Loading...
HomeMy WebLinkAbout2025-021WORK ORDER 7 This Work Order Number 7 is entered into as of this 28 day of January , 2025 , pursuant to that certain Continuing Contract Agreement, dated May 2, 2023 (referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Geosyntec Consultants, Inc. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the mutually agreed upon lump sum or maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing, and at a rate not to exceed the prices set forth in Exhibit B (Rate Schedule) of the Agreement, made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: Print Name: Todd K. Kafka, PG Title: Vice President BOARD OF COUNTY COMMISSIONERS ,Go..... OF INDIAN RIVER COUNTYy,. Q: s* . By: seph . Flescher, Chairman o r' BCC Approval Date: January 28, 2025`i ;; 1 ►�''�' Attest: yan L. Butler, C erk of Court and Comptroller By: y_ Deputy C%errkl G By: ohn A. Ti anich, Jr., County dministrator Approved as to form and legal sufficiency: 7 her A. Hicks, Assistant County Attorney EXHIBIT A PROFESSIONAL SERVICES Geosynte& consultants Mr. Himanshu H. Mehta, P.E. Managing Director Solid Waste Disposal District Indian River County 1325 74th Avenue SW Vero Beach, Florida 32968 1200 Riverplace Boulevard Suite 710 Jacksonville, FL 32207 PH 904-856-1818 waw eeosvntec coin 20 December 2024 Subject: Proposal to Provide 2025 Compliance Monitoring, Reporting, Preparation of July 2023 -December 2025 Technical Report and Other Technical Support Services Class I Landfill and C&D Debris Disposal Facility Indian River County Landfill Facility Vero Beach, Indian River County, Florida Dear Mr. Mehta: Geosyntec Consultants, Inc. (Geosyntec) is pleased to submit this letter proposal to the Indian River County (IRC) Solid Waste Disposal District (SWDD) to provide professional services supporting the operation of the Class I landfill and Construction and Demolition (C&D) debris disposal facility at the IRC Landfill (IRCL) site located in Vero Beach, Indian River County, Florida. The proposal presents the scope of work, schedule, and budget estimate for the compliance monitoring, reporting and other technical support services related to the operation of the solid waste disposal facilities in 2025. The proposal also presents the scope of work, schedule, and budget estimate for the preparation of the July 2023 to December 2025 Technical Report for the Class I Landfill and C&D Debris Disposal Facility to comply with the permit requirements. Geosyntec has prepared this proposal for professional services as Exhibit A of Work Order Number 7, pursuant to that certain Continuing Contract Agreement, dated 2 May 2023 ("Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Geosyntec ("Consultant"). The remainder of this proposal presents: (i) project background; (ii) proposed scope of services; (iii) schedule; and (iv) budget estimate. NCP2323548UO25 Compliance Monitoring Proposal_F engineer., I scientists i innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 2 PROJECT BACKGROUND The IRCL site is located south of Oslo Road, west of Range Line Road (74th Avenue) and east of Interstate 95 in Section 25, Township 33 South, Range 38 East in Indian River County, Florida. The IRCL site occupies 276 acres, with approximately 141.5 acres permitted for Class I disposal, 22 acres is comprised of Cell l C&D debris disposal facility, and 2.5 acres consists of a C&D debris recycling facility. The Class I landfill currently accepts both Class I waste and C&D debris for disposal under the Florida Department of Environmental Protection (FDEP) Construct and Operate Permit Modification Nos. 0128769-026-SC-IM and 0128769-033-SO-MM, dated November 30, 2022 (Class I Permit). The C&D debris disposal facility operates under FDEP Permit No. 0128769- 032-SO-24, dated June 1, 2022 (C&D Permit). Semi Annual Water puality Compliance Monitoring and Reporting The Water Quality Monitoring Plan (WQMP) for each of the IRCL facilities permits (which is listed as Appendix 3 of each permit) indicates that groundwater and surface water quality monitoring are required. Semi-annual sampling of the Class I landfill and C&D debris disposal facility groundwater monitoring wells shall be conducted in January and July 2025. The samples collected from the Class I landfill and C&D debris disposal facility monitoring wells shall be analyzed for the routine monitoring parameters listed in Section II.3 (Class I Permit) and Paragraph 8 (C&D Permit) of the WQMP, respectively, as required by paragraphs 62- 701.510(5)(c) & (7)(a) and 62-701.730(8)(d), Florida Administrative Code (F.A.C.). Samples from one surface water monitoring site (SW-2) shall be collected semi-annually in January and July, if water is discharging from the stormwater pond. The samples, if collected, shall be analyzed for the list of parameters listed in Section III.2 of the Class I Landfill WQMP, as required by paragraphs 62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will perform the field sampling activities, and the analytical testing will be conducted by Eurofins Scientific Laboratory (Eurofins), the analytical laboratory contracted with, and direct bill to, SWDD. The