Loading...
HomeMy WebLinkAbout2024-322SECTION 00942 - Change Order Form DATE OF ISSUANCE: 12/17/2024 No. 1 EFFECTIVE DATE: 12/17/2024 OWNER: Indian River County CONTRACTOR Southeast Services of the Treasure Coast, Inc. Project: CR512 & N. Broadway St. Drainage Restoration (Fellsmere) OWNER's Project No. IRC -2006 OWNER'S Bid No. 2024036 You are directed to make the following changes in the Contract Documents: Description: Raising buried manholes, internal grouting to fill and repair pipe surface defects and external pressure grouting of branch connections to the CR512 main drainage line. Reason for Change Order: Defects discovered during cleaning and video inspection of pipes. Attachments: Southeast Services, Inc. Estimate No. 6339, dated 12/3/2024 CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $215,234.70 Net increase (decrease) of this Change Order: $211,108.00 Contract Price with all approved Change Orders: $426,342.70 A>CCP Boutheast Services, Inc. CONTRACTOR (Signature) Date: p2- q "a CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Final Completion: 180 Net increase (decrease) this Change Order: (days or dates) Final Completion: 44 Contract Time with all approved Change Orders: (days or dates) Final Completion: 224 ' oti;MIsi; RECOMMEND By: Mark Winslow, P.E. ENGINEER (Signature) Date: / Z/ 3/ 2 q Attest: Ryan L. Butler, Clerk of Ci t Court and Comptroller Lucy awk APPROVED: oseph E. Flesher, Ch _ r; n OWNER (Signature) . Ri; fR C OU���:• Date: 12/17/24 •- APPROVED AS TO FORM AND LEGAL SUFFICIENCY " BY W, c ) su r AENNIFSA W. SHULER COUNTY ATTORNEY IRC -2006 -SES -COI -20241217 00942-1 F. Public Works\ENGINEERING DIVISION PROJECTS\2006 CR512 Drainage Restoration (Fellsmere)\t-Admin\Agenda Items\Change Orders\IRC- 2006_SES_CO1_20241217.doc Rev. 05101 ESTIMATE Southeast Services of the Treasure Coast, Inc. CG 815 10th Court SW Vero Beach. FL 32962 Bill to Indian River County Florida 1800 27th Street Vero Beach, FL 32960 seservices@bellsouth.net +1 (772) 226-7416 Estimate details Estimate no.: 6339 Estimate date: 12/03/2024 # Date Product or service 1. Asset Repair F 3. 4 Asset Repair Asset Repair Asset Repair P.O. Number: Storm Water repairs Job Number: IRC -2006 Job Location: C.R. 512 & N.Broadway Fel Ismere Description Southeast Services proposes the following repairs to the storm water system, pricing is inclusive of mobilization, materials, labor, and post repair TV inspection. 1-21 to 1-20 (P29) grout joint at 15.5' grout hole in pipe at 4 o'clock at 32.3' grout hole in pipe at 9 o'clock at 40.6' 1-21 to 8 (P30) grout joint at 11.2' grout defect at 15.1' grout defect at 23.4' grout defect at 12 o'clock at 38.9' (1) day - 1 -24 to M H 9 (P35) grout defect at 8 o'clock at 70.4' grout defect at 4 o'clock at 78.5' grout defect at 4 o'clock at 95.5' grout defect at 3 o'clock at 98.8' remove scale and grout at 99.1' grout joint at 100.1 ' (1) day - 1 -28 to MH 10 grout defect at 7 o'clock at 14.5' grout defect at 7 o'clock at 22.2' grout defect at 7 o'clock at 30.1' grout defect at 11 o'clock at 47.1' grout defect at 2 o'clock at 55.8 grout defect at 7 o'clock at 64.7' of file IT880fe Coast, Inc_ Ship to Indian River County Florida 1800 27th Street Vero Beach, FL 32960 Qty Rate Amount 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 2 $5,400.00 $10,800.00 5. 6. 