HomeMy WebLinkAbout2001-049p
AMMENDMENT #1
SCOPE OF WORK
ATTACHMENT to
AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN
BRAD SMITH ASSOCIATES, INC.
and
Indian River County Board of County Commissioners
1820 25th St.
Vero Beach, Florida 32960
PROJECT NAME AND LOCATION:
Jungle Trail/Pelican Island Refuge Enhancement Project
Indian River County Florida
SCOPE/SERVICES:
GENERAL: At the January 4, 2001 review meeting, it was determined that additional
services would be required for the project. These services include:
Cairns Site
A. Mitigation plan for wetland impacts:
1. Review drawings submitted to the SJRWMD and identify development and
mitigation areas in the field.
2. Identify existing wetland conditions that need improvement and the type
improvements that would provide the greatest wetland improvements.
3. Flag wetland boundaries in accordance with Chapter 62-340, F.A.C. and the
U.S. Army Corps of Engineers 1987 Wetland Delineation Manual.
4. Meet with SJRWMD to review the development wetland impacts, mitigation
areas, and mitigation ratios.
5. Prepare a mitigation plan including drawings, written narrative and tables and
submit the plan to the County.
B. Survey, Design and Permitting:
1) Provide additional topographic survey to include the access roadway and area
filled by the County for placement of the cottage.
2) Prepare revised design drawings and details for a stormwater management
system to serve the restroom, parking area and cottage area. The base plan
showing the layout and design of the cottage and ramp up to the cottage.
3) Prepare and submit a joint SJRWMD/ACOS permit application for the
improvements at the Cairns site. The previously prepared stormwater
management calculations report and exhibits will be revised to separate the
Attachment - 1
r.
40
Cairns site permitting package from the Surman/Kennedy sites permit package,
creating two separate permit application packages.
4) Coordinate with Environmental Consulting Group, Inc. relative to addressing
wetland mitigation issues and for obtaining responses to requests for additional
information from permitting agencies.
5) Perform a location survey of the on-site wetland as flagged in the held by
Environmental Consulting Group.
urman/Kennedy Sites:
A. Revise water and sewer design drawings and details to eliminate the restroom along
with water and sewer facilities serving the Surman site. The gravity sewer system
serving the Kennedy site will be replaced with a private pump station and force
main. The force main will be routed to the property line at S.R. A -1-A. CAI will
prepare and submit a "dry -line" FDEP sewer permit application for the facilities
serving the Kennedy site restrooms. The 4 -inch diameter water main will be
eliminated and a water service will be installed from the water main within S.R. A - 1-
A right-of-way to provide water service to the Kennedy site restrooms. No FDEP
water permit will be required. No FDOT permits will be required.
FEE ARRANGEMENT:
The Client agrees to pay the Landscape Architect for professional services as follows:
A lump sum of Thirteen Thousand Ten Dollars and 00/100 ($13,010.00), according to
the following schedule of values:
Cairns Site
Mitigation plan $6,200.00
Survey, Design & Permitting $4,870.00
Surman/Kennedy Sites
Revisions to water and sewer design drawings $1,940.00
Invoices shall be prepared on a monthly basis.
ADDITIONAL SERVICES: Additional services may include, but not be limited to the
following items:
A. Making revisions in drawings, or other documents when such revisions are
inconsistent with written approvals or instructions previously given, and are due to
causes beyond the control of the Landscape Architect.
Initial here:(Landscape Architect) Q_'Q� (County)
BCC Approved: 02-20-2001
Attachment - 2