results of the semi-annual water-quality monitoring events are to be reported to the FDEP within 60 days of receipt of analysis from the laboratory. Ouarterly Assessment Monitoring for the C&D Debris Disposal Facility Geosyntec understands that results of routine sampling of C&D debris disposal facility groundwater monitoring well (MW-21 S) in January 2017 indicated exceedances of benzene and sodium groundwater cleanup target levels (GCTLs). As a result, the SWDD was requested by the FDEP to initiate evaluation monitoring in accordance with subsection 62-701.510(6), F.A.C. NCP2323548/JL23073 2025 Compliance Monitoring Proposal engineers I scicrttists I innovalors Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 3 Pursuant to this request the SWDD installed one groundwater monitoring well (MW -49S) in July 2017. These and other wells (MW -21S, MW -335, MW -35S, MW -40S, MW -49S, MW -50S, MW -51 S, and MW -52S) and seven surface water (SW) Lateral Canal (LC) sample sites (SW - LCI, SW-LC2, SW-LC3, LC-SW4, LC-SW5, LC-SW6, and LC-SW8) have been sampled quarterly from July 2017 to October 2020 under an evaluation monitoring program with the FDEP. However, in correspondence dated 14 October 2019 from the FDEP to the SWDD, the FDEP approved the SWDD's request to replace the evaluation monitoring of the eight groundwater wells and surface water sample sites with quarterly assessment monitoring and with the addition of other parameters (arsenic, benzene, naphthalene, and other semi -volatile organic compounds [VOCs]) to the suite of parameters to be analyzed for at these wells. The FDEP also requested sampling of additional surface water sites in the Lateral C Canal for the purpose of establishing background water -quality conditions. Therefore, in 2020 Geosyntec working on behalf of the SWDD sampled all seven surface water sites except for April 2020 where the FDEP agreed to a reduction to three locations. The reduction to three surface water sampling locations was approved for sampling events and the total number of surface water sampling locations is assumed to be seven for the 2025 sampling events. In 2021, Geosyntec working on behalf of the SWDD eliminated six surface water sampling locations (SW-LC2, LC-SW5, LC-SW7, LC-SW8, LC-SW9 and LC -SWI 0) and discontinued the sampling of MW -33S and MW -35S. Additionally, Geosyntec working on behalf of the SWDD in 2021 reduced the collection frequency of arsenic, benzene, naphthalene, 1 -methylnaphthalene, 2 -methylnaphthalene, acenaphthene, and anthracene at MW -21S and MW -49S from quarterly to semi-annual. Geosyntec will continue working with the FDEP to further reduced the surface and groundwater quarterly sampling scope at the C&D debris disposal facility in 2025 in order to provide overall cost savings to the County. Therefore, in addition to the semi-annual sampling of the C&D debris disposal facility monitoring wells in January and July 2025, six wells and four surface water sample sites will also be sampled in April and October 2025 as part of the 2025 compliance monitoring and reporting program. Quarterly Assessment Monitoring for the Class I Landfill A comment letter from the FDEP dated 6 May 2020 provided comments regarding the results of the January 2020 Semi -Annual Water Quality Monitoring Report for the Class I landfill. The FDEP provided notification to the SWDD to initiate evaluation monitoring at all monitoring wells with detected exceedances above applicable (GCTLs for pH, ammonia, chloride, sodium, total dissolved solids (TDS) and arsenic. Geosyntec provided a response to comments (RTC) letter to the FDEP comment letter on 28 May 2020 which focused on the long-term trends with the dataset available from the FDEP Water Assurance Compliance System (WACS) database and requested a reduction of evaluation monitoring locations from 25 locations (as originally NCP2323548/JL23073_2025 Compliance Monitoring Proposal engineers I scientists I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 4 requested by the FDEP in the 8 May 2020 letter) to four (4) locations (specifically downgradient of MW -3S, MW -14S, MW -44S and MW -44I). The FDEP approved this request in a letter dated 14 August 2020 and the 90 -day evaluation monitoring period was initiated on 17 September 2020 through a second RTC letter provided to the FDEP. Geosyntec installed the three (3) groundwater evaluation monitoring wells in November 2020 (evaluation monitoring well not installed downgradient of MW -14S since MW -14S was already located at the edge of the Class I landfill zone of discharge), sampled the four (4) quarterly wells and collected field parameters from two staff gauges (C5 -SWI and C5-SW3) for Total Ammonia Nitrogen (TAN) calculation in November 2020. During the 2021 quarterly sampling, Geosyntec working on behalf of the SWDD reduced the quarterly parameters analyzed and negotiated the use of a site-specific ammonia GCTL based on TAN calculations thus adding a surface water screening location north of MW -53S. In 2024, Geosyntec further reduced the sampling scope for the remaining evaluation monitoring wells at the Class I landfill. Therefore, sampling