7 91 9. Im Asset Repair Asset Repair Asset Repair Asset Repair Asset Repair grout joint at 68.9' grout defect at 7 o'clock at 72.8' grout defect at 7 o'clock at 78.5' grout defect at 2 o'clock at 81' grout defect at 7 o'clock at 88.6' grout defect at 7 o'clock at 105.1' (2) days 1-30 to 1-29 grout defect at 8 o'clock at 22.7' grout defect at 10 o'clock at 38.6' grout defect at 3 o'clock at 45.6' 1-30 to MH 10 grout defect at 3 o'clock at 12.6' grout defect at 9 o'clock at 21' grout defect at 12 o'clock at 27.7' grout defect at 9 o'clock at 36.5' (1) day 1-33 to 1-32 grout joint at 9' grout defect at 4 o'clock at 13.8' grout defect at 2 o'clock at 21.7' grout joint at 25.5' grout defect at 38' (1) day 1-33 to MH 11 grout defect at 12 o'clock at 12' grout defect at 12 o'clock at 19.2' grout joint at 25' grout defect at 3 o'clock at 49' grout defect at 3 o'clock at 54.6' grout defect at 3 o'clock at 62.5' grout defect at 2 o'clock at 70.1' grout defect at 4 o'clock at 79.4' grout defect at 3 o'clock at 100' (2) days MH 11 to MH 12 grout at 133.6' grout at 166' (1) day 1-19 to MH 8 (P28) Inclusive of chain cutting grout defect at 14.3' grout defect at 22.1' grout old lift ring at 30' (chain cut) grout defect at 38.1' (chain cut) grout lift ring hole at 46.4' grout lift ring hole at 55.9' grout hole at 6 o'clock at 62.4' grout hole in joint (W) at 66.9' grout hole at 9 o'clock at 70.5' grout joint out of tolerance at 74.9' grout hole at 7'o'clock at 78.4' grout joint out of tolerance (W) at 82.9' grout joint out of tolerance at 91.1' (4) days 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 2 $5,400.00 $10,800.00 1 $5,400.00 $5,400.00 4 $5,400.00 $21,600.00 is 12. 13 14 15 M. 17 18 Asset Repair MH 6 to MH 7 Chain cut and grout at 183' (2) days Asset Repair 1-9 to 1-10 (P-14) grout hole at 6 o'clock at 20' grout hole at 2 o'clock at 28.5' grout hole at 9 o'clock at 36.1' grout hole at 2 o'clock at 45.2' 1-10 to MH 5 No access concrete in pipe. (1) day Asset Repair 1-8 to MH 5 (P-13) grout hole at 4 o'clock at 22' grout hole at 6 o'clock at 29' grout hole at 10 o'clock at 37' grout hole at 6 o'clock at 45' grout hole at 7 o'clock at 50' grout hole at 3 o'clock at 52' install interior band at 66' grout hole at 2 o'clock at 70' grout hole at 4 o'clock at 77' grout hole at 7 o'clock at 85' grout hole at 2 o'clock at 92' (2) days Asset Repair 1-7 to 1-8 install band at 21' (1) day Asset Repair P-12 grout hole at 7 o'clock at 25.3' (1) day Asset Repair 1-16 to 1-17 (P-24) grout hole at 15' (roots W) grout hole at 3 o'clock at 23' (1&1) grout hole at 11 o'clock at 40' (1&1) (1) day Asset Repair 1-17 to MH 7 (P-25) grout at 67' (heavy I&I at 1-17) 1-13 to 1-14 (P-21) concrete wire blocking at 1-13 (1) day Asset Repair 1-15 to MH 7 (P-23) grout hole at 3 o'clock at 53' grout hole at 3 o'clock at 60' grout hole at 9 o'clock at 84.5' grout hole at 9 o'clock at 93' (1) day Asset Repair 1-26 to 1 -25 (P-36) (SD 26 to SD 25) grout hole at 3 o'clock at 16.1' grout hole at 2 o'clock at 23.6' grout hole at 7 o'clock at 31.4' grout joint at 35.4' grout hole at 9 o'clock at 40' (1) day 2 $5,400.00 $10,800.00 1 $5,400.00 $5,400.00 2 $5,400.00 $10,800.00 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 1 $5,400.00 $5,400.00 19. Asset Repair 20. Asset Repair 21 22. 