary to any provision of the Local
Government Prompt Payment Act. In such event, payment and retainage provisions shall
be governed by the applicable grant requirements and guidelines.
6.05 Acceptance of Final Payment as Release.
A. The acceptance by the CONTRACTOR of final payment shall be and shall operate
as a release to the OWNER from all claims and all liability to the CONTRACTOR
other than claims in stated amounts as may be specifically excepted by the
CONTRACTOR for all things done or furnished in connection with the work under
this Contract and for every act and neglect of the OWNER and others relating to
or arising out of the work. Any payment, however, final or otherwise, shall not
release the CONTRACTOR or its sureties from any obligations under the Contract
Documents or the Public Construction Bond.
ARTICLE 7 - INDEMNIFICATION
7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract.
ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
following representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, and performance of the
Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.
D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating
to existing surface or subsurface structures at or contiguous to the Site (except Underground
Facilities) which have been identified in the Supplementary Conditions as provided in
paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous
Environmental Condition, if any, at the Site which have been identified in the Supplementary
Conditions as provided in paragraph 4.06 of the General Conditions.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations, explorations, tests,
studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
at or contiguous to the Site which may affect cost, progress, or performance of the Work or
which relate to any aspect of the means, methods, techniques, sequences, and procedures
of construction to be employed by CONTRACTOR, including applying the specific means,
methods, techniques, sequences, and procedures of construction, if any, expressly required
by the Contract Documents to be employed by CONTRACTOR, and safety precautions and
programs incident thereto
F. CONTRACTOR does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the performance of the Work at the
4
Contract Price, within the Contract Times, and in accordance with the other terms and
conditions of the Contract Documents.
G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Contract Documents.
H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the Site, reports and drawings identified in the Contract
Documents, and all additional examinations, investigations, explorations, tests, studies, and
data with the Contract Documents.
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
J. The Contract Documents are generally sufficient to indicate and convey understanding of
all terms and conditions for performance and furnishing of the Work.
K. Contractor is registered with and will use the Department of Homeland Security's E -Verify
system (www.e-verify.gov) to confirm the employment eligibility of all newly hired employees
for the duration of this agreement, as required by Section 448.095, F.S. Contractor is also
responsible for obtaining proof of E -Verify registration for all subcontractors.
ARTICLE 9 - CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 00520-1 to 00520-10, inclusive);
2. Notice to Proceed (page 00550-1);
3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive);
4. Sample Certificate of Liability Insurance (page 00620-1);
5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive);
6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive);
7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive);
8. Professional Surveyor & Mapper's Certification as to Elevations and Locations of the
Work (page 00634-1);
9. General Conditions (pages 00700-1 to 00700-38, inclusive);
10. Supplementary Conditions (pages 00800-1 to 00800-12, inclusive);
11. Technical Specifications and Attachments Provided with Invitation to Bid, prepared by
Kimley-Horn and Associates
13. Addendum 1;
14. Appendices to this Agreement (enumerated as follows):
Appendix A — Permits
15. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive),,-
16.
nclusive);
16. Bid Bond (page 00430-1);
17. Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of
Relationships (pages 00452-1 to 00452-2, inclusive);
18. Sworn Statement Under the Florida Trench Safety Act (pages 00454-1 to 00454-2,
inclusive);
19. Qualifications Questionnaire (page 00456-1 to 00456-2, inclusive);
20. List of Subcontractors (page 00458-1);
21. Certification Regarding Prohibition Against Contracting with Scrutinized Companies
(page 00460-1);
22. The following which may be delivered or issued on or after the Effective Date of the
Agreement and are not attached hereto:
a) Written Amendments;
b) Work Change Directives;
c) Change Order(s);
ARTICLE 10 - MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings indicated in the General Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound;
and, specifically but without limitation, moneys that may become due and moneys that are
due may not be assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically stated to the contrary in any written
6
consent to an assignment, no assignment will release or discharge the assignor from any
duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to
be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract
Documents shall be reformed to replace such stricken provision or part thereof with a valid
and enforceable provision that comes as close as possible to expressing the intention of the
stricken provision.
10.05 Venue
A. This Contract shall be governed by the laws of the State of Florida. Venue for any lawsuit
brought by either party against the other party or otherwise arising out of this Contract shall
be in Indian River County, Florida, or, in the event of a federal jurisdiction, in the United
States District Court for the Southern District of Florida.
10.06 Public Records Compliance
A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The
Contractor shall comply with Florida's Public Records Law. Specifically, the Contractor
shall:
(1) Keep and maintain public records required by the County to perform the service
(2) Upon request from the County's Custodian of Public Records, provide the County with a
copy of the requested records or allow the records to be inspected or copied within a
reasonable time at a cost that does not exceed the cost provided in Chapter 119 or as
otherwise provided by law.
(3) Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law for the duration
of the contract term and following completion of the contract if the contractor does not transfer
the records to the County.
(4) Upon completion of the contract, transfer, at no cost, to the County all public records in
possession of the Contractor or keep and maintain public records required by the County to
perform the service. If the Contractor transfers all public records to the County upon
completion of the contract, the Contractor shall destroy any duplicate public records that are
exempt or confidential and exempt from public records disclosure requirements. If the
contractor keeps and maintains public records upon completion of the contract, the Contractor
shall meet all applicable requirements for retaining public records. All records stored
electronically must be provided to the County, upon request from the Custodian of Public
Records, in a format that is compatible with the information technology systems of the County.
B. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO
THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS
AT:
(772) 226-1424
publicrecords(&-indianriver.gov
Indian River County Office of the County Attorney
180127 th Street
Vero Beach, FL 32960
C. Failure of the Contractor to comply with these requirements shall be a material breach of
this Agreement.
[The remainder of this page was left blank intentionally]
8
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate.
One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the
Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their
behalf.
This Agreement will be effective on January 23, 2024 (the date the Contract is approved by the
Indian River County Board of County Commissioners, which is the Effective Date of the Agreement).
OWNER:
By;
By:
san Adams, Chairm-an
A. TitkGnich, Jr., Coun y Admih
:122:kriaiMERM 119M 19TOu IF9 ilk O
CONTRACTOR:
"'• Florida Design Drilling LLC
�.... 0 . —
n
Y:
(CORPORATE SEAL)
�uN� �'• Attest ,���' � � s
(Contractor) Brandon Hoist, VP
By: IK. kith JaAKan, Assistant County Attorney
Ryan L. But Clerk of Court and Comptroller
Attest:
Deputy Clerk
(SEAL)
Designated Representative:
Howard Richards, P.E.
Utilities Capital Projects Manager
1801 27th Street
Vero Beach, Florida 32960
(772) 226-1821
hrichards@indianriver.gov
Address for giving notices:
7733 Hooper Rd
West Palm Beach, FL 33411
License No. 11148
(Where applicable)
Agent for service of process: Dan Ringdahl
CEO and License Holder
Designated Representative:
Name: Brandon Hoist
Title: Vice President
Address:
7733 Hooper Rd
West Palm Beach, FL 33411
Phone: 561-568-1231
Facsimile: 561-844-2967
(If CONTRACTOR i� p corporation or a
X10 n
partnership, attar trg ��ifiNthority to sign.)
�—WAX,
• ST 2045
,.OR11)N