Loading...
HomeMy WebLinkAbout2025-114IRC -1231 1 st Street SW & 27th Avenue Intersection ENGINEERING SERVICES WORK ORDER 20 This Work Order Number 20 is entered into as of this 20thday of Nlay , 2025 pursuant to that certain Continuing Contract Agreement, dated May 2, 2023, ("Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and KIMLEY-HORN & ASSOCIATES, INC. ("Consultant"). The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of*Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the mutually agreed upon lump sum or maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing, and at a rate not to exceed the prices set forth in Exhibit B of the Agreement (Rate Schedule) for RFQ 2023015, made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. ' 0 ht Mls"'•• CO T: KIMF,: LEY -HORN & ASSOCIATES, INC. BOARD OF COUNTY COMMISSONERS O--�y-� ..-• Sion;•., INDIAN RIVER COUNTY: +c°J•. <</ ✓�9�;, Name: By: Title: seph E. Flescher, Chairman40 BCC App oval Date: %Y, 20 ' •SFR Couta� ••' By.X1VdqUka+L1 d I J n A. itkanich, Jr., Cou y Administrator Approved as to Form and Legal Sufficiency: By: nifer VWShuler, County Attorney Ryan L. Butler, Clerk of Court and Comptroller Attest: Deputy Clerk (SEAL) 1st Street SW & 271h Avenue Intersection Improvements EXHIBIT A SCOPE OF WORK The COUNTY desires to reconstruct the 1" Street SW and 27" Avenue intersection to include the following: • Dedicated eastbound and westbound left -turn auxiliary lanes • Mast -arm signalization w/ pedestrian movements • Pedestrian facilities along the north side of 1St Street SW between 29th Avenue and 24th Avenue • Minimized Florida Power and Light (FPL) transmission pole impacts The County agrees to provide (in a timely manner) the following material, data, or services as required in connection with the work to be performed under this Agreement; all of which information the CONSULTANT may use and reasonably rely upon: A. Provide the CONSULTANT with a geotechnical investigation, traffic counts, preliminary data or reports available, existing location surveys, topographic survey, and related documents required to complete the construction documents. B. Provide the CONSULTANT with all available drawings, right-of-way maps, and other documents in the possession of the County pertinent to the project. C. The County shall make provisions for the CONSULTANT to enter upon public and private property as required for the CONSULTANT to perform his services. D. The County will promptly execute all permit applications and provide application and review fees necessary to expedite the acquisition of any local, state or federal permits made necessary by the project. E. The County will pay for all jurisdictional agency permit fees. The PROJECT LIMITS are projected to extend 1,200 feet east and west from 27th Avenue along 152 Street SW and 300 feet north and south along 27th Avenue from 1st Street SW for a total project length of 3,000 feet (0.57 miles). A. Roadway Analysis and Plans: Roadway set of plans shall consist of the following: 60% 90% 100% Cover Sheet C C F Summary of Pay Items P C F Typical Sections C C F Summary of Quantities & General Notes P C F Summary of Drainage Structures Sheets P C F Project Layout C C F 1st Street SW & 27th Avenue Intersection Improvements Plan and Profile Sheets (40 scale) C C F Intersection Plan & Details P C F Special Details P C F Drainage Structure Sheets P C F Roadway Soil Survey P C F Cross Sections at 100 ft intervals P C F Stormwater Pollution Prevention Plans P C F Signage & Pavement Marking Plans (40 scale double plan) C C F Signalization Plans P C F Construction Cost Estimate and Quantities C C F Notes: P — Preliminary, C — Complete, but subject to change, F - Final The plans will be prepared based upon English units. Design will be conducted in MicroStation and Geopak. The following additional data shall be utilized for development of the plans: 1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x 17" sheets. 2. Plan sheets shall depict existing right-of-way, section lines, property lines, temporary construction easements, and centerline of construction. Horizontal control points with state plane coordinates for all PC's, PT's, curve radius, curve length and horizontal PI's shall be included on the Plan or summarized in an alignment table. 3. Plans shall include spot grades adequate to describe any proposed grading. 4. Match lines shall not be located within the limits of an intersection. 5. If applicable, soil boring information shall be plotted on cross sections with soil classification and high season water table. 6. All quantities shall reference FDOT Pay Item Numbers. 7. All details shall reference FDOT Index Numbers. 8. All specifications shall reference to County and/ or FDOT Specifications for Road and Bridge Construction. Any deviations are special specifications not included in FDOT Specifications are required in the Technical Specifications. 