23- 24. Asset Repair Asset Repair Asset Repair Asset Repair 25. Asset Repair 26. Asset Repair 27. Asset Repair 28. Asset Repair SD -26 to MH 9 (P-37) (1-26 to MH 9) 1 $5,400.00 $5,400.00 grout hole at 7 o'clock at 2' grout hole at 7 o'clock at 16' grout hole at 7 o'clock at 24.2' grout hole at 6 o'clock at 31.5' (1 day) SD -24 to SD -23 (P-34) 1 $5,400.00 $5,400.00 grout hole at 11 o'clock at 15.1' grout hole at 10 o'clock at 23.2' grout hole at 5 o'clock at 38.4' (1) day 1-19 to 1-18 (P-27) 1 $5,400.00 $5,400.00 grout hole at 7 o'clock at 14' grout hole at 7 o'clock at 22.1' grout hole at 1 o'clock at 30.4' grout hole at 9 o'clock at 38.6' (1) day 1-35 to MH 11 (P-50) 1 $5,400.00 $5,400.00 install band at joint at 40.5' (1) day 1-28 to 1-27 (P-39) 1 $5,400.00 $5,400.00 grout hole at 3 o'clock at 23.5' grout hole at 1 o'clock at 31' (1) day 1-37 to MH 12 (P-55) 1 $5,400.00 $5,400.00 grout hole at 12 o'clock at 27.5' grout hole at 7 o'clock at 45.3' grout hole at 7 o'clock at 42.5 grout hole at 4 o'clock at 70' (1) day 1-36 to 1-37 (P-54) 1 $5,400.00 $5,400.00 grout hole at 3 o'clock at 14' grout hole at 9 o'clock at 36' (1) day 1-39 to 1-40 (P-60) 1 $5,400.00 $5,400.00 grout hole at 11 o'clock at 7.3' grout joint out of tolerance at 20.5' grout joint at 29' (W) (1) day 1-38 to MH 13 1 $5,400.00 $5,400.00 grout hole at 8 o'clock at 12.4' grout hole at 9 o'clock at 19.5' grout hole at 8 o'clock at 28.2' grout hole at 10 o'clock at 36.5' grout hole at 8 o'clock at 44.8' grout hole at 4 o'clock at 53' grout hole at 12 o'clock at 61.2' (1) day 1-38 to catch basin (P -59C) 1 $5,400.00 $5,400.00 grout hole at 2 o'clock at 10.9' grout hole at 2 o'clock at 17.9' grout hole at 4 o'clock at 35.7' ['Z] 30. 31. 32. 33. 34. 35. 36- 37. Additional Days 5 Total Note to customer Southeast Services offers the above services in this proposal only. All proposals based on hourly rates are billed inclusive of travel time unless noted otherwise. Our proposal does not include Fuel surcharges, dump fees, retainage, surveys, engineering fees, as builts, layouts, permits, M.O.T sod replacement etc., unless otherwise noted. Client is responsible for clean water supply and dump site for all vacuum truck jobs unless otherwise noted. Southeast Services will charge to client any costs for special conditions (coverages) needed in regards to insurance requirements that are not standard within our policy. Accepted date Accepted by 1 $7,500.00 $7,500.00 1 $1,850.00 grout hole at 4 o'clock at 52.3' 1 $1,850.00 grout hole at 10 o'clock at 68.4' 1 $2,4.50.00 grout hole at 2 o'clock at 76.6' 1 $1,850.00 grout hole at 12 o'clock at 84.2' 1 $1,850.00 grout hole at 12 o'clock at 92' 1 $1,850.00 grout hole at 11 o'clock at 102' 1 $1,850.00 (1) day Asset Repair MH 1 to 1-2 (P-2) install interior band TBD & grout. (1-1/2) days Asset Repair Raise manhole #13 to grade. (1/2) day Asset Repair Raise manhole #14 to grade. (1/2) day Asset Repair Raise manhole #15 to asphalt grade. (1/2) day Asset Repair Raise manhole #16 to grade. (1/2) day Asset Repair Raise manhole #17 to grade. (1/2) day Asset Repair Raise manhole #23 to grade. (1/2) day Asset Repair Raise manhole #24 to grade. (1/2) day Services Bond Additional Days 5 Total Note to customer Southeast Services offers the above services in this proposal only. All proposals based on hourly rates are billed inclusive of travel time unless noted otherwise. Our proposal does not include Fuel surcharges, dump fees, retainage, surveys, engineering fees, as builts, layouts, permits, M.O.T sod replacement etc., unless otherwise noted. Client is responsible for clean water supply and dump site for all vacuum truck jobs unless otherwise noted. Southeast Services will charge to client any costs for special conditions (coverages) needed in regards to insurance requirements that are not standard within our policy. Accepted date Accepted by 1 $7,500.00 $7,500.00 1 $1,850.00 $1,850.00 1 $1,850.00 $1,850.00 1 $2,4.50.00 $2,450.00 1 $1,850.00 $1,850.00 1 $1,850.00 $1,850.00 1 $1,850.00 $1,850.00 1 $1,850.00 $1,850.00 1 $6,458.00 $6,458.00 $211,108.00