Loading...
HomeMy WebLinkAbout2000-123• • CHANGE ORDER (Instructions on reverse side) , ro Two (2) t�%�- v�. Centxal Region WWTP PROJECT .?'base„I,. Exgap$.1.011..t.t7..2 .0 MGD DATE OF ISSUANCE ............................... EFFECTIVE DATE ........................................... OWNER ..Indian„R,iver..Coun.tY,...F.jRr.jj,4i............................................................... OWNER's Contract No.8067 ...... ......................... Indian River Industrial CONTR4CTOR Contractors, Inc;_.,,, ENGINEER.Camp Dresser„& Mc Kee.r..Ipc..... Date You are directed to make the following changes in the Contract Documents.lamin. Description: Patrial Reconciliation Change Order Mig; Reason for Change Order.. See Exhibit A Attachments: (List documents supporting change) Exhibit A- Partial Reeonciliation CHANGE IN CONTRACT PRICE: CHANGE rN CON'ILACT TIMES: Original Contract Prae partialeCompletion; December 30, Sunstanual Wmpteuon: s 10,672,415.00 Ready for final payment: March 1 2nn0 Jay+ of aa,n Net changes from previous Change Orders No. 1 to No. _ Net c)range from previous Change Orders No. 1 to No. S (4,536,811.64) 0 vr+ Contract Price prior to this Change Order _ u- .i i s p ar toIs Ch ane Order �artlar`� �ompetl�n: December 30, - Substantial Camp)etion: February28 • ?non S 6,135,603.36 Ready rorfinalpayment: MIrrh 29,. 2nnn aan or and Net our MX(de , e) of this Change Order Net Incaase� of this Change Order 768.68 60 days (PC SC & FC) S— air+ Contract Pricc with all approved Change Orders Contract Times with all approved Change Crdcrs Partial Completion: February 28, SubstantialComplctiom Ab r 11 2 8 2nn0 s 6,134,834.68 Ready far final payment: moi_/2 R, —__-200 n aa9a ar am ]ME 1999 2000 RECOMMENDED• APPROVED: ACCEPTED: B*1 /1..�-n'� ►J BY: �' Camp D+e°sser a5h%i�ee, Inc. y Indian” iIvei�`�ounty IndlanaRiver Industrial Daze: Z2000 Date: 04/18/2000 Datc ontractors, Inc. 9J3 boon EJCDC No. 1910-8-8 (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endamcd by The Associated Generat Contractors of America. 00800_ 25 EXHIBIT "A" PARTIAL RECONCILIATION ITEM DESCRIPTIONS Indian River County Central Region WWTP Phase I - Expansion to 2.0 MGD CDM Project No. 6706-13899-070 Change Order No. 2 WWI Item No. 1 Description: Credit for bar chart type schedule. Purpose: Bar chart type schedule accepted in lieu of critical path method schedule. Cost: ($10,000.00) Time: 0 2 Description: Credit for installation of scum ejector system. Purpose: Scum ejectors accepted in lieu of air operated diaphragm pumps. Cost•. ($19,019.00) Time: 0 3 Description: Termite pretreatment for generator/ electrical building slab. Purpose: Required by building permit. Not specified. Cost: $1,102.67 Time: 0 4 Description: Precast concrete riser section for effluent meter box. Purpose: Existing piping deeper than shown on as-builts. Cost. $2,038.00 Time: 0 • is 5 Description: Additional pipe and fittings for 12 -inch equalization piping. Purpose: Additional piping and fittings required to avoid tank concrete footer. As -built drawing not accurate. Cost: $3,325.00 Time: 0 6 Description: Headworks drop box modifications. Purpose: Modifications as requested by operations staff. Cost: $2,860.00 Time: 0 7 Description: Electrical modifications related to level and dissolved oxygen sensor relocation. Purpose: Sensors relocated by manufacturer recommendations for better plant operations. Cost: $6,051.00 Time: 0 8 Description: Sodium hypochloride injection point manholes. Purpose: Manholes to be used in lieu of vaults due to depth and serviceability. Cost: $2,068.00 Time: 0 9 Description: Additional sidewalk installation. Purpose: Additional sidewalk to aid operation staff access and maintenance. Cost: $5,994.15 Time: 0 rb2740 10 Description: Delays associated with hurricane preparation and workforce availability. Purpose: Extension associated for time lost due to hurricane preparations and work force availability. Cost: $0.00 Time: 60 days (PC, SC & FC) 11 Description: Additional 8 -inch tee and plug valve. Purpose: Provision for return activated sludge routing to existing septage facility by County staff. Cost: $3,440.00 Time: 0 12 Description: Canopy at sodium hypochloride equipment. Purpose: To enclose the equipment from the weather/ sunlight. Cost-. $1,371.50 rez74o Time: 0 L7 4W O EXHIBIT "A" PARTIAI. RECONCILIATION CHANGE ORDER COST SUMMARY Indian River County Central Region WWTP Phase I - Expansion to 2.0 MGD CDM Project No. 6706-13899-070 Change Order No. 2 Item No. Cost/(Credit) Time 1 ($10,000.00) 0 2 (19,019.00) 0 3 1,102.67 0 4 2,038.00 0 5 3,325.00 0 6 2,860.00 0 7 6,051.00 0 8 2,068.00 0 9 5,994.15 0 10 0.00 60 11 3,440.00 0 12 1,371.50 0 Total Change this C.O. No. 2 ($768.68) 60 days (PC,SC & FC) This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead acceleration, .material or other