HomeMy WebLinkAbout2000-27240 CHANGE ORDER (Instructions on reverse side) No Three (3)—Final Central Helon MIT PROJECT. Phase„ I„Expansion„ to„2,.0 MGD DATE OF ISSUANCE ...... EFFECTIVE DATE ........................................... OWNER.=ndian River County ..................................................................................................... ' OWNERs Contract No. .,, 8067 . ......................... Indian River Industrial CONTRACTOR Contractors,.—Inc.... ENGINEER ..QAjnP..Px.(?ssel You are directed to make the following changes in the Contract Documents. Description: Partial Reconciliation Change Order Reason for Change Order. See Exhaibi t A Attachments: (List documents supporting change) Exhabit A — Final Reconciliation CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Partial Completion: December 30, s 10,672,415.00 Substantial completion:February ?A, �nnn Ready for finalpayment:Mareh 29, 2000 days or dams Net changes from previous Change Orders No. 1 to No. Net change from previous Change Orders No. —I— to No. s (4,537,580.32) 60 days (PC, SC & FC) days Contract Price prior to this Change Order AntTc rlrrS 69AVii ihin151ordT brua ry 2 8 , $ 6, 134, 834.68 Substantial Completion: Aori 1 98 9000 Ready for final payment:lMgA., &R, 9 n n n mmonr or dams NetxrXUROadecrease) of this Change Order Net Increase (10OVKof this Change Order $ 35,193.13 14 days (PC), 34 days (SC), 59 dal days Contract Price with all approved Change Orders Contractve Times with all a prod Change Orde Partial Completion: 6, 099, 641.55 Appr?l 13, 200( SubStagtial Completion: LTJMe 1 . 2000 s Read final Ready for payment.Tn1v2A, 900()days dams 1999 RECOMDED• APPROVED: ACCEPTED: BY: By: ur(Aurhonutl $ignyruml Owner t.4 rAan[<d $i ruturel y Camp Dres er & McKee Inc. Indian River County Indiah' `°9f29IYtrial Date: -J )I4$,2noC Contr etors In Date: SepternU r 1 2000 Date: EJCDC No. 19104-B (1990 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. 00800-25 i s (FC EXHIBIT "A" FINAL RECONCILIATION ITEM DESCRIPTIONS Indian River County Central Region WWTP Phase I - Expansion to 2.0 MGD CDM Project No. 6706-13899-070 Change Order No. 3 - Final Item No. 1 Description: Additional piping installation at headworks structure. Purpose: To facilitate future expansion connection without bypassing structure. Cost: $24,825.00 Time: 14 days (PC); 34 days (SC & FC) 2 Description: Disinfection basin pH meter conduit. Purpose: Install additional conduit for pH meter as required by FDEP permit. County staff to provide and install pH meter. Cost: $1,210.00 Time: 10 days (FC) 3 Description: Credit for independent testing laboratory services. Purpose: Credit Owner for remainder of bid form allowance. Cost: ($16,454.75) Time: 0 4 Description: Credit for building permit fees. Purpose: Credit Owner for remainder of bid form allowance. Cost: ($6,640.82) Time: 0 WIWAx 5 Description: t Painting of Equalization Splitter Box. Purpose: Paint exterior walls to match adjacent headworks structure. Cost: I $1,035.00 i Time: i 10 days (FC) 6 Description: Sales tax reconciliation. Purpose: County's purchase of equipment resulted in overall project savings in excess of $250,000 associated with sales tax. Amount reflects revision of equipment. Cost: ($17,681.56) Time: 0 7 Description: Odor Control monitoring conduit. Purpose: Install additional conduit to monitor pH of odor control equipment. Cost: $1,052.00 Time: 5 days (FC) 8 Description: Existing plant repairs. Purpose: Credit Owner for remainder of bid form allowance. Cost: ($23,728.00) Time: 0 9 Description: Grit discharge chute. Purpose: Install additional discharge chute for grit collection at headworks structure. Cost: $1,190.00 Time: 0 rWIVAd w EXHIBIT "A" FINAL RECONCILIATION CHANGE ORDER COST SUMMARY Indian River County Central Region WWTP Phase I - Expansion to 2.0 MGD CDM Project No. 6706-13899-070 Change Order No. 3 - Final This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead acceleration, material or other escalation which includes wages, and other impact costs. rb3187.doc Time Item No. Cost/(Credit) PC SC FC 1 $24,825.00 14 34 34 2 1,210.00 0 0 10 3 (16,454.75) 0 0 0 4 (6,640.82) 0 0 0 5 1,035.00 0 0 10 6 (17,681.56) 0 0 0 7 1,052.00 0 0 5 8 (23,728.00) 0 0 0 9 1,190.00 0 0 0 Total Change this C.O. No. 3 ($35,193.13) 14 34 59 This Change Order includes not only all direct costs of Contractor such as labor, material, job overhead, and profit markup, but also includes any costs for modifications or changes in sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead or general overhead acceleration, material or other escalation which includes wages, and other impact costs. rb3187.doc