HomeMy WebLinkAbout2024-094AGREEMENT FOR PROFESSIONAL SERVICES FOR WATER PLANT AND WATER
RESOURCES ENGINEERING SERVICES RFQ2019070
WORK ORDER #6 Amendment #2
Indian River County Department of Utility Services
South Oslo WTP Improvements Construction Phase Services Amendment
This Work Order Number 6 Amendment #2 is entered into as of this 23 day of April
202J pursuant to that certain AGREEMENT FOR PROFESSIONAL SERVICES FOR WATER PLANT AND WATER
RESOURCES ENGINEERING SERVICES RFQ2019070 entered into as of this 51h day of November, 2019 (collectively
referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the
State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B
(Fee Schedule), attached to this Work Order and made a part hereof by this reference. The Consultant
will perform the professional services within the timeframe more particularly set forth in Exhibit C
(Time Schedule), attached to this Work Order and made a part hereof by this reference all in
accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of
the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement
and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as
if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above. ........•
CONSULTANT:
By:
Print Name: J�,)Vrx L-e..c,
Title: Vice 1/ell LA�
BOARD OF COUNTY COMI%
OF LIMMA1M IVER COUNTY
By:
•�pplMISS
ER
s*s
Susan Adams,
ER
BCC Approved Date: April 23, 2024
Attest,
By:
Clerk of Court and Comptroller
Ward low, Deputy Clerk
Approved:
itic ich, Jr. , County dministrator
John AV
Approved as to form and legal sufficiency:
William K. DeBraal , County Attorney
EXHIBIT #A
South Oslo Rd Water Treatment Plant Improvements
Construction Phase Services
Work Order No. 6 Amendment #2
PROJECT UNDERSTANDING
TLC Diversified, Inc. is the general contractor for the South Oslo Road Water Treatment Plant
(WTP) Improvements project. Throughout the course of the project, TLC had incurred significant
delays due to COVID supply chain issues and owner requested change orders that resulted in
additional work for TLC to complete as part of the project. At the request of the Owner, TLC
prepared an updated schedule and time extension request to complete the remaining work in their
contract. In November 2023, TLC submitted this schedule and time extension request that yielded
a substantial completion date of March 15, 2024 and a final completion date of May 17, 2024. This
time extension was awarded by Indian River County Department of Utility Services (IRCDUS).
Since the initial time extension was provided by IRCDUS, TLC had incurred further delays
extended beyond the dates agreed upon to complete the work. In March 2024, TLC submitted a
revised schedule that showed them completing the work in August 2024, approximately two and a
half months after the current final completion date. TLC has worked with IRCDUS to implement
improvements to fast-track schedule and does not anticipate further delays in work without being
assessed Liquidated Damages as outlined in the construction contract.
Due to the extension of the construction schedule, the Consultant anticipates additional effort to
serve as the Owner's representative through project completion. This project extension will result
in additional time and effort by Consultant. This amendment presents the additional services
requested by Indian River County Department of Utility Services (IRCDUS) of the Consultant for
additional construction phase services through project completion.
SCOPE OF SERVICES
TASK 1— CONSTRUCTION PHASE SERVICES - AMENDED
Consultant will provide additional construction phase services for this project consisting of;
• coordination and progress meeting attendance, and preparation of meeting minutes
• construction observations, including inspector and engineer observations
Consultant anticipates an additional five (5) progress meetings will be held through project
completion. Consultant will prepare meeting agenda for each progress meeting and within one
week of each respective progress meeting, Consultant will prepare and distribute meeting minutes
that summarize the major discussion topics from the meeting.
Consultant will provide additional on-site construction observation services during the construction
phase. The project schedule is anticipated to extend by two and a half (2.5) months based on
Contractor's latest schedule submittal. Consultant assumes this 2.5 -month period of construction
will require approximately three to four (3 - 4) visits per week per month to observe the work for
conformance with the Contract Documents. Consultant anticipates an additional thirty (30) site
visits will also be required. Such visits and observations by the Consultant representative are not
intended to be exhaustive or to extend to every aspect of Contractor's work in progress.
K.IWPB_CivihGenerallBlack0orfdal[RCUIOsio WTP Construction Phase Wmendment 200240325 -Amendment 2Oslo CPS.doc Page I of6
Indian River County Utilities Department
Observations are to be limited to spot checking, selective measurement, and similar methods of
general observation of the Work based on Consultant representative's exercise of professional
judgment. Based on information obtained during such visits and such observations, Consultant's
representative will evaluate whether Contractor's work is generally proceeding in accordance with
the Contract Documents, and Consultant will keep Owner informed of the general progress of the
Work.
Consultant's inspector will prepare field reports of each site visit describing observations witnessed
during site visits. Consultant will prepare field reports for the additional thirty (30) site visits
performed through project completion.
The purpose of Consultant representative's site visits will be to enable Consultant to better carry
out the duties and responsibilities specifically assigned in this Agreement, and to provide the
OWNER a greater degree of confidence that the completed Work will conform in general to the
Contract Documents. Consultant shall not, during such visits or as a result of such observations of
Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall
the Consultant have authority over or responsibility for the means, methods, techniques, equipment
choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for
safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to
comply with laws and regulations applicable to Contractor's furnishing and performing the Work.
Consultant will recommend to the Owner that Contractor's work be disapproved and rejected while
it is in progress if, on the basis of such observations, Consultant believes that such work will not
produce a completed Project that conforms generally to Contract Documents.
