HomeMy WebLinkAbout2024-251FIRST AMENDMENT TO THE AGREEMENT FOR LANDFILL GAS FLARE STATION
This FIRST AMENDMENT to that certain Agreement for Landfill Gas Flare Station is entered into
effect as of September 24, 2024, by and between INDIAN RIVER COUNTY, a Political Subdivision
of the State of Florida organized and existing under the Laws of the State of Florida, (hereinafter
called OWNER) and SCS Field Services (hereinafter called CONTRACTOR). OWNER and
CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows:
BACKGROUND RECITALS
WHEREAS, OWNER and CONTRACTOR entered into an agreement for services relating to
Landfill Gas Flare Station, effective July 2, 2024; and,
WHEREAS, the parties wish to modify the Work to include services defined and priced in
accordance with the proposals provided Exhibit i to this amendment.
NOW, THEREFORE, in consideration of the foregoing, and other good and valuable
consideration, the receipt and sufficiency of which are hereby acknowledged, the OWNER and
CONSULTANT agree as follows:
1. The background recitals are true and correct, and form a material part of this First Amendment.
2. The services detailed in Exhibit 1 to this First Amendment are hereby added to the Work under
the agreement.
3. All other terms and provisions of the Agreement shall be unchanged and remain in full force
and effect.
OWNER:
By:
us dams, Chairman
By:
John A. Titkanich, Jr., County 1
y Cpti1 M ISS j0•.
CONTRACTOR:
�`�� ^✓� FIVICES
B�:
P4jr J. Car co, Senior Vice President
•` •.'. i••'
�fR C0� . ••
'S al't1r••••' (Corporate Seal)
APPROVED AS TO FORM AND LEGAL
SUFFICIENCY:
By:
nifer . Shuler, County Attorney
Ryan L. Butler, Clerk of Court and
Comptr r
Attest:
Deputy Clerk
(SEAL)
F
� fLII
Attest:
Michael W. Mkauglilin, Secretary-
Exhibit 1 to the Amendment
Exhibit 1 consists of three documents:
1. Proposal to Purchase Landfill Gas Flare Station Electrical Gear, Dated August 29, 2024
2. Proposal to Install Leachate Evaporator Fiber Optics Cable and Control Panel, Dated
September 3, 2024
3. Proposal to Install Flare Station Electrical Service and Equipment, dated September 6,
2024
Environmental
Consulting & Contracting
August 29, 2024
Himanshu Mehta
Managing Director
Indian River County - Solid Waste Disposal District
1325 74th Avenue SW
Vero Beach, FL 32968
Subject: Proposal to Purchase Landfill Gas Flare Station Electrical Gear
Indian River County Landfill, Vero Beach, Florida
Dear Mr. Mehta:
SCS Field Services (SCS -FS) is pleased to provide this proposal to the Solid Waste Disposal District
(SWDD) for the subject work. SCS -FS is prepared to purchase materials upon receipt of your
approval. A summary of the list of materials, assumptions, and cost is outlined below based on
design drawings, parts list, and specifications provided by Bio Gas Engineering (BGE).
SCOPE OF WORK
SCS -FS and our sub -contractor, Onsite Electric (Onsite), will provide electrical materials for the future
installation of electric service to the new flare station skid and control panels based on the
specifications provided by BGE/Kupper Engineering, LLC. dated September 8, 2023. The materials
list includes the following:
• Fully assembled IPAC switchboard.
• Panel DP -1 including 1,200 Amp frame, feeders series rated 65ka, 100% rated fully
adjustable trip unit to 600 amps. Includes LSIG, energy reduction maintenance switch and
SPD 120KA protection per phase/60KA per mode. The panel includes all associated
breakers. Costs do not include ERMS/ground fault testing of panel DP.
• A TX -145 KVA step down transformer in a NEMA 3R enclosure 480v/120 -208v secondary.
• Panel RP -1 main breaker 150 Amps, 52 circuit interior at 10KA and all associated breakers.
• Three (3) concrete light pole bases 6'x 30" and engineered calculation certificate included.
• Three (3) 12'x 4" round tapered aluminum poles with wind load calculation included.
• Three (3) Dual 2" tenon flood light mounts.
• Six (6) 150 watt/22,200 lumens/100-277v rated slip fit mount fixtures.
Cost includes offloading of the DP panel, TX -1 transformer and RP -1 panel. All submittals are to be
approved by electrical design engineer prior to ordering materials. The estimated lead time for
materials is 22 to 26 weeks from notice to proceed.
ASSUMPTIONS
The scope of work is based on the following assumptions:
• The scope of work or cost does not include the electrical installation scope of work. That
scope of work is still under review and will be submitted in a separate proposal.
