INDIAN RIVER COUNTY, FLORIDA
CHANGE ORDER NO. 3 U' _ 30
PROJECT NO: 9629B PROJECT: Shooting Range - Buildings
CONTRACTOR: William Glover, Inc.
286 N. Babcock Street
Melbourne, FL 32935
DATE OF ISSUANCE:
ITEM DESCRIPTION OF CHANGE QTY. UNIT UNIT PRICE PRICE
NO. PRICE INCRFASF nFCRFASF
Provide astaircase to the roof of the shotgun range.
1
LS
$2,982.00
$2,982.00
Provide a new steel deflector along the entire fascia of
the istol ran a firin line cover.
1
LS
$2,500.00
$2,500.00
Provide rafters at 1' spacing under steel panels on pistol
r5Band rifle ran a firin line covers.
1
LS
$2,339.00
$2,339.00
Provide four additional benches on the pistol range.
1
LS
$492.00
$492.00
7A Reconstruct the H/C firing points on rifle and pistol
ranges to include ramps and standard height benches.
1
LS
$1,760.00
$1,760.00
76 Reconstruct the 200 -yard firing points on the rifle range
to be centered in the 12' bays.
1
LS
$414.00
$414.00
7C Provide four additional benches on the rifle range.
1
LS 1
$492.00
$492.00
19 Provide a second baffle on the pistol range
1
LS
$16,686.00
$16,686.00
19A Reconstruct the partially completed baffle #1 on pistol
range; place the bottom at 8'-1/2" above the floor.
1
LS
$1,064.00
$1,064.00
19B Reconstruct the partially completed baffle #1 on the rifle
range to provide a bottom as per the original design.
1
LS
$1,350.00
$1,350.00
19C Add 8" to the bottom of baffles #3 & #4 on rifle range.
1
LS
$4,291.00
$4,291.00
19D Delete 16" from the bottom of baffle #5 on rifle range.
1
LS
$3,102.00
($3,102.00)
19E Delete the 2x8 at the top of all baffles.
1
LS
$1,176.00
($1,176.00)
19F Use 2x6 Tongue and Groove material on the front sides
of all baffles.
1
LS
$4,077.00
$4,077.00
22 Delete wooden range rules sign.
1
LS
$790.50
($790.50)
29 Extend underground service connections to the pull 1
boxes installed by FPL. Also, provide a weather proof
outlet at the golf cart parking pad.
1
LS
$2,657.00
$2,657.00
Subtotals=
Net Change =
$41,104.00 ($5,068.50)
$36,035.50
ORIGINAL CONTRACT PRICE/TIME
CURRENT CONTRACT PRICE/TIME AS
ADJUSTED BY PREVIOUS CHANGE ORDERS
NET CHANGE IN CONTRACT PRICE/TIME
DUE TO THIS CHANGE ORDER
NEW CONTRACT PRICE/TIME INCLUDING
THIS CHANGE ORDER
NEW CONTRACT COMPLETION DATE
$609,248.71 120 DAYS
$535,636.57 129 DAYS
$36,035.50 36 DAYS
$571,672.07 165 DAYS
F:\\Public Works\Capital Projects\Shooting Range\Buildings\changeorder3
February 17, 2001
INDIAN RIVER COUNTY, FLORIDA
CHANGE ORDER NO. 3
PROJECT NO: 96298 PROJECT: Shooting Range - Buildings
The price changes are
acre reals/onable and I recommend that the changes be made.
ENGINEER DATE
CONTRACTOR'S APPROVAL
I agree that the above changes in said Contract, in accordance with Specifications for the price
changes shown, are satisfactory.
2 -CONTRACTOR DATE
ACCEPTED BY: INDIAN RIVER COUNTY, FLORIDA
CHAIRMAN
Caroline D. Ginn
Fphruar; 1.1, 2001
DATE
Indian r. aunty Approved Date
Adminlstru � x � �,
Budget �� L
Legal 2P1
Nisk Management
Department L Z t
F:\\Public Works\Capital Projects\Shooting Range\Buildings\changeorder3