9. Initial, interim and Final Plan Submittal shall include the following: i. Three (3) Sets of Signed and Sealed Plans. ii. One (1) Opinion of Probable Construction Cost iii. One (1) CD with drawings in PDF format. iv. The CONSULTANT will provide construction documents and calculations in sufficient quantity as required by the various reviewing agencies. 1st Street SW & 27th Avenue Intersection Improvements B. Drainage Analysis and Plans: Perform drainage investigations and analysis necessary to prepare a design which will drain the project in accordance with the County, St Johns River Water Management District (SJRWMD) and Indian River Farms Water Control District (IRFWCD) design criteria. The work will include the analyses for the following: a. Determine Base Clearance Water Elevation Analyze, determine, and document high water elevations which will be used to set roadway profile grades. Determine surface water elevations at cross drains, floodplains, outfalls and adjacent storm water ponds. Determine groundwater elevations at intervals between the above-mentioned surface waters. b. Design of Storm Drains Develop a "working drainage map', determine runoff, inlet locations, and spread. Calculate hydraulic losses (friction, utility conflict and, if necessary, minor losses). Determine Design tailwater and, if necessary, outlet scour protection. c. Drainage Design Documentation Report Compile drainage design documentation into report format. Include documentation for all the drainage design tasks and associated meetings and decisions. A Stormwater Pollution Prevention Plan (SWPPP) will be developed in conjunction with this project. The site specific SWPPP is a requirement of both the EPA National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Construction Activities, and the FDEP Generic Permit for Stormwater Discharges from Construction Activities. C. Jurisdictional Permitting: The Consultant shall prepare a permit application to IRFWCD and a permit exemption verification request to SJRWMD for submittal on behalf of the County. This will consist of all required evaluation, design, coordination, and follow-up work necessary to support permit applications. The County will review the permit applications as necessary. The Consultant shall assemble and be responsible for the final submittal. The Consultant shall prepare permit sketches for submission by the County to SJRWMD for dredge and fill activities, if necessary. The Consultant shall submit all permit sketches on 8.5" x 11" sheets. Sketches shall be neatly scaled, signed and sealed, and reproducible. The Consultant will coordinate on the behalf of the County with each agency identified in this task. This may include up to one (1) meeting with the agencies to discuss requests for additional information (RAI), and written responses to one (1) request for additional information (RAI) including plan modifications. This scope assumes that mitigation measures will not be necessary or required. This scope assumes that coordination with US Fish and Wildlife Service through the preparation of Biological Assessments or Biological Opinions will not be required. Permit application submittals will be made following the 90% plan set submittal approval by the County. 1st Street SW & 27th Avenue Intersection Improvements D. Signing and Pavement Marking Plans: Signing and Pavement Marking plans shall include: Preparation of the plan layout, quantities (including signing and pavement marking quantity) and tabulation of quantities. All plans are to be prepared in accordance with the latest design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, and shall be accurate, legible, complete in design and drawn at the same scale as the Roadway Plans, furnished in reproducible form. Plans will be included with the roadway plans and submitted as indicated above. E. Utility Coordination: The CONSULTANT will coordinate with franchise utility operators in the vicinity of the project such that the proposed construction activities can be developed to minimize impacts to existing utilities located within the project limits. Any utility permitting and relocation design required to accommodate the proposed improvements will be addressed as an additional service relative to this scope of work. F. Signalization Plans: Mast -arm traffic signal configurations at the Vt Street SW and 27th Avenue intersection will be designed to meet current County and FDOT standards. Luminaires will be provided on each mast arm pole. The pole analysis and design of the signal systems will be completed and submitted to County for review. Signalization plans will be included with the roadway plans and submitted as indicated above. (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) 1st Street SW & 27th Avenue Intersection Improvements FEE SCHEDULE The COUNTY agrees to pay and the Consultant agrees to accept