Loading...
HomeMy WebLinkAbout2025-045FIRST AMENDMENT TO AGREEMENT FOR PHASE II DESIGN SERVICES for EMERGENCY OPERATIONS CENTER EXPANSION (RFQ 2022062) This First Amendment to that certain Agreement for Phase II Design Services for the Emergency Operations Center Expansion is entered into effective as of February 25, 2025, by and between Indian River County, a political subdivision of the State of Florida ("County") and Donadio and Associates Architects, PA, A Spiezle Group Inc. Company ("Consultant"). BACKGROUND RECITALS WHEREAS, the County and the Consultant entered into an Agreement for Phase II Design Services for the Emergency Operations Center Expansion effective July 2, 2024; and WHEREAS, Exhibit A of the Agreement contains the term and Proposed Fees; and WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement until the completion and closeout of the project, projected for May 31, 2026; and WHEREAS, the parties desire to amend Exhibit A Pricing to reflect additional design fees to accommodate a future 2nd floor; NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the County and the Consultant agree as follows: The background recitals are true and correct and form a material part of this First Amendment. 2. The Agreement shall now be effective through May 31, 2026. 3. The Exhibit A Pricing is amended to reflect additional pricing as reflected in the attached January 27, 2025 Amendment 1 request provided by the Consultant. 4. All other terms and provisions of the Agreement shall be unchanged and remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this First Amendment to be executed effective the day and year first set forth above. Donadio and As tes Architects, PA A Spiezle up In ., Company B: anted na e: Anthony J. Donadio Title: Principal (Corporate Seal) Date: 03/27/2025 INDIAN RIVER COUNTY, FLORIDA. BOARD OF COUNTY COMMISSIONERS Fw. Attest: Ryan L. Butler, Clerk of Circuit Court and Co ptrol//ler By: Deputy Clerk Appro A:i tkanich, Jr. County Administrator Approved as to form and legal sufficiency: *fifer . Shuler ounty Attorney {r .gsol,f_ i F ..r. of 's. t 4 - � €,�s � j ..;g^� ,tit 1eq$•w.. Y o a ..... .4y -.� . . _. ? 1 T; Exhibit A - Part 1 DONADIO & ASSOCIATES ARCHITECTS PA A Spiezle Group Inc. Company January 27, 2025 TO: Indian River County Department of Emergency Service Attn: David Johnson - Director/Fire Chief RE: Amendment No.1 to Agreement for Professional Services for Emergency Operations Center Expansion, RFQ No. 2022062 (IRC -2302) Dear Mr. Johnson: Attached are copies of TRC Worldwide Engineering and CMTA. proposals for additional architectural, mechanical, electrical, plumbing, and structural services. Architectural — Donadio & Associates Architects PA, $10,000.00 A Spiezle Group Inc. Company Structural — TRC Worldwide Engineering $10,400.00 (Proposal attached dated 01/15/2025) Mechanical, Electrical, & Plumbina -- CMTA $9,500.00 (Proposal attached dated 01/14/2025) Total Fees $29,900.00 All other terms and conditions remain per the Agreement for Professional Services for the Emergency Operations Center Expansion. If you have any questions regarding this Amendment 1, please feel free to contact our Office. Once this Amendment 1 is approved, please return one copy to authorize commencement of this additional work. Sincerely, Anthony J. Donadio AIA, NCARB Principal 2001 9th Avenue, Suite 308 1 Vero Beach FL 32960 1 Phone: 772.794.2929 1 Fax: 772.562.8600 License No. AR99546 TRC Worldwide Engineering 1230 N. University Drive Plantation, FL 33322 Phone: (954) 484-7777 www.trcww.com Date: 01-15-2025 SERVICE AUTHORIZATION FORM �I;R C WORLDWIDE ENGINEERING Project Number: 23FTL001.xxx Billing Group: Project Name: IRC EOC Expansion — Plan for Future 2nd Floor over Single Story to be Constructed Company Name Donadio & Associates, Architects / Spiezle Architectural Group, Inc. Company Address 2001 91' Avenue, Suite 308, Vero Beach, FL 32960 Attention: Anthony Donadio, Principal (adonadio(a-)spiezle.com ) We understand that this office has been requested to perform the following professional services: TRC is working on design of a single -story IRC EOC Expansion project. TRC has been requested to plan for a future 2nd floor on top of that single -story structure. The future 2nd floor will also include two stairs and one elevator starting from the foundation. These will be planned at the same time as the single -story expansion. Accordingly, TRC will analyze and design for a two-story building but prepare drawings only for a single story building with details for column and walls for vertical expansion. For this work our office will bill a lumpsum fee as follows: We will use the following terminology for this proposal. Phase 1 - Single Story Expansion of existing EOC. Phase 2 - Future Construction of 2nd floor on top of Phase 1 and addition of stairs and elevator outside the Phase 1 structure. Task Amount Calculate wind pressures for two story building $ 275.00 Schematic design of Phase 2 roof - No drawings to be prepared - Additional time $ 525.00 Redesign the Phase 1 roof as 2nd floor for Phase 2 in such a way that it can withstand the wind pressures of the Phase 1 and gravity loads of Phase 2 - for Additional time only $ 1,575.00 Schematic Design of the Phase 2 stairs and elevator shaft with their tilt up walls and foundation to make sure the structure systems work during construction of Phase 2 and foundation of Phase 1 are not undermined/ do not need underpinning. $ 1,300.00 Design the columns and size the tilt up walls for completed Phase 2 - 2 story structure but stop them above the Phase 1 roof - for Additional