Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2001-008
40 • 40 GJ / 10 - {3- lI ako g ATTACHMENT A ENGINEERING SERVICES WORK AUTHORIZATICON DATE: WORK AUTHORIZATION NO. 15 FOR CONSULTING SERVICES COUNTY NO CAMP DRESSER & McKEE INC. CDM PROJECT NO. (consultant) I. Project Description Provide engineering services to implement well rehabilitation plans for four wells at the South County Water Treatment Plant (WTP). Contingency services for investigation and pulling of well head at Well No. 4 which appears to have been cemented in place. IL Scope of Services Attached. 11L Consullfng EngineerInstirmice RequircuieWs A. Workers Compensation Insurance in accordance with Florida Statutes. B. Comprehensive and Automotive Liability Willia minimum coverage of $100,000/$300,000 per occurrence for bodily injury or accidental death. C. Comprehensive general Liability with a ininimum limit of $100.000/S100,000 coverin47 pioperty damage. D. Liability for Property Damage, while operating, motor vehicle, with minimum limits of `5100,000 per occurrence. E. Contractual Liability including limits established for Items 11113, C, tint] D above. R Umbrella coverage, excess liability with minimum limits of $7.00,000 per occurrence. IV, Compensation for Services Task 1500 - Engineering Services for Well Rehabilitatitm South County WTP '$277,100 Upper Limit Contingency Services $55,420 Upper Limit {requires approval by County sta(f) Compensation for Task 1500 is to be paid on a saiary cast basis plus other direct costs on an as -needed basis. (See Attachments B-1 and B-2). A. Salm Cost Basis with Upper Limit For the Basic Services performed on a salary cost basis with an upper limit, iRC agrees to pay CDM as follows: eb5}98.�ine A-1 For engineering services performed by CDM, the payment will be equal to the salary cost of such services for each employee times 2.3 for overhead and profit plus actual out-of-pocket expense costs. Salary cost is equal to 1.393 times direct salary costs and is defined as the cost of salaries (including sick leave, vacation, and holiday pay applicable thereto) for time directly chargeable to the project; plus unemployment, excise, and payroll taxes; and contributions for social security, employment compensation insurance, retirement benefits, and medical and other group insurance Benefits. Actual out-of-pocket expense costs are all costs other than salary costs that are incurred during the progress of the work. The actual out-of-pocket expense costs include: air fare, automobile rental if required, mileage charges, parking tolls, taxi, meals and lodging, all in accordance with reimbursement rates set forth in Section 112.061 Florida Statutes (1999), as amended, and telephone, printing and reproduction costs, acid other miscellaneous costs incurred specifically for this project. The maximum cost for blueprint shells is $1.10. '11ie maximum cost for myl ar sheet is $11.00 and a sepia sheet is $5.00. The charges for in-house computer program and word processor usage will be at CDM"s regular rates. For outside computer services, charges will be made at invoiced cost to C13M, For the basic services performed on i salary cost basis with an upper limit, IRC agrees to provide a written request before work is started by CDM. SUBMITTED BY: CAMP DRESSER & MCKEE INC. E. [-awrence Adams, Jr., P.E. Vice President W i messed by: APPROVED BY: INDIAN RIVER COUNTY, FLORIDA Commissioner, Carolin' ➢. Ginn Chairman Approved by BCC 01-02-2001— Attest: Jeff$$ K. Barton, Clerk of Circuit Court County At cy DeputyClerk Approved as to Form and Legal Sufficiency Ja es E. CltandlLC unky Administrator iU3}7$.dm �IL�I 'CJRIM i • 40 • ATTACHMENT B SCOPE OF WORK Task 1500 - ENGINEERING SERVICES FOR WELL. REHABILITATION SOUTH COUNTY WATER TREATX%ENT PLANT Background The South County Water Treatment Plant is approximately 18 years old. Raw water is supplied by six wells constructed into the Floridan Aquifer. The depth of the wells reportedly ranges between 600 and 700 feet below ground surface. Wells 1 through 3 were the initial wells constructed with the original plant. Wells 4 through h were installed at a later expansion to the facility. Potential problems with the wells were identified by the County through the implementation of previous Work Authorization No. 13. Obstructions in the boreholes were identified in well nos. 1, 2, 3, and 5 that are potentially impiictin,g the performance of these wells. Based on the conditions of these wells, it has been determined that entering each of the wells and reaming out the borehole is the best means of,removing these obstructions. Services Task 1.0 Well Construction Related Contract L]ncumenls Preparation The Engineer will prepare contract documents