HomeMy WebLinkAbout2024-052WORK ORDER 3
This Work Order Number 3 is entered into as of this 5 day of March , 2024,
pursuant to that certain Continuing Contract Agreement, dated May 2, 2023 (referred to as the
"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Bowman Consulting Group, Ltd. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the mutually agreed upon lump sum or
maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing,
and at a rate not to exceed the prices set forth in Exhibit B (Rate Schedule) of the Agreement, made a
part hereof by this reference. The Consultant will perform the professional services within the
timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and
made a part hereof by this reference all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above. y.�Oc�';MISS;off,
CONSULTANT: BOARD OF COUNTY COMMISSI RS
OF I7saVnams,
VER COUNTY '
By. By. Chairman �'✓Er co����•
P r ii Name: John M. Boyer, P.E. .
Title: Senior Project Manager
BCC Approval Date:
Attest: Ryan L. Butler, Clerk of Court and Comptroller
C-I)
By: aa
Deputy I U
By:
John A. Titkanich, Jr., County Administrator
App ve s to form and legal sufficiency:
K.elth J , ssis a y Attorney
CCNA2023 Work Order #3
Indian River Greenway Boardwalk
Bowman Consulting Group, Ltd.
EXHIBIT A - SCOPE OF WORK
Bowman Consulting Group Ltd. (Bowman) is pleased to submit this proposal for professional engineering services
to Indian River County Parks, Recreation & Conservation Department for the Indian River Lagoon Greenway
Boardwalk Improvements.
PROJECT BACKGROUND & UNDERSTANDING
Indian River County Parks, Recreation & Conservation Department plans to add boardwalk improvements to the
park site located at 850 Indian River Boulevard. The improvements are proposed to transit wet areas and keep
the trails usable during the wet season. The new boardwalk will follow the alignment of an existing trail and
connect to existing segments of boardwalk.
Required permitting from Army Corps of Engineers (ACOE) and the St Johns River Water Management District
(SJRWMD) is also anticipated but will be handled by Parks, Recreation & Conservation staff.
Construction/installation of the boardwalk itself will also require the necessary building permits issued by the IRC
Building Department. Building Department permits shall be obtained by the installing contractor and are not
included in the scope of services described below.
SCOPE OF SERVICES
The following services are proposed:
Task 1—Limited Topographic & Tree Survey
Bowman will prepare a Limited Topographic and Tree Survey in accordance with the Standards of Practice for
Surveys set forth in Chapter 5J-17.051 of the Florida Administrative Code and to the Indian River County Standards.
1. The survey will be limited to an approximately 20' -wide section along a segment of existing walking trail
as defined by County Staff.
2. Ground elevations will be collected at +/- 25 -foot intervals along the centerline and edges of the existing
path and at changes in direction.
3. Each size and type of tree will be collected within the limits of the survey area.
4. A seasonal high-water mark (established by others) will be located and an elevation determined.
5. A minimum of 4 Survey control points will be established along the route. They will be referenced to NAD
83/2011 Horizontal and NAVD88 Vertical.
Survey data will be presented on a copy of the site boundary as provided by the County. All work performed
under this task order shall be under the direction of a Professional Surveyor and Mapper registered in the State
of Florida in accordance with Chapter 472 of the Florida Statutes.
CCNA2023 Work Order #3
Indian River Greenway Boardwalk
Bowman Consulting Group, Ltd.
Task 2 — Civil Engineering Design Services
Bowman will prepare construction plans illustrating the alignment, profile, and section views of the proposed
boardwalk. The structural design of the proposed boardwalk will be prepared by the Contractor.
Under this task Bowman shall:
1. Prepare engineering drawings anticipated to include:
a. Cover Sheet;
b. Construction Notes;
c. Plan and Profile View;
d. Construction Details including Cross -Sections and Material Specifications.
2. Coordinate with Parks & Rec Staff during the design process. Meet to discuss draft boardwalk alignment
and tree mitigation.
3. Provide an engineer's opinion of estimated construction cost at the 90% design milestone. Final estimate
will match bid schedule.
