HomeMy WebLinkAbout2000-091C-1
40
R ilaniel Shallaway Pf
Jay G fay Pf
Gary M Raymaa PS M
- ri H. ileneil
8rloolwr 1 1. While Pf
Sr Reich g. lurksarr Pf
Engineers Surveyors Mappers
Shalloway Foy
Rayman&liewell,ln(-
NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY
FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT BASED ON A
COMPLETED SET OF APPROVED PLAINS.
12016elvedere Rood
West Pofrly 8cu(h, fi 33403 I �=A�
(561) 655- 1151 L CXHIBf
fox 837-9390
DATE THIS OPINION COMPLETED: X
shollowo �,wo7iwnl SUMMARY SHEET
www. sfin in1. (am
1-1
•
M
•
PRELIMINARY OPINION OF COSTS
PAVING, GRADING, & DRAINAGE
PROJECT: PELICAN POINTE PHASE II
PROJECT #: 82017
PROJECT MANAGER: BRIAN LAMOTTE, P.E.
ITEM
UNIT QUANT.
$ PER UNIT
TOTAL
1
SODSY
1100
$ 1.60
$
1,760.00
2
STREET SIGNS AND STRIPING
LS
1
$ 750.00
$
750.00
3
REMOVE EXISTING ASPHALT (Not Milled)
SF
300
$ 1.00
$
300.00
4
ACSC TYPE S -III - 1 114"
SY
1150
$ 3.25
$
3,737.50
5
P.B.C. SHELLROCK 8"
SY
1150
$ 6.00
$
6,900.00
6
STABILIZED SUBGRADE - 12""
SY
1275
$ 1.75
$
2,231,25
7
CONC SNU - 4"` THICK
SF
820
$ 1.50
$
1,230.00
8
CONC VALLEY GUTTER - 2'
LF
960
$ 10.00
$
9,600.00
9
CURB & GUTTER - TYPE F
LF
8O
$ 11.50
$
926.00
10
' TYPE C INLET
EA
2
$ 970.00
$
1,940.00
11
MANHOLE
EA
1
$ 1,050.00
$
1,050.00
12
RCP 15'"
LF
50
$ 24.00
$
1,200.00
13
CAP 12"
LF
265
$ 18.04
$
4,770.00
14
: 12" MITERED END SECTION
EA
1
$ 500.00
$
500.00
15
- CONNECT TO EXIST. INLET
EA
2
$ 1,000.00
$
2,000.00
1.6
ADJUST EXIST, INLET
EA
1
$ 350.00
$
350.00
17
IDIRECTION ARROW PAINT
EA
2
$ 35.00
$
70.00
18
I]TRENCH SAFETY
LF
315
$ 2.00.1$
630.00
19
' STREET LIGHTS (POST LIGHTS)
EA
15
$ 250.00
1 $
3,750.00
SUB TOTAL
$
43,688.75
THE FOLLOWING ITEMS MAY BE IMPORTANT, HOWEVER THEY
DO NOT HAVE A $ PER UNIT. THEY ARE LUMP SUM OR PERCENTAGE.
< CLEARING AND GRUBBING
LS
$ 2,500.00
$
2,500.00
'POLLUTION PREVENTION PLAN
LS
$ 1,500.00
$
1,500.00
P2O
ENGINEERING,SURVEYING & TESTING
LS
$ 20,000.00
$
20,000.00
SUB TOTAL
$
24,000.00
TOTAL
$
67,688.75
NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY
FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT BASED ON A
COMPLETED SET OF APPROVED PLANS,
PAVI NO, GRAOINO, ORAINAOF MASTER OPINION OF COST Ft1RM DATE I"ISO P I N I ON COMPLETED: 2)&W
{FILE NAMP.PELIGAN PDINTE AS OFJANOARY 1991 PAGE 1
40
C]
r
i
NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND
BUDGET PURPOSES ONLY. IT IS NOT BASED ON A COMPLETED SET OF APPROVED
PLANS.
WATER DISTRIpUTIOH AND TRANSMISSION MA3TCR10PINION OP COST FORM OAT THM OPINION COLIPlET£ AO
PIG£ MAUI: PELICAN POINTE A% OF JANUARY IM
E
do
4b
NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET' PURPOSES
ONLY. IT IS NOT BASED ON A COMPLE'T'ED SET OF APPROVED PLANS.
WASTEWATER CO"CTNfN AND TRANSMISEYO'N MASTER OKNION OF COSTS FORM DATE TI413 MNKM COMPLgvn: Zm"
FAZE NAME: PELICAN MNTb AS or imuARY ll" PAOE I
C-1
i
•
400
NOTE. TI -IIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND
BUDGET PURPOSES ONLY. IT IS NOT EASED ON A COMPLETED SET OF APPROVED PLANS.
SHORELINE LANDSCAPE
FILE NAME: PELICAN POINTE
DATE THIS OPINION COMPLETED: ZnM
PAGE I