HomeMy WebLinkAbout2024-079A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
WORK ORDER to
SED to Admin 144 Fiber Expansion Project
This Work Order Number 10 is entered into as of this9thday of April 20�4
pursuant to that certain Continuing Contract Agreement, dated May 2, 2023 (referred to as the
"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn and Associates, Inc. ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the mutually agreed upon lump sum or
maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing,
and at a rate not to exceed the prices set forth in Exhibit B (Rate Schedule) of the Agreement, made a
part hereof by this reference. The Consultant will perform the professional services within the
timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and
made a part hereof by this reference all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
s
CONSULTANT: BOARD OF COUNTY COMMI IONER s�o;,
OFRINER COUN r,��'
By: ByC r,.„.
ams, Chairman a �,;..',° c
Print Name: Brian Good, P.E. '�'�h,i,P' o�:•'
Title: Principal BCC Approval Date: April 9, 2024
Attest: Ryan L. Butler, Clerk of Court and Comptroller
Deputy Clerk
By:
ohn A. Titkanich, Jr., County Administrator
Approved as;o form an legal ufficiency:
eI
4leK
William K. DeBraal, County Attorney
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
WORK ORDER No.
SED TO ADMIN 144 FIBER
EXPANSION PROJECT
EXHIBIT A — SCOPE OF WORK
The COUNTY desires to retain Consultant services to develop construction documents and
obtain jurisdictional approvals to expand the COUNTY's fiber network facilities between the
COUNTY Administrative Building on 27th Street and the intersection of US Highway 1 and
Jackson Street in Sebastian, approximately 14.0 miles. The intended utility corridor will be
proposed to follow the northern and western limits of the following roadway Rights -of -Way:
• 27th Avenue
■ Aviation Boulevard
■ Old Dixie Highway
■ 53rd Street
• CR -510
■ Indian River Boulevard
■ US Highway 1
■ Jackson Street
The COUNTY also desires to provide cross connection cabinets the intersections of 53rd Street
and Old Dixie Highway, Indian River Boulevard and the Merrill P Barber Bridge, 87th Street and
US Highway 1, and Jackson Street and US Highway 1. The Consultant will also provide plans to
complete the segments of 96 strand fiber at the intersection of Indian River Boulevard and 53rd
Street and Indian River Boulevard and the Merrill P Barber Bridge. A 24 strand drop connection
will also be provided at the Indian River County Fire Station Number 5.
A. Fiber Infrastructure Plans:
The Consultant shall develop construction documents necessary to support the proposed
improvements along the corridors identified above. The following outlines that tasks and
submittals to be made:
Initial Plan Submittal:
The Consultant will create survey and raster -based plan sheets (11"x17", 40 scale) to
facilitate delineation of the proposed fiber optic cable (FOC) infrastructure improvements.
Existing right-of-way will be depicted using information collected during the Limited
Topographic Survey Task. Existing franchise utility record and/ or as -built data will be
requested from franchise utility providers operating within the project limits. This
information will be depicted within the raster -based plan sheets.
The Consultant will conduct a field review to visually survey existing connection points, fiber
optic pull/slack boxes, cabling and conduits, road geometry, existing utilities and other
existing elements to delineate a recommended alignment. The Consultant will evaluate
alternative routes such that the proposed fiber conduit installation be evaluated to
determine an efficient alignment/ crossing design. The Consultant will provide an opinion of
Page 1 of 5
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Work Order No.
SED TO ADMIN 144 FIBER
EXPANSION PROJECT
probable construction cost based upon the improvements delineated within the Initial Plan
Submittal.
Constructability Plan Submittal:
The Consultant will review, and address COUNTY provided comments based upon the Initial
Plan Submittal. The Consultant will meet with the COUNTY to discuss comments and refine
the design. The Consultant will incorporate supplemental topographic survey data collected
in specific locations to assist in delineating the proposed improvements or to convey
additional information required to support the proposed improvements. Concurrently with
the Constructability Plan Submittal to the COUNTY, the Consultant will submit jurisdictional
permit applications. The Consultant will provide an opinion of probable construction cost
based upon the improvements delineated within the Constructability Plan Submittal.