4. Field review design/plans at 90% complete milestone to compare with site conditions. In-house plan
checking and respond to Client comments and prepare final drawings and specifications.
**Add Administrative Approval or5ite Plan approval to this task if necessary. **
Task 3 — Permit Support
Parks, Recreation & Conservation Staff shall obtain required jurisdictional permits from Army Corps of Engineers
(ACOE) and the St Johns River Water Management District (SJRWMD). Bowman will prepare exhibits (i.e.: maps
and sketch plans) as requested by Staff to support the permit applications.
This task shall not include building department permits required to authorize construction of the boardwalk
structure. Building permits shall be obtained by the contractor.
Task 4 - Bidding Services
Bidding Services shall include attendance of the pre-bid conference, respond to contractor's bid questions, and
preparation of addenda. Bowman will investigate references and write a letter of recommendation for the
apparent successful bidder.
Task 5 — Construction Observation & Certification
Following the award of the bid and the County issuance of the Contractor's Notice to Proceed, Bowman will
provide periodic construction observation services to verify that construction complies with the approvals and
permit documents. This task shall include attendance of the pre -construction meeting and progress meetings.
Upon completion of the project Bowman shall certify construction to the respective permit authorities.
Note: This task does not include building inspections (i.e.: plumbing, electrical, threshold, etc.).
CCNA2023 Work Order #3
Indian River Greenway Boardwalk
Bowman Consulting Group, Ltd.
SERVICES AND/OR INFORMATION TO BE PROVIDED BY OTHERS
Client or others will provide the following services and/or information:
A. Boundary survey of the site in dwg (AutoCAD) format.
B. Contractor will provide structural design and building permit services.
C. Provide record -drawings and information of existing improvements and utility -owned facilities and
other substructures.
D. Access to the site via gated driveway along the MOT drainage ditch along the north side of the site.
SERVICES NOT INCLUDED
This work order is limited to the above Scope of Services, but additional services may be provided at the request
of IRCDUS and within the services provided by Bowman. Additional services shall require written mutual
authorization prior to initiation.
Work specifically excluded in the above Scope of Services include:
A. Sub -Surface Soil Exploration (geotechnical) services.
B. Site Plan Approvals.
C. Jurisdictional Permitting.
CCNA2023 Work Order #3
Indian River Greenway Boardwalk
Bowman Consulting Group, Ltd.
EXHIBIT B — FEE SCHEDULE
COMPENSATION
Bowman will provide the services described above for the following fees:
Task 1—Limited Topographic & Tree Survey $ 5,505.00 (Lump Sum)
Task 2 — Civil Engineering Design Services $14,200.00 (Lump Sum)
Task 3 — Permit Support $ 3,600.00 (Hourly, Budget)*
Task 4 - Bidding Services $ 4,800.00 (Hourly, Budget)*
Task 5 — Construction Observation & Certification $15,000.00 (Hourly, Budget)*
Total Work Order (Not to Exceed): $43,105.00 (Budget)*
*Fees for hourly tasks will be based on the approved standard hourly rate schedule in the Agreement. Bowman's
invoicing shall not exceed the individual task budgets, or the total work order budget without the County's written
approval.
Services will be invoiced monthly. Lump sum invoices will reflect the percentage of the task completed. Hourly
tasks will reflect actual time/material expended.
CCNA2023 Work Order #3
Indian River Greenway Boardwalk
Bowman Consulting Group, Ltd.
EXHIBIT C —TIME SCHEDULE
This Task Order shall commence upon Notice to Proceed with the work to be completed as follows:
Task 1—Limited Topographic & Tree Survey 4S Days
Task 2 — Civil Engineering Design Services 90 — 120 Days (following Task 1)
Task 3 - Permitting Services 30 Days (may run concurrently with Task 2)
Task 4 - Bidding Services 45 Days (following Task 2)
Task S — Construction Administration & Certification TBD*
Total 180 — 240 Calendar Days
*Construction Services will be dependent on the construction schedule.