time only $ 1,300.00 Design the joints of the columns and the tilt up walls to enable Phase 2 extension for the 2nd floor. $ 3,100.00 Design foundation for 2 story building - for Additional time only $ 900.00 Coordinate all the above with Arch and MEP. $ 900.00 Additional CA for joints for Phase 2 $ S2S.00 Total $ 10,400.00 S E R V I C E I N N O V A T I O N Q U A L I T Y MOP � Ind vqw Oros 0 by—K. 0 1 tPSA Ay"W'i� Aw v zy q j jw NY am -i n won Q tact k Co. 112 e?0jqq" "qw. MCI 0 1 AV, out! n"if -01 .4 ins OP90 �10-' 0m, mr� TWO in! A 'n' 'So January 15, 2025 IRC EOC Expansion — Plan for Future 2nd Floor Page 2of3 The general terms and conditions for the contract executed on 01-18-2023 are applicable to this authorization. Any additional work not included in the above scope of work shall be charged per the Rate Schedule, attached. Reimbursable expenses include job site meetings, field observations, shipping and printing costs for distribution of drawings for permitting, bidding and/or construction. If the information contained herein is consistent with your understanding, please countersign or have this form countersigned by the appropriate person. This signature shall constitute an acknowledgement of an authorization to proceed with this work. Jenkins and Charland, Inc. Accepted and Authorized: dba TRC Worldwide Engineering Nom"/' Signature Nitin Ranadive P.E., Princi Printed Name Date: 01-15-2025 Enclosed: Rate Schedule Date: Signature Printed Name JAProjects\Projects-2023\001 - FTL Design\23FTL001-IRC EOC Expansion\CONTRACTS\2025.01.15_IRC EOC Exp - Plan for Future 2nd Story - Revised.docx Please Initial 7 ;;;�' C WORLDWIDE ENGINEERING January 15, 2025 IRC EOC Expansion — Plan for Future 2nd Floor Page 3 of 3 RATE SCHEDULE MANAGING PRINCIPAL / DIVISION MANAGER $ 250.00 PER HOUR PRINCIPAL $ 225.00 PER HOUR SENIOR PROJECT MANAGER $ 200.00 PER HOUR PROJECT MANAGER $ 185.00 PER HOUR PROJECT ENGINEER $ 150.00 PER HOUR INSPECTOR $ 125.00 PER HOUR CADD DESIGNER $ 125.00 PER HOUR CLERICAL $ 85.00 PER HOUR EXPERT WITNESS $ 350.00 PER HOUR ** Minimum hourly billings will apply to certain activities such as site visits and field reports, refer to the General Terms and Conditions attached for further information. ** The hourly rates listed above are only applicable to the 2025 Calendar Year, rates are subject to change on January 1s' of each subsequent year. Please Initial 7 R C WORLDWIDE ENGINEERING January 14, 2025 Mr. Anthony Donadio AIA, NCARB Principal Donadio & Associates Architects, PA A Spiezle Group Inc. Company 2001 9th Avenue, Suite 308 Vero Beach, FL 32960 6 • • 000'0: CMTA A L=_❑_nr-= RE: Professional Services Fee Proposal — Additional Service Request MEP/FP Design Engineering Services for Future Second Floor Vero Beach, FL Dear Tony: CMTA is pleased to present our additional service fee proposal for the above -referenced project. Following is a scope of work and compensation for the project. If the proposal is acceptable, please sign and return a copy for our files. Project Description: Provide engineering services to calculate and increase the required loads and equipment for the future second floor. This floor may be added after construction. This proposal only covers the required changes to the 15` floor systems that will be required to be upsized or present during construction of the first floor and not any design of the completed second floor. Scope of Work: Our basic scope of work will be as follows: Mechanical Engineering • Calculate the required tonnage for the future second floor to be used to calculate the electrical service upgrade and provide space in exterior equipment yard. Electrical Engineering • Design for Electrical Distribution system on first floor to add second floor panels in future. • Design for generator upgrade for second floor power. Plumbing Engineering • Design Engineering for Domestic Water Supply, Hot Water Source and Sanitary Sewer feeds to be used for future second floor. Fire Protection Design 181 Melody Lane Suite 107, Fort Pierce, FL 349501 561-466-1165 1 cmta.com Page 1 of 2 C MTA �=csn�s • Design Engineering for Fire Sprinkler System riser upgrade for additional flow to future second floor. Scope of Services: Our Scope of Work and Services will include the following: 1. Design Team Meetings 2. MEP/FP Specifications and Construction Documents (Revit (BIM) or AutoCAD). 3. Design Documents, Reviews and Responses for: • Schematic Design • Design Development • Construction Documents • Permitting • Bid Assistance • Construction Administration Services include Processing and Responding to Contractor RFI's, Shop Drawing Review and if necessary, up to 3 (2 man) Site Visits for Observation of Work and a Final Punch list (if required). Additional Site Visits will on►y be performed upon request and receipt of an authorization to proceed / acceptance fee of $750 per engineer, per visit. Compensation for Services: Our design fee for this additional service will be Nine Thousand Five Hundred Dollars ($9,500.00), with customary reimbursable expenses estimated to be $250.00 (Expenses to be billed at Direct Cost). Services required beyond basic scope shall be negotiated on an as needed basis at which time a proposal for additional services will be provided. If you find this proposal acceptable, please return to us one signed copy so we can schedule this project. Should you have any questions, please do not hesitate to give us a call. Accepted by: James Burchard, Partner, Senior Project Manager CMTA james.burchard@cmta.com 772-519-1573 Cc: Randy Stewart Accepted by: Spiezle Group Inc. Signature Name (Print) Date Page 2 of 2