of the four Class I landfill groundwater evaluation monitoring wells and four surface water field parameter screening locations will be included in the 2025 quarterly monitoring and reporting program. Storne Tank Groundwater Monitoring Wells Sampling and Reporting Permit Modification No. 0128769 -033 -SO -MM and Approval of Request for Alternate Procedure — SWAP 22-1 (i.e., Order), effective 22 July 2022, authorized the SWDD to use an existing 500,000 -gallon tank as a leachate storage tank for the leachate evaporator system for the Class I Landfill. Conditions of this approval required the SWDD to install four new groundwater monitoring wells (MW -49 to MW -52) around the periphery of the leachate storage tank, which were installed in February 2023. Upon well installations, the SWDD was also required to conduct an initial and three additional sampling events (on a weekly basis) and conduct two quarterly. sainpiing events after the initial filling of the tank with leachate. Based on the timeline of when the tank was initially filled with leachate on 30 August 2023, the well installations, initial sampling event, and three weekly sampling events were documented to the FDEP in 2023. In 2024, Geosyntec completed four quarters of sampling from these wells and submitted the two Semiannual Reports. Based on review of the July 2022 Order, in 2025, the quarterly sampling is required to continue and an Annual Report will be submitted to FDEP on behalf of SWDDD. Preparation of July 2023 to December 2025 Technical Report The Water Quality Monitoring Plan (WQMP) for each of the IRCL facilities permits (which is listed as Appendix 3 of each permit) requires the preparation and submittal of a Technical Report to FDEP every two and one-half years during the active life of the facility, and every five years NCP2323548/JL23073 2025 Compliance Monitoring Proposal cnginccrs I scicnti;ts I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 5 during the long-term care period. The report shall summarize the water quality monitoring results and water level measurements collected since the last Technical Report. The last Technical Report for both facilities was submitted to FDEP on 31 July 2023 for the reporting period January 2021 through June 2023. The next Technical Report for the reporting period July 2023 through December 2025 is due for submittal to FDEP by 31 January 2026 and is included in this proposal. Title V Air Operation Permit Compliance The SWDD was issued a Title V Air Operation renewal permit (Permit No. 0610015 -008 -AV), proposed on 7 December 2022. The permit requires that the SWDD prepare and submit to the FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4 the following: • Annual statement of compliance (within 60 days after the end of the calendar year); • Electronic Annual Operating Report (AOR) and Title V Emissions Fee (on or before April 1 of each year, for the previous calendar year); • Semi -Annual Monitoring Report (scheduled for March l and August 29); and • Results of an annual landfill gas (LFG) sulfur content test (Annual Emissions Report for Sulfur Dioxide letter report and included in the Electronic Annual Operating Report). The annual emissions fee is automatically calculated based on emissions reported for marked pollutants on the FDEP's electronic Annual Operating Report (EAOR). Upon submission of the EAOR, the Annual Title V Emissions Fee invoice is generated, and this must be paid by April 1, 2025 for the 2024 reporting period. Landfill Gas Migration Monitoring The Class I Landfill solid waste permit also requires quarterly monitoring of LFG migration around the perimeter of the site and within enclosed structures. Multi Sector General Permit The SWDD authorization to discharge the overflow of stormwater from the sedimentation pond into the C-6 canal is governed by a five-year Multi Sector General Permit (MSGP) issued by the FDEP. The permit requires that the outfall be sampled quarterly during the first and fourth year of the permit for a list of parameters and the results reported to the FDEP by the first quarter of the fifth year of the permit. This proposal presents the scope of work and budget estimate for the: (i) semi-annual water - quality compliance monitoring and reporting for the Class I landfill and C&D debris disposal NCP2323549AL23073_2025 Compliance Monitoring Proposal cn};ineers I �cieutias innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 6 facility; (ii) quarterly assessment monitoring of the eight groundwater wells and three surface water sample sites for the C&D debris disposal facility; (iii) quarterly evaluation monitoring of the groundwater wells and surface water sample sites for the Class I landfill; (iv) storage tank monitoring well sampling and reporting as required by the Order; (v) compliance with Title V permit requirements; (iv) preparation of the July 2023 to December 2025 Technical Report; and (v) other technical and miscellaneous permit compliance support services that may be required by the SWDD in 2025. PROPOSED SCOPE OF SERVICES The proposed scope of services includes activities to be performed on behalf of