Scope of Work
Cost E6111"at9 - "2SO4 AST Repair
3798.00
SCOPE -OF -WORK:
March 23, 2000
Page 1 of 2
The identified project is to effect the repair of a leaking 16,000 -gallon H,SO,
AST. After performing an inspection of the AST It has been determined that the
course of action will need to hr: tho tompornry storage of approximately 8,000
gallons of 98% H,SO, for approximately two weeks while the AST is cleaned,
inspected, and repaired, Temporary storage of the 98% H,SO, will be in 2,000 -
gallon poly tanks suitable for short-term acid use (i e , less than three years
continuous contact). However, the poly tanks will need to be fitted with CPVC
fittings sealed with VIl ON 0 -rings prior to being put into service as temporary
acid storage. ACT will provide for Indian River County's use a double-diaphragrn
acid purnp to transfer acid to day tank during AST work.
The AST will be cleaned of residual acid and washed with a 3,000 psi pressure
washer. Once the tank interior is cleaned the interior surface will be visually
examined for pitting, corrosion, and/or cracks. In addition, the steel tank shell
will be inspected at randomly selected locations with an ultrasonic thickness
gauge to measure tank wall thickness. Following all tank inspections the leaking
pipe nipple underneath the tank will be cut away with a new nipple and flange
welded into place.
After the tank has been repaired the remaining H,SO, in temporary storage will
be returned to the AST. The poly tanks will be cleaned on site after all acid has
been transferred to the AST.
DESCRIPTION
UNITS
QTY.
UNIT
TOTAL
COST
Transfer H,SO, and Clean
lump
1
$4,262.00
$4,262.00
16,000 -Gallon AST
sum
Temporary Acid Storage
2,000 -Gallon Poly Tanks
week
2
$120.00
$960.00
CPVC Tank Fitting Upgrade
each
4
$250.00
$1,000.00
Acid Diaphragm Pump
week
2
$342.00
$684.00
Poly Tank Gleaning
each
4
$225.00
$90000
Tank Interior Visual and Ultrasonic
lump
1
$1,995.00
$1,995.00
i2ilaeettonsum
Tank Repair
lump
1
$650.00
$650.00
Sum
Total
$10,451.00
V0' d E:C 1 1 VES 299=G1
A*C*T
IM:3.1. di•100 NW) IH314V 6 V : Z 1 00-£:Z.-00
•
•
•
scope of Work
Cost Estimate - H2So4 AST Repair
3798-00
March 23, 2000
Page 2 of 2
ACT strives to be a competitive environmental contracting/consulting firm while
maintaining a high quality product for its clientele. To do this effectively ACT
must specify what conditions each project is based upon. Certain conditions or
situations may occur during the course of project work which may adversely
impact the total project costs. Additional work will not begin without prior express
authorization. This cost estimate, as presented, is strictly based upon client
communications and the attached Terms and Conditions,
A,*C*T--***"
SO'd 221T VCS C99=01 }{n3l dP700 NV0121314V OS:dT OO-cz-o@
Le Id
Terms and Conditions
Cost Fstimate - II,SO, AST Repair
3700.00
March 23. 2000
Pago 2 of 2
This Quote and the Terms and Conditions shall constitute the entire understanding between patties and
supersedes all prior quotes, bids, proposals, purchase orders or agreements behveen the parties with
respect to the subject matter hereof. To the extent (hat a provision of the wjreement is contrary to local,
state, or federal laws, the provision shall be void and unenforceable lior;evar, the balance of the
agreement shall remain in force between the Client and ACT.
This agreem-!nt shall bind and benefit the Client, its successors, and assigns, and ACT Inc., its successors
and assigns.
If you desire to accept this Quote as presented and are in agreement with the Terms and Conditions please
execute this jocument by signing in the space provided below and return the original to AC'r.
Prepared
anre Echnologies, Inc.
Joe Whiltington,
Estimator
Accepted By: (Client)
Indian River County
04-18-2000
(aulhonzed signature) (dale sinned)
Fran B. Adams
(pnntilype name)
_Chairman Board Q.L-C4 rn .x..owissioner
(uuf!pos�uon)
UuSen Hive Co Approved Nie
Admin.
L
t:iudg-et
Q
Utilities
-, /O p0
Rich M•3r.
_--�
A*C*T--**"'
COTT VCS C98=UI R3211 dWOD NVDI83WV TS:ZI 00 -CZ -EO