1800 Pembrook Dr., Suite 300, Orlando, Florida 32810
Mr. Himanshu Mehta
August 29, 2024
Page 2
• Electrical permits is not included in the scope of work.
• SCS -FS does not provide performance guarantees or warranties on equipment that SCS -FS
did not purchase. Warranties for equipment supplied by SCS -FS are based on the
manufacturer's terms and conditions.
• At a minimum, SCS -FS will have site access and permission to work Monday through
Saturday from 7:00 AM to 7:00 PM.
• The work area will be accessible and free of obstructions or other work activities performed
by others that could delay the installation process.
• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed.
• Additional change orders may be needed if changes to the scope of work are made after the
date of this proposal or if costs due to unforeseen circumstances exceed the contingency
budget.
• Payment terms to SCS -FS will be per Florida Prompt Pay Act.
COMPENSATION AND SCHEDULE
SCS -FS can perform the scope of work described for a lump sum cost of $116,000.00.
Due to the significant expense of materials and long lead times for shipment, SCS -FS will require a
60% down payment following approval of the electrical submittals by the electrical engineer and prior
to placement of the order. The remaining 40% will be invoiced to the County once all equipment is
received at the landfill and has been inspected by Onsite Electric.
60% Payment after electrical submittal approval: $69,600.00
40% Payment upon receipt of all electrical equipment: $46,400.00
Total Price, 100%: $116.000.00
CLOSING
SCS -FS appreciates the opportunity to provide our proposal to Indian River County. If you have
questions or require additional information, please contact Brian Basconi at 401-486-4897.
Sincerely,
Brian Basconi Garold (Tony) A. Cartee
Project Manager Regional Manager/ Vice President
SCS Field Services SCS Field Services
B B/GAC
Environmental
Consulting & Contracting
September 3, 2024
Himanshu Mehta
Managing Director
Indian River County - Solid Waste Disposal District
1325 74th Avenue SW
Vero Beach, FL 32968
Subject: Proposal to Install Leachate Evaporator Fiber Optics Cable and Control Panel
Indian River County Landfill, Vero Beach, Florida
Dear Mr. Mehta:
SCS Field Services (SCS -FS) is pleased to provide this proposal to the Solid Waste Disposal District
(SWDD) for the subject work. SCS -FS is prepared to order materials and schedule work upon receipt of
your approval. A summary of the list of materials, assumptions, and cost is outlined below based on
design drawings, parts list, and specifications provided by Kimley Horn.
SCOPE OF WORK
SCS -FS and our sub -contractor, Complete Electric, Inc. (CEI), will provide labor, equipment and electrical
materials for the installation of the leachate evaporator electrical panel and fiber optics cable that runs
from the new panel to the new flare station. CEI will perform the following tasks:
• Construct a support rack for the new Leachate Control panel where shown. Utilize 4" aluminum
vertical conduit, with stainless steel horizontal struts, and stainless steel fasteners/hardware.
• Supply and install a UL listed Leachate Control cabinet designed to meet the specifications on
sheets E -410A. and E-410 dated July of 2023. This will be a customer built to order control
cabinet for this application. It will include a N4X enclosure with Vents/Fans and Heat exchanger
along with the 480V, 20HP three phase VFD.
• Install conduit from the existing 480V electrical panel, to new Leachate panel.
• Install conduits from Leachate control panel, to Leachate tank pump/motor.
• Install a 3 pole 480V rated Square D EDB breaker in the existing 480V panel to supply the
Leachate project. Label panel upon completion to reflect these changes.
• Pull in 480V rated CU feeders from existing panel, to Leachate control panel, as well as 480V
feeders to the pump/motor at base of tank.
• Expose the existing in ground pull boxes that were installed for the Fiber cable. **If we are not
able to locate these boxes, additional fees will be required to address this issue.
• Provide and install (1) 12 strand (6 pair) tight buffer indoor/outdoor single mode fiber optic cable
from the Leachate project, to the new High Pressure Blower skid project. Utilize all existing
underground pull boxes, and conduits that were installed for this application.
• Terminate both ends of the fiber cable in a fiber enclosure with LC connectors as requested.
• Leave slack in cable at each end, as well as each pull box.
1800 Pembrook Dr., Suite 300, Orlando, Florida 32810
Mr. Himanshu Mehta
September 3, 2024
Page 2
All submittals are to be approved by electrical design engineer prior to ordering materials. The estimated
lead time for materials is 20 to 24 weeks from notice to proceed.
ASSUMPTIONS
The scope of work is based on the following assumptions:
• Only the items listed above are included in this quote. If further work is requested it will be
completed at a separate time and material rate.
• Electrical permits if required are included in the scope of work.
