Loading...
HomeMy WebLinkAbout2000-091C-1 40 R ilaniel Shallaway Pf Jay G fay Pf Gary M Raymaa PS M - ri H. ileneil 8rloolwr 1 1. While Pf Sr Reich g. lurksarr Pf Engineers Surveyors Mappers Shalloway Foy Rayman&liewell,ln(- NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT BASED ON A COMPLETED SET OF APPROVED PLAINS. 12016elvedere Rood West Pofrly 8cu(h, fi 33403 I �=A� (561) 655- 1151 L CXHIBf fox 837-9390 DATE THIS OPINION COMPLETED: X shollowo �,wo7iwnl SUMMARY SHEET www. sfin in1. (am 1-1 • M • PRELIMINARY OPINION OF COSTS PAVING, GRADING, & DRAINAGE PROJECT: PELICAN POINTE PHASE II PROJECT #: 82017 PROJECT MANAGER: BRIAN LAMOTTE, P.E. ITEM UNIT QUANT. $ PER UNIT TOTAL 1 SODSY 1100 $ 1.60 $ 1,760.00 2 STREET SIGNS AND STRIPING LS 1 $ 750.00 $ 750.00 3 REMOVE EXISTING ASPHALT (Not Milled) SF 300 $ 1.00 $ 300.00 4 ACSC TYPE S -III - 1 114" SY 1150 $ 3.25 $ 3,737.50 5 P.B.C. SHELLROCK 8" SY 1150 $ 6.00 $ 6,900.00 6 STABILIZED SUBGRADE - 12"" SY 1275 $ 1.75 $ 2,231,25 7 CONC SNU - 4"` THICK SF 820 $ 1.50 $ 1,230.00 8 CONC VALLEY GUTTER - 2' LF 960 $ 10.00 $ 9,600.00 9 CURB & GUTTER - TYPE F LF 8O $ 11.50 $ 926.00 10 ' TYPE C INLET EA 2 $ 970.00 $ 1,940.00 11 MANHOLE EA 1 $ 1,050.00 $ 1,050.00 12 RCP 15'" LF 50 $ 24.00 $ 1,200.00 13 CAP 12" LF 265 $ 18.04 $ 4,770.00 14 : 12" MITERED END SECTION EA 1 $ 500.00 $ 500.00 15 - CONNECT TO EXIST. INLET EA 2 $ 1,000.00 $ 2,000.00 1.6 ADJUST EXIST, INLET EA 1 $ 350.00 $ 350.00 17 IDIRECTION ARROW PAINT EA 2 $ 35.00 $ 70.00 18 I]TRENCH SAFETY LF 315 $ 2.00.1$ 630.00 19 ' STREET LIGHTS (POST LIGHTS) EA 15 $ 250.00 1 $ 3,750.00 SUB TOTAL $ 43,688.75 THE FOLLOWING ITEMS MAY BE IMPORTANT, HOWEVER THEY DO NOT HAVE A $ PER UNIT. THEY ARE LUMP SUM OR PERCENTAGE. < CLEARING AND GRUBBING LS $ 2,500.00 $ 2,500.00 'POLLUTION PREVENTION PLAN LS $ 1,500.00 $ 1,500.00 P2O ENGINEERING,SURVEYING & TESTING LS $ 20,000.00 $ 20,000.00 SUB TOTAL $ 24,000.00 TOTAL $ 67,688.75 NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT BASED ON A COMPLETED SET OF APPROVED PLANS, PAVI NO, GRAOINO, ORAINAOF MASTER OPINION OF COST Ft1RM DATE I"ISO P I N I ON COMPLETED: 2)&W {FILE NAMP.PELIGAN PDINTE AS OFJANOARY 1991 PAGE 1 40 C] r i NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT BASED ON A COMPLETED SET OF APPROVED PLANS. WATER DISTRIpUTIOH AND TRANSMISSION MA3TCR10PINION OP COST FORM OAT THM OPINION COLIPlET£ AO PIG£ MAUI: PELICAN POINTE A% OF JANUARY IM E do 4b NOTE: THIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET' PURPOSES ONLY. IT IS NOT BASED ON A COMPLE'T'ED SET OF APPROVED PLANS. WASTEWATER CO"CTNfN AND TRANSMISEYO'N MASTER OKNION OF COSTS FORM DATE TI413 MNKM COMPLgvn: Zm" FAZE NAME: PELICAN MNTb AS or imuARY ll" PAOE I C-1 i • 400 NOTE. TI -IIS ENGINEERS' OPINION OF COSTS IS FOR PRELIMINARY FEASIBILITY AND BUDGET PURPOSES ONLY. IT IS NOT EASED ON A COMPLETED SET OF APPROVED PLANS. SHORELINE LANDSCAPE FILE NAME: PELICAN POINTE DATE THIS OPINION COMPLETED: ZnM PAGE I