for services rendered pursuant to this Agreement fees inclusive of expenses in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the Consultant and the COUNTY is as follows: Lump Sum Components Task Labor Fee Roadway Analysis and Plans $ 117,540 Drainage Analysis and Plans $ 25,870 Erosion Control and SWPPP $ 8,750 Jurisdictional Permitting $ 26,770 Signing and Marking Plans $ 13,000 Utility Coordination $ 10,590 Signalization Plans $ 37,380 Project Total $ 239,900 (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) 1st Street SW & 271h Avenue Intersection Improvements TIME SCHEDULE Upon authorization to proceed by the COUNTY, final design documents are expected to take approximately eight (8) months from the Notice to Proceed (NTP). NTP Upon BOCC Approval Phase II Submittal (60% Design Plans) 4 months following NTP Phase III Submittal (90% Design Plans) 6 months following NTP Phase IV Submittal (Final Design Plans) 8 months following NTP (THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) Summary Project Name 1st Street SW and 27th Avenue Task Summary Manhours for project Task Principal Senior Professional Registered Professional Professional 1 Designer Support Remarks Staff $300 $270 $210 $130 $165 $75 Design Analysis 2 54 56 0 24 12 Roadway Plans 12 31 85 90 268 0 Drainage Plans 10 11 49 60 64 0 Permitting 4 36 44 10 24 18 Utility Coordination 4 10 8 24 6 12 Signing and Marking Plans 41 91 161 361 0 Si nalization Plans 1 81 39 601 151 601 0 Total Hours = Labor Fee = 44 $13,200 188 $50,760 311 $65,310 215 $27,950 482 $79,530 42 $3,150 Roadway Fee = Design Topo Fee = Geotechnical Fee = Total Fee = $239,900 By County By County $239,900 1st Street & 27th Avenue Workplan.xls Page 1 Design Analysis Activity: Design Analysis Task Principal Senior Professional Registered Professional Professional 1 Designer Support Staff Remarks Contract File 2 2 Project Coordination Geotech Sub -consultant Provided by IRCO Surveyor Provided by IRCO County Eng Det 40 20 8 Four review submittals/ meetings Cost Estimating 4 20 20 Cost est. conducted at 60%, 90% and Finals Project Specifications and Quantities 4 12 2 QC/QA 4 Project Management 4 Subtotal 4 54 52 0 20 12 Page 2 Rdwy Plans Activity: Roadway Plans Task Principal Senior Professional Registered Professional Professional 1 Designer Support Staff Remarks Cover Sheet 2 4 Typical Section and Notes 2 2 4 Summary of Quantities Sheet 8 16 16 2 sheets Plan/Profile Sheets 1st Street SW 9 27 36 10B 6 sheets at 30 hrs/sht 27th Avenue 3 9 12 36 2 sheets at 30 hrs/ sht Horiz/Vert Control Sheet 4 8 12 Cross Sections 1st Street SW 5 14 18 54 100 ft Sections plus driveways 30 3.0 hrs per 27th Avenue 2 5 6 18 100 ft Sections plus driveways 10 3.0 hrs per Miscellaneous Const. Details 4 10 16 1 Sheet of details @ 30hrs/sht QC/QA 12 Project Management 4 Subtotal 12 31 85 90 268 0 Page 3 Drainage Plans Activity: Drainage Plans Task Principal Senior Professional Registered Professional Professional 1 Designer Support Staff Remarks Drainage Analysis 1st Street SW 2 20 30 8 Includes cross drain design 27th Avenue 8 10 4 Field Review 2 8 8 site visits Stormwater Management Facitit & Drainage Maps 1st Street SW 27th Avenue Summaty of Drainage Structures 4 16 1 sheets at 20 hrs per sheet Drainage Structure Sheets 1st Street SW 27th Avenue Stormwater Pollution Prev. Plans 1st Street SW 1 3 4 12 2 sheets at 10 hrs/sht 27th Avenue 2 6 8 24 4 sheets at 10 hrs/sht QC/QA 10 Project Management 4 Subtotal 10 11 49 60 64 0 Page 4 Activity: Permiting Task Principal Senior Professional Registered Professional Professional 1 Designer Support Remarks Staff Pre -application Meetings SJRWMD 6 6 2 IRFWCD 6 6 2 Preliminary Exhibits for Permit 2 4 2 8 Permit Package SJRWMD 4 4 ERP Exemption Request IRFWCD 2 8 4 4 Request for Information SJRWMD 4 4 2 IRFWCD 8 16 4 16 4 QC/QA Project Management 4 4 Subtotal 4 36 44 10 24 18 Permits Required SJRWMD ERP ACOE - nationwide Utilities Activity: Utility Plans Task Principal Senior Professional Registered Professional Professional Designer 1 Support Remarks Staff Ex. Utility Reveiw 8 24 8 Coordination w/ Util Co.'s - Request as -built data Electrical Service Provider Coordination Mtq 6 6 4 QC/QA 4 Project Management 4 Subtotal 4 10 8 24 6 12 Page 6 Sign & Mark Activity: Signing and Marking Plans Task Principal Senior Professional Registered Professional Professional 1 Designer Support Remarks Staff Field Inventory 4 Plan Sheets double plan 1st Street SW 2 6 8 24 4 sheets at 10 hrs/sht 27th Avenue 1 3 4 12 2 sheets at 10 hrs/ sht QC/QA 4 Project Management 4 Subtotal 4 7 9 16 36 0 Page 7 Signalization Activity: Signalization Task Principal Senior Professional Registered Professional Professional Designer Support Remarks 1 Staff 1st Street SW & 27th Avwnue Mast -Arm Signalization Design 20 60 60 Foundation Structural Design 15 15 QC/QA 8 Project Management 4 Subtotal 8 39 60 15 60 0 Page 8