Loading...
HomeMy WebLinkAbout2024-320SECTION 00942 - Change Order Form DATE OF ISSUANCE: 112/17/2024 No. 1 EFFECTIVE DATE:1211712024 OWNER: 'Indian River County CONTRACTOR Price Land, Inc. Project: Jackie Robinson Training Complex Walking Trail OWNER's Project No. 1908 OWNER'S Bid No. 2023041 You are directed to make the following changes in the Contract Documents: Reason for Change Order: The project is complete. This change order is intended to make final adjustments to bid line items to finalize the contract. Attachments: Description of Itemized Changes CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $1,322,979.64 Net increase (decrease) of this Change Order: $(434,188,30) Contract Price with all approved Change Orders: $888,791.34 ACCEPTED: JDaniel By: Date: (Signature) CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: 90 Final Completion: 120 Net increase (decrease) this Change Order: (days or dates) Substantial Completion: 120 Final Completion. 120 Contract Time with all approved Change Orders: (days or dates) Substantial Completion: 210 Final Completion: 240 RECOMMENDED: By: Rob Skok".*1 PROJECT MANAGER(Signature) I Date: APPROVED: Addie lave4�— By: OWNER (Signature) Date: IRC -1908 COI 20241217 00942-1 F:ftbficWorksNENGINEERING DIVISION PROJECTS11908 Jackie Robinson TC Walking Traihl-Admin%Agenda Iter"Trolw-1 Ckiseout%IRC-1908,.CO1_120241217.doe Rev, 05tol CHANGE ORDER NO. 1 DESCRIPTION OF ITEMIZED CHANGES PROJECT NAME: JACKIE ROBINSON TRAINING CENTER WALKING TRAIL PROJECT NO. IRC -1908 BID NO. 2023041 item No.Description Unit Quantity Unit Price Price Increase Price Decrease 334-1-53A SUPERPAVE APHALTIC CONCRETE, LEVELING COURSE TN 74 316.90 23,558.35 436-1-1 ]To TRENCH DRAIN, BEHIND BRIDGE SUPPORT LF 30 135.00 4,050.00 WCD1 RELOCATE EXISTING FIRE HYDRANT LS 1 6,496. 11 6.496411 WCD3 remove galvanized finish from original bridge scope and replace wit t LS 1 12,695.55 12,695.55 WCD4 Added materials striping, signage to entry & thermos to HIC Stalls. Re r LS 1 5,071.53 5,071 53 334 -1-53B SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C (TYPE SP - 12.5, 76-22, 1.5-) TN 133 289.65 38 523.45 WCD5 To remove bridge charges paid by IRC to Bridge Brothers, Inc. to ensure delivery of bridge on 7/29/2024 LS 1 336,791.00 336 791.00 WCD6 To charge for Bridge Brothers Invoice for Change Order No. 1 to correct placement of anchors/nuts & washers previously installed by Prince Land subcontractor LS 1.00 10,74538 10,745.38 Roundinq LS 1.00 0.01 0.01 344 -FA FORCE ACCOUNT LS 1 100,000.00 100,000.00 ISUBTOTALS� 51,871.54 485,059.84 JACKIE ROBINSON TRAINING CENTER WALKING TRAIL TOTAL $ (434,188.30) I FVAblic Woft%ENGINEERING DMWN PROJECTS1908 Jackie R0bk%WTCWa§*V TraA14AffkAAqwda Owm1Oroj Cb"ouNRG19"_C0I_20241217