the SWDD for the compliance monitoring reporting and other technical support services for the Class I landfill and C&D debris disposal facility. For the purpose of budgeting, the scope of work has been divided into the following seven (7) main phases: • Phase I —General Consulting/Meeting Support/Project Management; • Phase 2 — Semi -Annual Sampling and Reporting; • Phase 3 — Quarterly Assessment Monitoring and Reporting; • Phase 4 — Storage Tank Groundwater Monitoring Well Sampling and Reporting; • Phase 5 — Preparation of July 2023 to December 2025 Technical Reporting; • Phase 6— Title V Permit Compliance and Reporting; and • Phase 7— Technical and Miscellaneous Permit Compliance Support and Reporting. The above scope of services is based on current regulations and reporting requirements for the IRCL facility as previously discussed above. An amendment to this scope of services may be needed should there be any regulatory changes that result in additional work. The remainder of this section presents a general description of the activities to be performed in each phase. Phase 1 General Consulting/Meeting Support/Project Management Under this phase, Geosyntec will perform project planning and management responsibilities, such as correspondence with the SWDD and FDEP, invoice review, project coordination, and project administration. Project management activities will include budget and schedule tracking, invoice review, and project communications, including the preparation of a monthly progress report. The report will include a description of the activities completed during the month and planned activities for the following month. Geosyntec has also included budget for preparation NCP2323548/JL23073 2025 Compliance Monitoring Proposal engineers I scientist; I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 7 and attendance (by two Geosyntec personnel) at one meeting with the SWDD and/or FDEP, as needed. Phase 2 Semi Annual Sampling and Reporting (Both C&D Debris Disposal Facility and Class I Landfill) Geosyntec will assist the SWDD to perform the semi-annual sampling and prepare the water - quality monitoring reports as required by the WQMP. Geosyntec will assist the SWDD with conducting all field sampling preparation activities, including scheduling, staffing, subcontracting, and field equipment preparation. Prior to collecting the groundwater samples in January and July 2025, Geosyntec will perform water -level measurements from the Site monitoring well network and installed staff gauges adjacent to the Site. Geosyntec will then perform semi-annual sampling of the Class I landfill and C&D debris disposal facility groundwater monitoring wells in January (34 wells) and July (25 wells) of 2025. We will also perform semi-annual (January and July) sampling of the surface water site (SW -2) if it is discharging from the stormwater pond. It is estimated that data collection and sampling will take five (5) full days in January and four (4) full days in July for the semi-annual monitoring and reporting for the Class I landfill and C&D debris disposal facility. Geosyntec will deliver the samples to Eurofins laboratory for analytical testing under the SWDD's contract (i.e., Eurofins laboratory will directly invoice the SWDD). The laboratory analytical testing will be conducted by Eurofins testing laboratory. The samples collected from the Class I landfill monitoring wells will be analyzed for the routine monitoring parameters listed in paragraph 7 of the WQMP and in accordance with paragraph 62- 701.510(5)(c) & (7)(a), F.A.C. The samples collected from the C&D debris disposal facility monitoring wells, with the exception of the quarterly assessment wells, will be analyzed for the routine monitoring parameters listed in paragraph 8 of the WQMP and in accordance with 62- 701.739(8)(d), F.A.C. The samples from the surface water site (SW -2) will be analyzed for the list of parameters listed in Section I1I.2 of the Class 1 Landfill WQMP, as required by paragraphs 62-701.510 (5)(d) and (7)(b), F.A.C. Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical test results, and prepare the semi-annual reports. The results of water -quality sampling under the WQMP will be presented in a report supported by attachments containing chain -of -custody sheets, field notes and observations, water sampling logs, maps, analytical results, and any other applicable materials. The reports will include groundwater completion report form and groundwater elevation contour map, both signed and NCP2323548/JL23073 2025 Compliance Monitoring Proposal ongincers I sciewists I innw:nors Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 8 sealed by a Florida registered professional engineer. These reports will be submitted to the SWDD for review prior to submittal to the FDEP. The reports (in Adobe format) and analytical data Electronic Data Deliverable (EDD) will be submitted electronically to the FDEP using the ADaPT software in accordance with Section V.E of the WQMP. According to the WQMP, monitoring test results shall be submitted to the FDEP within 60 days from completion of laboratory analyses. Phase 3 Quarterly