CHANGE ORDER
(Instructions on reverse side) No Three (3)—Final
Central Helon MIT
PROJECT. Phase„ I„Expansion„ to„2,.0 MGD
DATE OF ISSUANCE ...... EFFECTIVE DATE ...........................................
OWNER.=ndian River County
.....................................................................................................
'
OWNERs Contract No. .,, 8067
. .........................
Indian River Industrial
CONTRACTOR Contractors,.—Inc.... ENGINEER ..QAjnP..Px.(?ssel
You are directed to make the following changes in the Contract Documents.
Description: Partial Reconciliation Change Order
Reason for Change Order. See Exhaibi t A
Attachments: (List documents supporting change) Exhabit A — Final Reconciliation
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Price
Original Contract Times
Partial Completion: December 30,
s 10,672,415.00
Substantial completion:February ?A, �nnn
Ready for finalpayment:Mareh 29, 2000
days or dams
Net changes from previous Change Orders No. 1 to No.
Net change from previous Change Orders No. —I— to No.
s (4,537,580.32)
60 days (PC, SC & FC)
days
Contract Price prior to this Change Order
AntTc rlrrS 69AVii ihin151ordT brua ry 2 8 ,
$ 6, 134, 834.68
Substantial Completion: Aori 1 98 9000
Ready for final payment:lMgA., &R, 9 n n n
mmonr or dams
NetxrXUROadecrease) of this Change Order
Net Increase (10OVKof this Change Order
$ 35,193.13
14 days (PC), 34 days (SC), 59 dal
days
Contract Price with all approved Change Orders
Contractve
Times with all a prod Change Orde
Partial Completion:
6, 099, 641.55
Appr?l 13, 200(
SubStagtial Completion: LTJMe 1 . 2000
s
Read final
Ready for payment.Tn1v2A, 900()days dams
1999
RECOMDED• APPROVED: ACCEPTED:
BY: By:
ur(Aurhonutl $ignyruml Owner t.4 rAan[<d $i ruturel y
Camp Dres er & McKee Inc. Indian River County Indiah' `°9f29IYtrial
Date: -J )I4$,2noC Contr etors In
Date: SepternU r 1 2000 Date:
EJCDC No. 19104-B (1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America.
00800-25
i
s (FC
EXHIBIT "A"
FINAL RECONCILIATION
ITEM DESCRIPTIONS
Indian River County
Central Region WWTP
Phase I - Expansion to 2.0 MGD
CDM Project No. 6706-13899-070
Change Order No. 3 - Final
Item No.
1
Description:
Additional piping installation at headworks structure.
Purpose:
To facilitate future expansion connection without bypassing
structure.
Cost:
$24,825.00
Time:
14 days (PC); 34 days (SC & FC)
2
Description:
Disinfection basin pH meter conduit.
Purpose:
Install additional conduit for pH meter as required by FDEP
permit. County staff to provide and install pH meter.
Cost:
$1,210.00
Time:
10 days (FC)
3
Description:
Credit for independent testing laboratory services.
Purpose:
Credit Owner for remainder of bid form allowance.
Cost:
($16,454.75)
Time:
0
4
Description:
Credit for building permit fees.
Purpose:
Credit Owner for remainder of bid form allowance.
Cost:
($6,640.82)
Time:
0
WIWAx
5 Description:
t
Painting of Equalization Splitter Box.
Purpose:
Paint exterior walls to match adjacent headworks structure.
Cost:
I
$1,035.00
i
Time:
i
10 days (FC)
6 Description:
Sales tax reconciliation.
Purpose:
County's purchase of equipment resulted in overall project
savings in excess of $250,000 associated with sales tax. Amount
reflects revision of equipment.
Cost:
($17,681.56)
Time:
0
7 Description:
Odor Control monitoring conduit.
Purpose:
Install additional conduit to monitor pH of odor control
equipment.
Cost:
$1,052.00
Time:
5 days (FC)
8 Description:
Existing plant repairs.
Purpose:
Credit Owner for remainder of bid form allowance.
Cost:
($23,728.00)
Time:
0
9 Description:
Grit discharge chute.
Purpose:
Install additional discharge chute for grit collection at headworks
structure.
Cost:
$1,190.00
Time:
0
rWIVAd
w
EXHIBIT "A"
FINAL RECONCILIATION
CHANGE ORDER COST SUMMARY
Indian River County
Central Region WWTP
Phase I - Expansion to 2.0 MGD
CDM Project No. 6706-13899-070
Change Order No. 3 - Final
This Change Order includes not only all direct costs of Contractor such as labor, material, job
overhead, and profit markup, but also includes any costs for modifications or changes in
sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead
or general overhead acceleration, material or other escalation which includes wages, and other
impact costs.
rb3187.doc
Time
Item No.
Cost/(Credit)
PC
SC FC
1
$24,825.00
14
34 34
2
1,210.00
0
0 10
3
(16,454.75)
0
0 0
4
(6,640.82)
0
0 0
5
1,035.00
0
0 10
6
(17,681.56)
0
0 0
7
1,052.00
0
0 5
8
(23,728.00)
0
0 0
9
1,190.00
0
0 0
Total Change this C.O. No. 3
($35,193.13)
14
34 59
This Change Order includes not only all direct costs of Contractor such as labor, material, job
overhead, and profit markup, but also includes any costs for modifications or changes in
sequence of work to be performed, delays, rescheduling, disruptions, extended direct overhead
or general overhead acceleration, material or other escalation which includes wages, and other
impact costs.
rb3187.doc