Loading...
HomeMy WebLinkAbout2025-091SECTION 00942 - Change Order Form No. 2 DATE OF ISSUANCE: 4/22/202 EFFECTIVE DATE:4/22/2025 OWNER: Indian River County CONTRACTOR Southeast Services of the Treasure Coast Inc. Project: CR512 & N. Broadway St. Drainage Restoration (Fellsmere) OWNER's Project No, IRC -2006 OWNER'S Bid No. 2024036 You are directed to make the following changes in the Contract Documents: Reason for Change Order: The project is complete. This change order is intended to make final adjustments to bid line items to finalize the contract. Attachments: Description of Itemized Changes CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $215,234.70 Net increase from previous Change Order No. 1 $211,108.00 Contract Price prior to this Change Order: $426,342.70 Net decrease of this Change Order: $(23,876.38) Contract Price with all approved Change Orders: $402,466.32 ACCEPTED: Robert K Yr..«n Dress 0..:0M..*. . — CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days) Final Completion-. 180 Net change from previous Change Order No. 1 (days) Final Completion: 44 Contract Time prior to this Change Order: (days) Final Completion: 224 Net increase (decrease) this Change Order: (days) Final Completion: 0 Contract Time with all approved _ Change Orders: (days Final Completion: 1 224 RECOMMENDED: By: IRichard Reirhentaach ENGINEER (Signature) Date: APPROVED: By: I Addie Javed OWNER (Signature) Date: IRC -2006 SES CO2 20250422 00942-1 FAPuWIc WorkMENGINEERiNG DIVISION PROJECTSi2006 CR512 Drainage Restoration (FeIIsmere)N•AdminVAgenda ttems'iPratect Closec,UWRG 2006,_SES_CO2_20250422.doc Rev. 05!01 DESCRIPTION OF ITEMIZED CHANGES PROJECT NAME: CR512 and N. Broadway St. Drainage Restoration (Fellsmere) PROJECT NO. IRC -2006 BID NO. 2024036 Item No: Descri tion€' Unit Quantity Unit Price Price Increase Price Decrease WCD-1 WCD-2 REIMBURSEMENT FOR ADDITIONAL CLEANING NECESSARY FOR 36" AND 66" PIPES RAISE MANHOLE #19 TO GRADE LS LS 1 1 88,340.00 1,850,00 88 340.00 1.850.00 104-2 PREVENTION, CONTROL 8 ABATEMENT OF EROSION AND WATER POLLUTION LS 1 500.00 500.00 C01 - 31 RAISE MANHOLE #15 TO ASPHALT GRADE 1/2 DAY LS 0.244848 2,450.00 600.00 REVISION LINE ITEMS 430-1 TO 430-4 LS 1 12,966A0 12.966.4.0 344 -FA FORCE ACCOUNT LS 1 100,000.00 100,000.00 SUBTOTALS 90,190.00 114,066.40 CR512 and N. Broadway St. Drainage Restoration (Fellsmere) TOTAL 23,876.40 FIP.,dre WV kttENGINEERING DIVISION PROJECTSV006 CR612 WWMyp�Fi�1�lpjtl.11dAlYM iYp hq gGQ/1OY 4"•,QQg6 8E$_C(� gp2g(14 1".rye.