Assessment Monitoring and Reporting (Both C&D Debris Disposal Facility and Class I Landfill) Geosyntec will perform quarterly sampling events for Calendar Year 2025 (January, April, July, and October) of five (5) groundwater wells (MW -21 S, MW -495, MW -505, MW -51 S, and MW - 52S) and four (4) surface water sample sites (SW -LCI, SW-LC3, LC-SW4, and LC-SW6) for the C&D debris disposal facility and at seven (7) groundwater monitoring wells (MW -3S, MW - 145, MW -44S, MW -44I, MW -535, MW -54S, and MW -54I) and four (4) surface water samples (C5 -SWI, SW -MW -145, SW -MW -53S, and SW -MW -54S) for the Class I landfill. The January and July sampling will be performed as part of the semi-annual sampling program under Phase 2 for the C&D debris disposal facility and assumed to take three (3) additional days to complete. The April and October data collection and sampling will each take four (4) days to complete. Geosyntec will deliver the samples to Eurofins laboratory for analytical testing under the SWDD's contract (i.e., Eurofins will directly invoice the SWDD for laboratory charges). For the C&D debris disposal facility, the quarterly assessment monitoring samples (including those collected in January and July) will be analyzed for the routine monitoring parameters listed in Paragraph 8 of the WQMP (C&D Permit) plus arsenic and benzene. For the Class I landfill, the quarterly assessment groundwater monitoring samples will be sampled for parameters as required by subparagraph 62-701.510(6)(a)3, F.A.C. The surface water samples will be screened for field parameters. Geosyntec will assist the SWDD in coordinating the analytical testing activities with Eurofins, notify the FDEP prior to sampling as required by the WQMP, review and evaluate the analytical test results, and prepare a letter report for each quarterly assessment monitoring event. The reports will be submitted in draft forms to the SWDD for review and comment and will be finalized, with the SWDD's comments implemented, for submittal to the FDEP. Any changes to the monitoring and reporting requirements that might be requested by the FDEP based on the results of the quarterly assessment monitoring will be performed under Phase 7 below. NCP2323548/JL23073 2025 Compliance Monitoring Proposal rn"'invert I scicntin. I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 9 Phase 4 — Storage Tank Monitoring Well Sampling and Reporting In accordance with Table 2 of the Order, Geosyntec will assist the SWDD with quarterly monitoring of well associated with the leachate storage tank, analytical testing by Eurofins under direct contract to the SWDD, and preparation of the 2025 annual summary report for submittal to the FDEP. Phase 5 — Prepare July 2023 — December 2025 Technical Report Geosyntec will prepare the Technical Report for the Class I landfill and C&D debris disposal facility. The report will summarize and interpret water quality data and water level measurements collected over the last two and one-half (2.5) years of operation and covering five (5) semi-annual reporting events from July 2023 through December 2025. The Technical Report will comply with the requirements of the Facilities WQMPs, and will address the following: • tabular and graphical display of the data that show a monitoring parameter has been detected, including hydrographs for all monitoring wells; • trend analysis for detected parameters; • comparison among shallow, intermediate and deep zones; • comparison between up -gradient and down gradient monitoring wells; • correlation between related parameters; • discussion of erratic and/or poorly correlated data; • an interpretation of groundwater contour maps; and • an evaluation of the adequacy of the monitoring plan. Geosyntec will submit the report to the FDEP by 31 January 2026. Phase 6 — Title V Permit Compliance and Reporting Geosyntec will assist the SWDD in complying with the operation, monitoring, and reporting requirements for of the active landfill gas collection and control system (GCCS) under the current Title V Air Operation Permit No. 0610015 -008 -AV. The following permit compliance support services will be provided: • Annual Statement of Compliance: Geosyntec will prepare and submit the annual Statement of Compliance for the Class I Landfill. This compliance document must be submitted to the FDEP within 60 days after the end of the calendar year, as required by subparagraph 62-213.440(3)(a)(2), F.A.C. NCP2323548/1L23073_2025 Compliance Monitoring Proposal cnl;inocrs I -�civntist, I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 10 • Electronic Annual Operating Report (EAOR): Geosyntec will prepare and submit to the FDEP the EAOR for the Class I landfill for the calendar year 2025. This report be submitted on or before April I of each calendar year, as required by subsection 62- 210.370(3), F.A.C. As part of this task, Geosyntec will perform calculations to estimate the annual emission rates of non -methane organic compounds (NMOCs) and VOCs from the LFG to determine if the facility designation has changed from voluntary to mandatory with regard to operation and reporting requirements of the