HomeMy WebLinkAbout2000-125• • • Scope of Work Cost E6111"at9 - "2SO4 AST Repair 3798.00 SCOPE -OF -WORK: March 23, 2000 Page 1 of 2 The identified project is to effect the repair of a leaking 16,000 -gallon H,SO, AST. After performing an inspection of the AST It has been determined that the course of action will need to hr: tho tompornry storage of approximately 8,000 gallons of 98% H,SO, for approximately two weeks while the AST is cleaned, inspected, and repaired, Temporary storage of the 98% H,SO, will be in 2,000 - gallon poly tanks suitable for short-term acid use (i e , less than three years continuous contact). However, the poly tanks will need to be fitted with CPVC fittings sealed with VIl ON 0 -rings prior to being put into service as temporary acid storage. ACT will provide for Indian River County's use a double-diaphragrn acid purnp to transfer acid to day tank during AST work. The AST will be cleaned of residual acid and washed with a 3,000 psi pressure washer. Once the tank interior is cleaned the interior surface will be visually examined for pitting, corrosion, and/or cracks. In addition, the steel tank shell will be inspected at randomly selected locations with an ultrasonic thickness gauge to measure tank wall thickness. Following all tank inspections the leaking pipe nipple underneath the tank will be cut away with a new nipple and flange welded into place. After the tank has been repaired the remaining H,SO, in temporary storage will be returned to the AST. The poly tanks will be cleaned on site after all acid has been transferred to the AST. DESCRIPTION UNITS QTY. UNIT TOTAL COST Transfer H,SO, and Clean lump 1 $4,262.00 $4,262.00 16,000 -Gallon AST sum Temporary Acid Storage 2,000 -Gallon Poly Tanks week 2 $120.00 $960.00 CPVC Tank Fitting Upgrade each 4 $250.00 $1,000.00 Acid Diaphragm Pump week 2 $342.00 $684.00 Poly Tank Gleaning each 4 $225.00 $90000 Tank Interior Visual and Ultrasonic lump 1 $1,995.00 $1,995.00 i2ilaeettonsum Tank Repair lump 1 $650.00 $650.00 Sum Total $10,451.00 V0' d E:C 1 1 VES 299=G1 A*C*T IM:3.1. di•100 NW) IH314V 6 V : Z 1 00-£:Z.-00 • • • scope of Work Cost Estimate - H2So4 AST Repair 3798-00 March 23, 2000 Page 2 of 2 ACT strives to be a competitive environmental contracting/consulting firm while maintaining a high quality product for its clientele. To do this effectively ACT must specify what conditions each project is based upon. Certain conditions or situations may occur during the course of project work which may adversely impact the total project costs. Additional work will not begin without prior express authorization. This cost estimate, as presented, is strictly based upon client communications and the attached Terms and Conditions, A,*C*T--***" SO'd 221T VCS C99=01 }{n3l dP700 NV0121314V OS:dT OO-cz-o@ Le Id Terms and Conditions Cost Fstimate - II,SO, AST Repair 3700.00 March 23. 2000 Pago 2 of 2 This Quote and the Terms and Conditions shall constitute the entire understanding between patties and supersedes all prior quotes, bids, proposals, purchase orders or agreements behveen the parties with respect to the subject matter hereof. To the extent (hat a provision of the wjreement is contrary to local, state, or federal laws, the provision shall be void and unenforceable lior;evar, the balance of the agreement shall remain in force between the Client and ACT. This agreem-!nt shall bind and benefit the Client, its successors, and assigns, and ACT Inc., its successors and assigns. If you desire to accept this Quote as presented and are in agreement with the Terms and Conditions please execute this jocument by signing in the space provided below and return the original to AC'r. Prepared anre Echnologies, Inc. Joe Whiltington, Estimator Accepted By: (Client) Indian River County 04-18-2000 (aulhonzed signature) (dale sinned) Fran B. Adams (pnntilype name) _Chairman Board Q.L-C4 rn .x..owissioner (uuf!pos�uon) UuSen Hive Co Approved Nie Admin. L t:iudg-et Q Utilities -, /O p0 Rich M•3r. _--� A*C*T--**"' COTT VCS C98=UI R3211 dWOD NVDI83WV TS:ZI 00 -CZ -EO