Production Plan Submittal:
The Consultant will review, and address COUNTY and jurisdictional agency provided
comments based upon the Constructability Plan Submittal and permit applications. The
Consultant will meet with the COUNTY to discuss comments and refine the design. If
necessary, the Consultant will incorporate supplemental topographic survey data collected
in specific locations to assist in delineating the proposed improvements or to convey
additional information required to support the proposed improvements. Prior to submitting
the Production Plan Submittal, the Consultant will work with the COUNTY and jurisdictional
agency to facilitate permit issuance. Concurrently with the Production Plan Submittal to the
COUNTY, the Consultant develop necessary technical specifications to support the proposed
improvements. The Consultant will provide an opinion of probable construction cost based
upon the improvements delineated within the Production Plan Submittal.
B. Limited Topographic Survey:
The Consultant shall provide limited topographic survey services necessary to support and
facilitate contemplated design and permitting activities associated with this project. This
task will consist of the preparation of digital base map topographic surveys in accordance
with the Florida Minimum Technical Standards set forth by the Florida Board of Professional
Surveyors in Chapter 61G17-6, Florida Administrative Code, pursuant to Section 472.027,
Florida Statutes. The survey will include:
1. Establishment of a project wide Horizontal Control Network within the PROJECT
LIMITS.
2. Establishment of a project wide Vertical Control Network within the PROJECT
LIMITS. All elevations will be referenced to NAVD 1988 datum.
3. Supplemental spot elevations and topographic feature information will be
collected in sufficient detail to locate, design and construct the contemplated
improvements.
Page 2 of 5
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Work Order No,
SED TO ADMIN 144 FIBER
EXPANSION PROJECT
C. Jurisdictional Permitting:
The Consultant will perform analysis necessary to prepare jurisdictional permits to support
the above-described improvements with the following agencies:
• Indian River County Right -of -Way Use Permit
• Florida Department of Transportation Utility Permit
• Florida East Coast Railway Utility License
• Indian River Farms Water Control District Utility Construction Permit
All permit fees will be paid directly by the COUNTY and are not included in the lump sum
fees.
D. Franchise Utility Coordination:
The Consultant will coordinate with franchise utility operators in the vicinity of the project
such that the proposed construction activities can be developed to minimize impacts to
existing utilities located within the project limits. Franchise utility adjustments, designed by
the respective franchise utility operator, will be requested by the Consultant and reflected
within the prepared construction documents.
(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK)
Page 3 of 5
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Work Order No.
SED TO ADMIN 144 FIBER
EXPANSION PROJECT
EXHIBIT B — FEE SCHEDULE
The COUNTY agrees to pay and the Consultant agrees to accept for services rendered
pursuant to this Agreement fees inclusive of expenses in accordance with the following:
A. Professional Services Fee
The basic compensation mutually agreed upon by the Consultant and the
COUNTY is as follows:
Lump Sum Components
Task
Fiber Infrastructure Plans
Limited Topographic Survey
Jurisdictional Permitting
Franchise Utility Coordination
Labor Fee
$ 258,160
$ 115,000
$ 62,800
$ 43,580
Total Project 479,540
(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK)
Page 4 of 5
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Work Order No.
SED TO ADMIN 144 FIBER
EXPANSION PROJECT
EXHIBIT C — TIME SCHEDULE
Upon authorization to proceed by the COUNTY, final design documents are expected
to take approximately ten (10) months from the Notice to Proceed (NTP).