active GCCS under the New Source Performance Standards (HSPS) requirements. The results of the annual LFG sulfur content test will be used in the EAOR calculations. In the event of a status change, Geosyntec will advise the SWDD of its implications. • Semi -Annual Monitoring Report: Geosyntec will prepare and submit two semi-annual monitoring reports to demonstrate compliance with the federal requirements of the Title V permit. The reports will address the following permit conditions or compliance requirements: o Submittal of reports of any required monitoring at least every 6 months. All instances of deviations from permit requirements must be clearly identified in such reports. o Reporting, in accordance with requirements of subsection 62-210.700(6) and Rule 62- 4.130, F.A.C., of deviations from permit requirements, including those attributable to upset conditions defined in the permit. Reports shall include the probable cause of such deviations, and any corrective actions or preventative measures taken. o Reports shall be accompanied by a responsible official, pursuant to subsection 62- 213.420(4), F.A.C. The reports will only address deviations from the Title V permit conditions. Landfill and LFG operation and maintenance (O&M) data are not required to be reviewed and submitted to the FDEP per the Title V permit. • Annual Title V Emissions Fee: The EAOR application used for reporting to the FDEP will automatically calculate the annual emission fee for the facility. Geosyntec will notify the SWDD of the fee amount and will submit the check for payment of the fee on behalf of the SWDD prior to the April 1 deadline. • Annual LFG Sulfur Content Test: Geosyntec will collect three samples of LFG annually to determine the sulfur content in accordance with ASTM Method D5504-12 or D7493. The samples will be tested by a certified air testing laboratory. The laboratory test results will be used to calculate sulfur emissions and a report prepared for submittal to the FDEP. The LFG sulfur content testing will be completed no later than 31 NCP2323548/1L23073_2025 Compliance Monitoring Proposal enhincers I scientists i innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 11 December 2025, and the corresponding reporting will be completed no later than 45 days after testing. Phase 7 Technical and Miscellaneous Permit Compliance Support and Reporting Under this phase, Geosyntec will provide the SWDD with technical support and miscellaneous permit compliance support services related to the Class I landfill and C&D disposal facility on an as -needed basis. These services may include: • reporting required by the Multi -Sector Generic Permit for stormwater discharge; • assist the SWDD in updating the draft SWPPP that was completed and submitted to the SWDD; • quarterly monitoring and reporting of the LFG monitoring wells located at the perimeter of the site and also in enclosed structures; • miscellaneous permit and compliance support services; • assistance with preparing annual budgets for the SWDD; • preparing agenda items for and attending the SWDD Board of County Commissioners meetings upon request; • quarterly methane readings as required by the Class I landfill permit; • sampling and reporting for additional monitoring wells and surface water for the C&D debris disposal facility depending on the results of the semi-annual and quarterly sampling and analytical testing; and • other services as needed. As part of these services, Geosyntec proposes to assist the SWDD with the evaluation and resolution of issues pertaining to the cxceedances in select analytes of the C&D debris disposal facility and Class 1 landfill monitoring wells and surface sample sites should these issues arise. NCP2323548/JL23073_2025 Compliance Monitoring Proposal on};ineers I scientists I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 12 SCHEDULE Geosyntec will initiate work immediately upon receipt of Notice to Proceed (NTP) from the SWDD. The compliance reports required by each permit will be completed and submitted to the FDEP before the deadlines discussed above. Other technical and miscellaneous permit compliance support services will be provided on an as -needed basis. BUDGET ESTIMATE Geosyntec proposes to perform the above -referenced work on a lump sum basis for $326,874.54. A budget estimate for the scope of work outlined in Phases 1 through 7 of this proposal is summarized in the following table, and a detailed budget estimate is provided as Attachment 1 - The budget estimate presented in this proposal is based on Geosyntec's understanding of the project requirements, our experience gained from executing similar tasks for the SWDD during 2007 and 2008 as well as 2020 through 2024, and experience with compliance monitoring, and reporting at similar facilities. Phase 1 — General Consulting/Meeting Support/Project Management $36,463.90 Phase 2 — Semi -Annual Sampling and Reporting $57,970.06 Phase 3 — Quarterly Assessment Monitoring and Reporting $83,664.42 Phase 4 — Storage Tank Groundwater Monitoring Well Sampling and Reporting $47,642.12 Phase 5 — Preparation of July 2023 to December 2025 Technical Report $32,128.64 Phase 6 — Title V Permit Compliance and Reporting $26,218.80 Phase 7 — Technical and Miscellaneous Permit Compliance Support and Reporting $42,786.60 TOTAL $326,874.54 Geosyntec will invoice the SWDD each month of the project on a lump sum, percent complete basis in accordance with our Agreement. Additional services or any significant change in the scope of work will be performed using the Rate Schedule included in our Agreement. Geosyntec will not exceed the budget estimate without prior approval and written authorization from the SWDD. NCP2323548/JL23073_2025 Compliance Monitoring Proposal t'nginvers I scientists I innovators Mr. Himanshu H. Mehta, P.E. 20 December 2024 Page 13 CLOSURE Geosyntec appreciates this opportunity to offer our services. if this proposal is acceptable, please indicate your agreement by signing the attached work authorization, which references this proposal. Please return one signed work authorization to Ms. Graver's attention. Please call either of the undersigned with questions you may have as you review this proposal. Sincerely, r Cris ina Graver, P.E. Senior Engineer Copies — Tim Copeland, Ph.D., P.E. — Geosyntec Ron T. Jones, BCEE— SWDD Attachment 1— Detailed Budget Estimate NCP2323548/JL23073_2025 Compliance Monitoring Proposal cliginccrs I srientists I innovators Matt Wissler, Ph.D., P.G. Senior Principal ATTACHMENT 1 BUDGET ESTIMATE Table 1 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA wncAA. l mmki OA1 .-nKictu Tt Kira r-;=T!nt r, SLIPPnRT/PROJECT MANAGEMENT r•rimc)L V 1. VLI\LI�l1L vv�vv� ITEM • BASIS - - RATE QUANTITY ESTIMATED COST A. Professional Services a. Senior Principal Hr $310 6 $1,860.00 b. Principal Hr $287 0 $0.00 c. Senior Professional Hr $265 40 $10,600.00 d. Project Professional e. Professional Hr Hr $235 $207 74 0 $17,390.00 $0.00 f. Senior Staff Professional Hr $184 10 $1,840.00 g. Staff Professional Hr $160 0 Subtotal Professional Services $0.00 $31,690.00 B. Technical/Administrative Services a. Designer Hr b. Senior Drafter/Senior CADD Operator Hr $165 $150 0 0 $0.00 $0.00 c. Project Administrator Hr $90 36 $3,240.00 d. Clerical Hr $68 0 $0.00 Subtotal Technical/Administrative Services $3,240.00 C. Reimbursables a. Lodging b. Per Diem Day Day $150 $55 0 0 $0.00 $0.00 c. Communications Fee 3% Labor $0.03 $34,930 $1,047.90 d. CADD Computer System Hr $15 0 $0.00 e. Vehicle Rental & Fuel Day $150 3 S450.00 f. 8"x11" Photocopies Each $0.12 300 $36.00 g. CADD Drawings Each S3 0 $0.00 Subtotal Reimbursables $1,533.90 TOTAL ESTIMATED BUDGET: PHASE 01 $36,463.90 JL22076/2025 Compliance Monitoring Costing_ Geosyntec Consultants Table 2 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND CBD DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA PHARF m- SFMI_ANNHAI SAMPLING AND REPORTING ITEM BASIS RATE QUANTITY ESTIMATED COST A. Professional Services a. Senior Principal Hr $310 4 $1,240.00 b. Principal Hr $287 0 $0.00 C. Senior Professional Hr $265 30 $7,950.00 d. Project Professional Hr $235 36 $8,460.00 e. Professional Hr $207 16 $3,312.00 f. Senior Staff Professional Hr $184 130 $23,920.00 g. Staff Professional Hr $160 0 $0.00 Subtotal Professional Services $44,882.00 B. Technical/Administrative Services a. Designer Hr $165 0 $0.00 b. Senior Drafter/Senior CADD Operator Hr $150 20 S3,000.00 C. Project Administrator Hr $90 8 $720.00 d. Clerical Hr $68 0 $0.00 Subtotal Technical/Administrative Services S3,720.00 C. Reimbursables a Field Vehicle Day $150 10 $1,500.00 b. Miscellaneous Supplies Day $50 10 $500.00 C. Communications Fee 3% Labor $0.03 $48,602 $1,458.06 d. Lodging Day $164 10 $1,640.00 e. Groundwater Sampling Kit (per sampler) Day $300 10 $3,000.00 f. Water Level Measurement Kit ( per sampler) Day $30 10 $300.00 q. Per Diem Da $55 10 $550.00 h CADD Computer System Hr $15 20 $300.00 i. 8'x11" Photocopies Each $0.12 500 S60.00 j. CADD Drawings Each $3 20 $60.00 Subtotal Reimbursables $9,368.06 TOTAL ESTIMATED BUDGET: PHASE 02 $57,970.06 JL22076/2025 Compliance Monitoring Costing_ Geosyntec consultants Table 3 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA ouACG nz• ni tAQ•rFrat v essFCSMFNT MONITORING AND REPORTING ITEM BASIS I RATE QUANTITY ESTIMATEDCOST A. Professional Services a. Senior Principal Hr $310 4 $1,240.00 b. Principal Hr $287 0 $0.00 c. Senior Professional Hr $265 40 510,600.00 d. Project Professional Hr $235 70 S16,450.00 e. Professional Hr $207 20 $4,140.00 f. Senior Staff Professional Hr $184 210 $38,640.00 g. Staff Professional Hr $160 0 $0.00 Subtotal Professional Services $71,070.00 B. Technical/Administrative Services a. Designer [Ar $165 0 $0.00 b. Senior Drafter/Senior CADD Operator Hr $150 20 $3,000.00 C. Project Administrator Hr $90 0 $0.00 d. Clerical Hr 1 $68 8 S544.00 Subtotal Technical/Administrative Services $3,544.00 C. Reimbursables a. Field Vehicle Day $150 10 $1,500.00 b. Miscellaneous Supplies Day $50 10 $500.00 c. Communications Fee 3% Labor $0.03 $74,614 $2,238.42 d. Lodging Day $164 8 $1,312.00 e. Groundwater Sampling Kit (per sampler) Day $300 8 $2,400.00 f. Water Level Measurement Kit ( per sampler) Day $30 8 $240.00 g. Per Diem Day $55 8 $440.00 h. CADD