TASK 2 — PROGRAMMING AND INTEGRATION — NO CHANGES
TIME SCHEDULE
Consultant's original proposal anticipated construction duration of twenty-four (24) months will be
required. Amendment 1 assumed a revised final completion date of May 17, 2024. This
Amendment 2 assumes a final completion date of August 2024. The updated construction duration
is thirty-seven (37) months.
FEESCHEDULE
We will provide these services in accordance with our Agreement for Professional Services for
Water Plant and Water Resources Engineering Services — RFQ 2019070, dated November 5, 2019,
by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant").
The Consultant will provide professional services on a lump sum fee basis as follows:
Task No. Task
WO #6(Previously Authorized
Amendment 1
Amendment 2
Revised Total
Task I Construction Phase Services
$865,774
$263,133
$51,359
$1,180,266
Task 2 Programming and Integration
$356,772
$0
$0
$356,772
Total Lump Sum Fee
$1,222,546
$263,133
$51,359
$1,537,038
K: (WPB CivillGenerallBlack0oridaVRCU10slo WTP Construction Phase (Amendment 2120240325 -Amendment 2 Oslo CPS.doc Page 2 oj6
Indian River County Utilities Department
ADDITIONAL SERVICES
The following services are not included in the Scope of Services for this project but may be
required depending on circumstances that may arise during the execution of this project.
Additional services include, but may not be limited to the following:
• Construction phase services beyond what is described herein
• Re -design or integration beyond what is described herein
K. IWPB_CivillGenerallBlackTTloridaURCUIOslo KTP Construction Phase (Amendment 2120240325 -Amendment 2 Oslo CPS.doc Page 3 of 6
/ndtan River County Utilities Department
K-• I WPB_CiviAGenera/lBlacklP7oridal/RCUIOslo WTP Construction Phase lAmendment 2120240325 -Amendment 2 Oslo CPS.doc Page 4 of6
Indian River County Utilities Department
ESTIMATE FOR ENGINEERING SERVICES
PROJECT: IRC Oslo WTP CPS - Amendment 2
CLIENT: Indian River County Utilities
ESTIMATOR NB
DESCRIPTION:
IRCU Oslo WTP CPS Amendment 2
MDM/TJ
PRINC
DIRECT LABOR
MAN-HOURS
X11
SEN
PROF
REG
PROF
BK
PROF
2
PROF
1
JF
DESIGN
INSP
SEN
SUPP
SUPP
STAFF
EXP
SUB
Dir Eip
4.68/6
WORKORDER6 AMENDMENT I
TOTAL TOTAL
AMFNDMINT2
TOTAL
NO TASK
1 CONSTRUCTION PHASESERVICES
Sit' Ai.its tu> 10'_50
60
60
1040
000
1600
$21073
$481.572.W
Amendment l: 100 Site Visits & Field Reports
12
80
100
600
$4983
Amendment 2: 30 S ite%'is its and Field Reports
30
90
210
$2,041
$46,411
Proeress Meeunu t3,,t
48
60
30
$I,275
$25,71857
Amendment l: 20 progress meetings
12
40
40
40
$1,004
522,840
Amendment 2:5 progress mwttinZs
10
10
10
$218
$4,948
Clantications, Recommendations Substitutes
40
40
nn
40
60
$1910
$3431047
Sho, Drmcinc Review h 150 w, l resubmittal each
40
_-,001
I
$48%
$95016.24
Amendment I: 10 shop drawings
20
40
20
$553
$12,57;
Re% c, Pr: ment Applications and Change Order Requests
20
$753
$15093.48
Amendment l: Pay Application Review x4
8
16
20
t,
$309
$7 (115
Stan -u p K i t n e s s Tessin g 4\ 20 days
60
60
240
120
$3,629
S82,529,40
Substantial (bm letion Site Visit Punchlist
12
40
24
S1,047
$14683.33
Final Com �letion
4
12
4
$361
$5428.64
Review record drawin ,,s and O&Ms
81
24
$686
$13,970 14
Amendment 1: AutoCAD Record Drawings
nn
80
$880
$20,000
Suhmit Construction Com pletion Cenitications (FDl,P
8
20
40
$596
$1',740.16
.Auend FDEP Pro'ect Walkthrounh & Pre
8
12
16
$283
$5,88262
Pemottin site Ian admin approval)
412
L20
P4(1
$157
$3,024.95
Admin(invoicing,re orts,etc.
24
24
$287
Amendment l: Admin for 10 more months
$328
$7,448
C&W -Electrical
8
C
20
-
$577
V", 79
Amendment 1: C&W Time & Effort see sub proposal)
10
1-1
S". v,5
$139
$25,420
Amendment 1: Davis -Bacon Wage Review
18
zn
St>39
$14,759
Amendment l: Davis -Bacon Interviews
4
xo
20
`6627
$14247,
Amendment l Asset List
10
Iraq
-In
SLC2
525522
2 PROGRAMMING AND INTEGRATION
CSD24
atl
12
$343440
$900
$356772.13
TOTAL HOURS
368
466
1970
18611144ol
27301 241
4981
$1,222,5461
5263,133
651.359
LABOR &HOUR
243
2201
1581
1291
1101
1251 1021
68
$0
$0
K-• I WPB_CiviAGenera/lBlacklP7oridal/RCUIOslo WTP Construction Phase lAmendment 2120240325 -Amendment 2 Oslo CPS.doc Page 4 of6
Indian River County Utilities Department