NTP
Initial Submittal (40% Design Drawings)
Constructability Submittal (80% Design Drawings)
Production Submittal (100% Design Drawings)
contingent upon BOCC approval
6 months following NTP
8 months following NTP
10 months following NTP
(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK)
Page 5 of 5
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. SUTLER, CLERK
Summary
Project Name SED to Admin 144 Fiber Infrastructure Expansion
Task Summary Manhours for project
Task
Principle
$300
Senior
Professional
$270
Registered
Professional
$210
Professional
II
$160
Professional
1
$130
Support Remarks
Staff
$75
Design Analysis
32
56
20
96
0
16
Fiber Infrastructure Plans
20
60
397
329
419
0
Utility Coordination
8
20
40
68
120
12
Permitin
20
40
136
0
88
80
Total Hours =
Labor Fee =
80
$24,000
176
$47,520
593
$124,530
493
$78,880
627
$81,510
108
$8,100
Sub -Total Fee =
Limited Topographic Survey Fee =
Geotech Fee =
Project Total Fee =
$364,540
$115,000
$0
$479,540
SED to Admin 144 Fiber Infrastructure Expansion - Workplan.xls Page 1
Design Analysis
Activity: Design Analysis / Review
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Task
Principle
Senior
Professional
Registered
Professional
Professional Professional
II 1
Support
Staff
Support
Staff
4
32
32
Cost est. conducted at Constructability and
Production submittals
;Review
MQuantities
12
Three review submittals to Count
24
24
Site Visits
20
40
QC/QA
Project Management
4
Subtotal
32
56
20
96 0
16
Page 2
Fiber Infrastructure Plans
Activity: Fiber Infrastructure Plans
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Task
Principle
Senior
Professional
Registered
Professional
Professional
II
Professional
1
Support
Staff
Clerical
Cover Sheet
2
4
General Notes Sheet
3
6
1 sheet
Summary of Quantities Sheet
4
12
40
1 sheet
Horiz/Vert Control Sheet
2
6
12
Typical Sections
Aviation Boulevard
2
8
12
Old Dixie Hi hway
8
12
US HighwaE 71
1
2
8
12
Plan Sheets
27th Street
1
10
6
72
sheets
12 hrs/ sht
Aviation Boulevard
1
10
6
7
2 sheets
12 hrs/ sht
Old Dixie Highway
18
144
90
108
30 sheets
@ 12 hrs/ sht
53rd Street
1
10
6
7
2 sheets
12 hrs/ sht
CR -510
1
5
3
4
1 sheets @
12 hrs/ sht
Indian River Boulevard
1
10
67
2 sheets
12 hrs/ sht
US Highway 1
20
163
102
122
34 sheets
@ 12 hrs/ sht
Jackson Street
1
5
3
4
1 sheets
12 hrs/ sht
Miscellaneous Const. Details
16
40
40
- includes HDD profiles
Cross Connection Cabinet Sheets
4
12
20
15
QC/QA
20
Project Management
12
Subtotal
20
60
397
329
419
0
Page 3
Utilities
Activity: Utility Coordination
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
Task
Principle
Senior
Professional
Registered
Professional
Professional Professional
II 1
Support Remarks
Staff
Ex. Utility Reveiw
8
40
60 120
8 Coordination w/ Util Co.'s
- Request as-bui@ data
Franchise Utility Coordination Meeting
12
6
4
GC/QA
4
Pro ect Management
4
Subtotal
8
20
40
68 120
12
Page 4
STATE OF FLORIDA
INDIAN RIVER COUNTY
THIS IS TO CERTIFY THAT THIS IS A TRUE AND CORRECT
COPY OF THE ORWANAL ON FILE IN THIS OFFICE
- RYAN L. BUIW, CLERK
�. 0
Activity: Permitting
Task
Principle
Senior
Professional
Registered
Professional
Professional Professional
II I
Support Remarks
Staff
Pre -application Meetings
IRC
4
8
4
FDOT
4
8
4
IRFWCD
4
8
4
FEC
4
8
4
Preliminary Exhibits for Permit
8
Permit Packa e
IRC
6
8
FDOT
6
8
IRFWCD
8
8
FEC
6
8
Request for Information
IRC
10
20
20
8
FDOT
10
20
20
8
IRFWCD
10
20
20
8
FEC
10
20
20
8
Pro'ect Mana ement
q
Subtotal
20
40
136
0 88
80