Computer System Hr $15 20 $300.00 i. 8"x11" Photocopies Each $0.12 500 $60.00 j. CADD Drawings Each $3 20 $60.00 Subtotal Reimbursables $9,050.42 TOTAL ESTIMATED BUDGET: PHASE 03 $83,664.42 JL22076/2025 Compliance Monitoring Costing_ Geosyntec Cons i tants Table 4 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA ounet= nA• QWWAr.F TAWK M0MITnRING WELLS SAMPLING & REPORTING JL22076/2025 Compliance Monitoring Costing_ Geosyntec Consultants QUANTITY ESTIMATEDCOST ITEM BASIS RATE A. Professional Services a. Senior Principal Hr $310 6 $1,860.00 b. Principal Hr $287 0 50.00 c. Senior Professional Hr $265 50 $13,250.00 d. Project Professional Hr $235 0 $0.00 e. Professional Hr $207 50 $10,350.00 f. Senior Staff Professional Hr $184 86 $15,824.00 g. Staff Professional Hr $160 0 $0.00 Subtotal Professional Services $41,284.00 B. Technical/Administrative Services a. Designer Hr $165 0 S0.00 b. Senior Drafter/Senior CADD Operator Hr $150 12 $1,800.00 C. Project Administrator Hr $90 8 $720.00 d. Clerical Hr $68 0 $0.00 Subtotal Technical/Administrative Services $2,520.00 C. Reimbursables a. Lodging Day $150 4 $600.00 b. Per Diem Day $55 4 $220.00 C. Communications Fee 3% Labor $0.03 $43,804 $1,314.12 d. CADD Computer System Hr $15 12 $180.00 e. Vehicle Rental & Fuel Day $150 10 $1,500.00 f. 8"x11" Photocopies Each $0.12 0 $0.00 g. CADD Drawings Each $3 8 $24.00 Subtotal Reimbursables $3,838.12 TOTAL ESTIMATED BUDGET: PHASE 04 $47,642.12 JL22076/2025 Compliance Monitoring Costing_ Geosyntec Consultants Table 5 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA Duecp ns• pRr:aeRnTlnN nF TFCHNICAL REPORT ITEM BASIS RATE QUANTITY ESTIMATEDCOST A. Professional Services a. Senior Principal Hr $310 4 $1,240.00 b. Principal Hr $287 0 $0.00 c. Senior Professional Hr $265 20 $5,300.00 d. Project Professional Hr $235 30 $7,050.00 e. Professional Hr $207 40 $8,280.00 f. Senior Staff Professional Hr $184 40 $7,360.00 g. Staff Professional Hr $160 0 S0.00 Subtotal Professional Services $29,230.00 B. Technical/Administrative Services a. Senior CADD Designer Hr $195 0 50.00 b. CADD Designer Hr $165 8 $1,320.00 c. Senior Drafter/Senior CADD Operator Hr $150 0 50.00 d. Administrative Assistant Hr $90 1 0 S0.00 e. Clerical Hr $68.00 8 $544.00 Subtotal Tec $1,864.00 C. Reimbursables a. Lodging Day $150 0 $0.00 b. Per Diem Day $55.00 $0 $0.00 c. Communications Fee 3% Labor $0 30488 $914.64 d. CADD Computer System Hr $1 5 8 $120.00 e. Vehicle Rental & Fuel Day $150.00 0 $0.00 f. 8"x11" Photocopies Each I $0 1 0 $0.00 g. CADD Drawings Each 311 0 $0.00 Subtotal Reimbursables $1,034.64 TOTAL ESTIMATED BUDGET: PHASE 05 $32,128.64 Table 6 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND CBD DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA vuecF nam TIT! E V PERMIT CO MPI IANCE AND REPORTING ., �F ITEM BASIS RATE QUANTITY ESTIMATED COST A. Professional Services a. Senior Principal Hr $310 4 $1,240.00 b. Principal Hr $287 0 $0.00 c. Senior Professional Hr $265 26 $6,890.00 d. Project Professional Hr $235 0 $0.00 e. Professional Hr $207 30 S6,210.00 f. Senior Staff Professional Hr $184 40 $7,360.00 g. Staff Professional Hr $160 0 $0.00 Subtotal Professional Services $21,700.00 B. Technical/Administrative Services a. Designer Hr $165 0 $0.00 b. Senior Drafter/Senior CADD Operator Hr $150 6 $900.00 C. Project Administrator Hr $90 4 $360.00 d. Clerical Hr $68 0 $0.00 Subtotal Technical/Administrative Services $1,260.00 C. Reimbursables a. Lodging Day $150 2 $300.00 b. Per Diem Day $55 2 $110.00 c. Communications Fee 3% Labor $0.03 $22,960 $688.80 d. CADD Computer System Hr $15 6 590.00 e. Vehicle Rental & Fuel Day $150 2 $300.00 f. 8"x11" Photocopies Each $0.12 500 $60.00 g. CADD Drawings Each $3 20 $60.00 h. Subcontractor LS $1,500 1.1 $1,650.00 Subtotal Reimbursables $3,258.80 TOTAL ESTIMATED BUDGET: PHASE 06 $26,218.80 JL2207612025 Compliance Monitoring Costing_ Geosyntec Consultants Table 7 BUDGET ESTIMATE 2025 COMPLIANCE MONITORING, REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA PHASE 07: TECHNICAL MISCELLANEOUS COMPLIANCE SUPPORT SERVICES ITEM BASIS RATE QUANTITY ESTIMATEDCOST A. Professional Services a. Senior Principal Hr $310 30 S9,300.00 b. Principal Hr $287 0 $0.00 c. Senior Professional Hr $265 40 $10,600.00 d. Project Professional Hr $235 40 $9,400.00 e. Professional Hr $207 0 $0.00 f. Senior Staff Professional Hr 1 $184 50 $9,200.00 g. Staff Professional Hr 1 $160 0 $0.00 Subtotal Professional Services $38,500.00 B. Technical/Administrative Services a. Designer Hr $165 0 $0.00 b. Senior Drafter/CADD Operator Hr $150 8 $1,200.00 c. Project Administrator Hr $90 8 $720.00 d. Clerical Hr $68 0 $0.00 Subtotal Technical/Administrative Services $1,920.00 C. Reimbursables a. Lodging Day $150 2 $300.00 b. Per Diem Day $55 2 $110.00 c. Communications Fee 3% Labor $0.03 $40,420 $1,212.60 d. CADD Computer System Hr $15 8 $120.00 e. Vehicle Rental & Fuel Day $150 2 $300.00 f. 8"x11" Photocopies Each $0.12 200 $24.00 g. CADD Drawings Each $3 100 $300.00 Subtotal Reimbursables $2,366.60 TOTAL ESTIMATED BUDGET: PHASE 07 $42,786,60 JL22076/2025 Compliance Monitoring Costing_ Geosyntec Consultants