for the reaming of each well under this subtask. Specifications will be prepared for ramming of the wells which will include requirements for: a construction sequence ■ qualikications r experience ■ equipment e drilling/reaming F+ casing protection ri cement r well development ■ rcporting and records r drilling fluids r disposal of drill cuttings and site cletuiup Task 2.0 Contract Administration The Engineer will conduct under this subtask administrative tasks associated with the construction management of this project. These activities include the prernnstrtiction meeting, biweekly progress meetings with the County and the contractor to discuss construction issues related to the project, generate monthly project summary reports, review appli,,:atiuns for 63399.d. 1-3-1 pity muitt, and coordination of the work. Permitting issues regarding reaming activities with the St. Johns River Water Management District are also included. Task 3.0 Monitor Contractor Progress lite Engineer will provide a qualified Resident Project Representative (RPR) to observe the contractor's progress and to determine, in general, if lite contractors executed work is being done in accordance with the contract documents. in addition, the RPR will be on-site to describe the lithology encountered, observe reaming operations, and monitor development activities. It is anticipated that the RPR will be onsite 70 percent of the time when well construction activities are occurring. In the event the contractor is late in completing; thu required work, the Engineer may require additional compensation for additional time -dependent services which may be required. CDM anticipates that it will take a contractor Gil days to substantially complete this project. Task 4.0 Flowmeter Evaluation The Engineer will evaluate proposed replacement flowmeters for Well Nos, 1, 2, and 3 at the South County Water Treatment Plant. Included in this task is assessing the condition of the existing meters, flowmeter alternatives and options, and evaluating perfeirmance characteristics of the proposed flowmeters. _ Task 5.0 rump Bearing [Wplacement Services associated with the previous workauthoriration included inspection of well pump bearings. The pumps at Well Nos. 7 through 4 are no longer manufactured and rephicement parts are not available. The well rehabilitation contractor had to have the replacement bearings specially made. Replacement costs total approximately $32,000. Contingency Services in the previous work authorization accounted for $25,040 of the cast. Tile remainder is included in the outside professional crisis. Contingency Services The pump and column of Well No -4 were idontified as being; slack during fieldwork associated With a previous work authorization. It is unknown how much effort will be requirutl to remove the pump and column at Well No. 4. he condition of the well is also unknown, so it is indeterminate if Well No. 4 requires reaming. The County has directed the Engineer to make an attempt to remove the pump and column at Well No. 4. To cover the potential costs of pump and column ren°roval and the reaming of Well No. 4, a Contingency Services allowance is provided for in thie, proposal. Activities designated under this allowance of 20% of the total amount will be performed only after receiving formal approval by Utilities Department personnel. Well No. 4 or the pump may become damaged as a consequence of the removal of tine pump and column. if this occurs, repair to the well and/or the pump could exceed the contingency funds that have been set aside. TW398.d" B-2 40 II do • ATTACHMENT B-1 TASK 1500 PROJECT BUDGET ENGINEERING SERVICES FOR WELL REHABILITATION o SOUTH COUNTY WATER TREATMENT PLANT PROJECT DESCRIPTION: Rehabilitation Program for Well Numbers 1, 2, 3, and 5 Catego y Hours Total Officer 24 Principal,/ Associate 78 Senior Professional 176 Professional II 268 Professional 1 fs0 Senior Support Services 2 Staff Support Services (Drafting) 56 Project Administration (Clerical) 38 702 Direct Salary Cost $21,910 Indirect Salary Cost (Fringe Benefit 0,393 x Direct Salary) $8,611 SALARY COST $iO�21 Salary Tithes Multiplier (2.30) $70,700 OUTSIDE PROFESSIONALS Well Contractor $184,000 Flow Meter 10,300 Pump Hearings 7,000 . 2{1I 300 OTHER DIRECT COST Copying and Printing $800 Compute/ CADD 1,200 Postage and Shipping 600 Travel 1,800 Telephone 1 200 TOTAL arHER DIRECT COSTS $5,600 TOTAL ESTIMATTED COSTS - UPPER LIMIT $277,100 CONTINGENCY (20%) - Well No. 4 $55,420 TOTAL. ESTIMATED ENGINEERING FEE (UPPER LIMIT) $332,520 rb339S.doc B-3 it" Q � C... N Q 40 @ ® o m S, jto o s = 0 2 \ m CkC14/ w o 0 0 o f a® ] o o S o u (D ƒ j� © 2 § ° k ) �a \] . * .. . \ / ° 2 2 2 f #rL k « e\ ez 22 2 76 /\ /J 2)) ]2 .2 N