escalation which includes wages, and other impact costs. rb2240 • ATTAHCMENT A-1 PROJECT BUDGENT AMENDMENT NO.4 TASK 600 - GENERAL SERVICES DURING CONSTRUCTION EXTENSION GENERAL REGION WASTEWATER TREATMENT PLANT Project Description: The Engineer will provide general engineering services during the extended construction duration of the expansion to the Central Region WWTP to 2.0 Mgd. (Two month extension). Category Hours Total Officer 3 Principal/Associate 20 Senior Engineer 80 Project Engineer 40 Senior Support Staff 4 Support Staff 20 Clerical 40 207 $18,530 OTHER DIRECT COSTS TOTAL (LUMP SUM) rb2878\12/29/99 A-1 $20,5-10 a 40 ATTACHMENT A-2 PROJECT BUDGET AMENDMENT NO.4 TASK 700 - RESIDENT PROJECT REPRESENTATIVE EXTENSION CENTRAL REGION WASTEWATER TREATMENT PLANT Project Description: The Engineer will provide additional resident representative inspection services during the construction of the expansion to the Central Region WWTP to 2.0 Mgd. (Ten (10) hours per week - Three (3) months and Thirty (30) hours per week - Two (2) months). Category Hours Total Senior Field Staff 20 Field Staff 385 405 $17,760 OTHER DIRECT COSTS $800 TOTAL (LUMP SUM) $18,560 rb2878\12/29/99 A-2 ATTACHMENT B AMENDMENT NO.4 to WORK AUTHORIZATION between INDIAN RIVER COUNTY and CAMP DRESSER & McKEE INC. Providing PROFESSIONAL SERVICES RELATED TO CENTRAL REGION WASTEWATER TREATMENT PLANT CDM PRO)ECT NO. 6706-13899-070 The Amendment No. 4 dated to the Work Authorization dated November 14, 1995 between Indian River County and Camp Dresser & McKee Inc., in consideration of the mutual terms, conditions, promises, covenants, and payments set forth, agree to the following changes: 1. Attachment B, Central Region Wastewater Treatment Plant, Task 600 - General Services During Construction is hereby amended as follows: Add the following words to the end of the task: "J. Engineer will provide general engineering services due t ) extended construction duration (two (2) additional months) of the Central Region WWTP to 2.0 Mgd." 2. Attachment B, Central Region Wastewater Treatment Plant, Task 700 - Resident Project Representative is hereby amended as follows: Add the following words to the end of the task: "E. Engineer will provide additional resident project representative inspection services for the remainder of construction (additional ten (10) hours per week for three (3) months and thirty (30) hours per week for two (2) months) of the Central Region WWTP to 2.0 Mgd." 3. Article IV, Compensation for Services, is hereby amended as follows: Add the following words to the end of the Compensation for Services: "Total Contract (includes Amendment Nos.1 and 3) $725,100 General Services During Construction Extension (Amendment No. 4) 20,530 Resident Project Representative Extension (Amendment No. 4) 18,560 Total Adjusted Contract " ,b2e78\:2/29/99 B-1 ATTACHMENT B AMENDMENT NO.4 to WORK AUTHORIZATION between INDIAN RIVER COUNTY and CAMP DRESSER & McKEE INC. Providing PROFESSIONAL SERVICES RELATED TO CENTRAL REGION WASTEWATER TREATMENT PLANT CDM PROJECT NO. 6706-13899-070 The Amendment No. 4 dated to the Work Authorization dated November 14, 1995 between Indian River County and Camp Dresser & McKee Inc., in consideration of the mutual terms, conditions, promises, covenants, and payments set forth, agree to the following changes: Attachment B, Central Region Wastewater Treatment Plant, Task 600 - General Services During Construction is hereby amended as follows: Add the following words to the end of the task: "J. Engineer will provide general engineering services due to extended constriction duration (two (2) additional months) of the Central Region WWTP to 2.0 Mgd." 2. Attachment B, Central Region Wastewater Treatment Plant, Task 700 - Resident Project Representative is hereby amended as follows: Add the following words to the end of the task: "E. Engineer will provide additional resident project representative inspection services for the remainder of construction (additional ten (10) hours per week for three (3) months and thirty (30) hours per week for two (2) months) of the Central Region WWTP to 2.0 Mgd." 3. Article IV, Compensation for Services, is hereby amended as follows: Add the following words to the end of the Compensation for Services: "Total Contract (includes Amendment Nos.1 and 3) $725,100 General Services During Construction Extension (Amendment No. 4) 20,530 Resident Project Representative Extension (Amendment No. 4) 18,560 Total Adjusted Contract $764.190" rb2878\12/29/99 B-1 40 r-. C 0 SUBMITTED BY: CAMP DRESSER & McKEE INC. By 1�. oCRly�QQ.r 'h' E. Lawrence Adams, Jr., P.E., DEE Date: '41017.000 rb2878\12/29/99 B-2 APPROVED BY: INDIAN RIVER COUNTY BOARD OF COUNTY COMMISSIONERS Fran Adams Chairman Date: April 18, 2000 Ir.oen RIM Co AD'NQrcO C?!r Admen Legal Budget /0 k) Utiliuee Fick Mgr.