• SCS -FS does not provide performance guarantees or warranties on equipment that SCS -FS did
not purchase. Warranties for equipment supplied by SCS -FS are based on the manufacturer's
terms and conditions.
• At a minimum, SCS -FS will have site access and permission to work Monday through Saturday
from 7:00 AM to 7:00 PM.
• The work area will be accessible and free of obstructions or other work activities performed by
others that could delay the installation process.
• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed.
• Additional change orders may be needed if changes to the scope of work are made after the date
of this proposal or if costs due to unforeseen circumstances exceed the contingency budget.
• Payment terms to SCS -FS will be per Florida Prompt Pay Act.
COMPENSATION AND SCHEDULE
SCS -FS can perform the scope of work described for a lump sum cost of $135,500.00.
Due to the significant expense of materials and long lead times for shipment, SCS -FS will require a 30%
down payment following approval of the electrical submittals by the electrical engineer and prior to
placement of the order. The remaining 70% will be invoiced to the County upon completion of the scope
of work.
30% Payment after electrical submittal approval: $40,650.00
70% Payment upon completion of the scope of work: $94,850.00
Total_Plice 4Q"135,500.00
CLOSING
SCS -FS appreciates the opportunity to provide our proposal to Indian River County. If you have questions
or require additional information, please contact Brian Basconi at 401-486-4897.
Sincerely,
ti
Brian Basconi Garold (Tony) A. Cartee
Project Manager Regional Manager/ Vice President
SCS Field Services SCS Field Services
BB/GAC
Environmental
Consulting & Contracting
September 6, 2024
Himanshu Mehta
Managing Director
Indian River County - Solid Waste Disposal District
1325 74th Avenue SW
Vero Beach, FL 32968
Subject: Proposal to Install Flare Station Electrical Service and Equipment
Indian River County Landfill, Vero Beach, Florida
Dear Mr. Mehta:
SCS Field Services (SCS -FS) is pleased to provide this proposal to the Solid Waste Disposal District
(SWDD) for the subject work. SCS -FS is prepared to schedule work and purchase materials upon
receipt of your approval. A summary of the scope of work, assumptions, and cost is outlined below
based on design drawings, parts list, and specifications provided by Bio Gas Engineering (BGE).
SCOPE OF WORK
SCS -FS and our sub -contractor, Onsite Electric (Onsite), will provide labor, equipment and materials
for the installation of electric service and conduit to the new flare station skid and control panels
based on the specifications provided by BGE/Kupper Engineering, LLC. dated September 8, 2023.
The scope of work includes the following:
• Install all new service and switch equipment.
• Trench and backfill all underground conduit and stub -ups.
• Pull and terminate wiring to control panels and instrumentation.
• Install concrete pad for transformer.
General Notes:
• Conduit C -05C04 this conduit and fiber was established that it will be done by others.
• Conduit C-04C0l Onsite will provide all the conduit, pull wire, and terminate but the TYPE K
is provided by others.
• No fiber termination or any networking from RNG to flare skid controller.
• Tray cable was established that it will be installed by blower skid manufacturer and will be
terminated.
• It was established that conduit spacers or duct bank is not needed and engineer will revise
drawings.
ASSUMPTIONS
The scope of work is based on the following assumptions:
Electrical permits is not included in the scope of work.
As built survey is not included in the scope of work.
1800 Pembrook Dr., Suite 300, Orlando, Florida 32810 iJ
Mr. Himanshu Mehta
September 6, 2024
Page 2
• SCS -FS does not provide performance guarantees or warranties on equipment that SCS -FS
did not purchase. Warranties for equipment supplied by SCS -FS are based on the
manufacturer's terms and conditions.
• At a minimum, SCS -FS will have site access and permission to work Monday through
Saturday from 7:00 AM to 7:00 PM.
• The work area will be accessible and free of obstructions or other work activities performed
by others that could delay the installation process.
• SCS -FS may limit or restrict access to any and all traffic adjacent to the work area as needed.
• Additional change orders may be needed if changes to the scope of work are made after the
date of this proposal or if costs due to unforeseen circumstances exceed the contingency
budget.
• Payment terms to SCS -FS will be per Florida Prompt Pay Act.
COMPENSATION AND SCHEDULE
SCS -FS can perform the scope of work described for a lump sum cost of $376,000.00.
CLOSING
SCS -FS appreciates the opportunity to provide our proposal to Indian River County. If you have
questions or require additional information, please contact Brian Basconi at 401-486-4897.
Sincerely,
Brian Basconi
Project Manager
SCS Field Services
BB/GAC
Garold (Tony) A. Cartee
Regional Manager/ Vice President
SCS Field Services