HomeMy WebLinkAbout2025-136FIRST EXTENSION TO AGREEMENT
FOR ANNUAL MAINTENANCE AT SPOONBILL MARSH
This First Extension to that certain Agreement to provide Annual Maintenance at Spoonbill Marsh is entered
into effective as of September 13, 2025, by and between Indian River County, a political subdivision of the
State of Florida ("County") and Southern Management, LLC ("Contractor").
BACKGROUND RECITALS
WHEREAS, the County and the Contractor entered into an Agreement for Annual Maintenance at
Spoonbill Marsh effective September 13, 2022; and
WHEREAS, Article 3 of the Agreement contains the term and renewal provisions; and
WHEREAS, the first term commenced effective as of September 13, 2022 and shall end on September 12,
2025; and
WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement for an additional one-
year period;
NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration,
the receipt and sufficiency of which are hereby acknowledged, the County and the Contractor agree as
follows:
1. , The background recitals are true and correct and form a material part of this First Extension.
2. The first renewal term shall commence effective September 13, 2025, and shall end on September
12, 2026. There is a single, one-year extension available on the contract.
4. All other terms and provisions of the Agreement shall be unchanged and remain in full force and
effect.
IN WITNESS WHEREOF, the parties have caused this First Extension to be executed effective the day and
year first set forth above.
Southern Management, LLC INDIAN RIVER COUNTY, FLORIDA.
BOARD OF COUNTY COMMISSIONERS„ .°°°..••
oon�M�ss�o�
By: By:
Printed name: Ae-f-h VSe-G'Joseph E. Flescher, Chai#lxnan
Title:
,�yR/,� art,{� �.�p�,•=
(Corporate Seal)
Date: Attest: Ryan L. Butler, Clerk of Circuit Court
and Comptroller
By:
Depu Clerk
Appr
J A. Titkanich, Jr.
County Administrator
Approved asp form and legal sufficiency:
�-J2�
uler CA V- 5 -” (cam
As5iCo Attorney
0
2022072RFtJ for Spoon;ri;l F02rsh Maintenance-Addendurn 1
PROPOSAL PRICING — RFP 2022071— Annual Maintenance at Spoonbill Marsh Constructed
Wetland Treatment System — Addendum 1
Proposer submits the following prices for the work described in this solicitation (calculate total cost by multiplying unit cost and
.d
rn iantitv)-
Page 20 of 29
ITEM
DESCRIPTION
FREQUENCY
SCHEDULE
UNIT COST
UNIT
Qty
TOTAL COST
NO.
1
SITE MOWING -BRUSH
(.6) TOTAL
z
a
LL
a
z
?
? .
Q '
., W
"'
U
o
o
a
$ Q Q.5 a®
6
$ 90
'
HOG
PER YEAR
z
2
LAWN MOWING
18 TOTAL
()
z
a
m
LL
�
a
�:
z
(D
a
a
o
>
z
u
o
$1z3. �®
EA
18
es®
$z,�Z5 "
PER YEAR
3
INVASIVE SPECIES
(4) TOTAL
z
m
a,
a
z
=
�
w
o
WLID
$ 5i �. ®®
4
$ 2;D 6�
CONTROL
PER YEAR
Q
¢
, :
a
o.
z
o
4
SUMP, TRASH SCREEN
QUARTERLY
z
F—
o
>
z.
$ SO.
QTR
4
o0
$"�®6�O
& WETWELL
PER YEAR
a
LL
¢
a
N
0
87, 450
�
CLEANING
5
MANATEE
PDIREOUNTY
CONTRACTOR SHLL ALL B WITH IN 24
$ 4�' .�®
HR
2
CLEANINGEEN
CTIVE
ROM TOHEICOUNTY
HOURS NOTIFICATION F
BOARDWALK
6
MAINTENANCE
QUARTERLY
z
Q
m
LL
a
a
Q
a
z
a
°;
o
>
z
u
o$
Oo
076QTR
#
4
oO
$� ®�
COUNTY TO
PER YEAR
PURCHASE MATERIAL
BOARDWALK
7
REPLACEMENT
ONCE PER
z
a
REPLACE'100 TOTAL FEET OF BOARDWALK.
00
$ ®-'
EA
1
$11570 C)
COUNTYTO
YEAR
DEBRIS REMOVED FROM SITE.
7.50
PURCHASE MATERIAL
MANGROVE
TRIMMIN8
ONCE
EACH
TRIM ENTIRE LENGTH21
$l
EA
1
BOARDWALK 3GCLEAR
YEAR
OCTOBER
X55
ZONE EACH SIDE
Page 20 of 29
C
7n77C177 RPP fnr Snnnnhill Mi ;)r -,h M;flnpnarrP-ArlrlPrrli,rn r
ITEM
DESCRIPTION
FREQUENCY
SCHEDULE
UNITZOST
UNIT
Qty
TOTAL COST
NO.
9
RUNNELCLEANING
AND DEBRIS
ONCE PER
} W
CLEAN: AND REMOVE DEBRIS FROM SITE.
o�
$ L+g®
q�g
EA
1
$
YEAR
TOTAL OF 5560 LINEAR FEET.
q�''50
REMOVAL
10
MOSQUITO DITCH
ONCE. PER
m a
�
PER FOOT PRICE. ANTICIPATE CLEANING 500
$
FT
-1
$00
(qy`�3��
CLEANING
YEAR
LINEAR FEET.
��•7�
500
11
'NORTH AND SOUTH
BREECH DEBRIS
QUARTERLY
z
¢
m
LL
¢
�
a
�-
¢
¢
�
>
�
>
�
cD
>
¢
a
W
�
0
o
>
z
z
U' '
W
a
®°
$� �TJr--
QTR
4
$rr L}'Ob taa
PER YEAR
REMOVAL
ROAD REPAIR
12
CONTRACTOR TO
PER COUNTY
DIRECTIVE
PER HOUR PRICE
$ ` 7�.5®
HR
3
$ ®b
5i552 mo
PURCHASE MATERIAL
13
MISCELLANEOUS
PER COUNTY
PER HOUR PRICE
$ ��. �O
HR
(0®
TASK
DIRECTIVE
327$qzjlz0—
14
STORM EVENT
PER COUNTY
LUMP SUM INITIAL SITE
oo
$
�
1
V
--
$ �� 500
RESPONSE
DIRECTIVE
EA
TOTAL PROPOSED
fib.
$ 280157
ANNUAL COST
UNIT REFERS TO THE NUMBER OF REPETITIONS PER YEAR *6a-3cd OP 6650 4RS ¢bv.-y
ITEM 3 INVASIVE SPECIES, PER HOUR PRICING, ESTIMATED AT 4 HOURS PER QUARTER, 16 HOURS PER YEAR MI.5C,• 6 45K
ITEM 5 MANATEE SCREEN CLEANING; PER HOUR PRICING, ESTIMATED AT 32 HOURS PER YEAR
ITEM 6 BOARDWALK MAINTENANCE, PER HOUR PRICING, ESTIMATED AT 8 HOURS PER QUARTER, 32 HOURS PER YEAR
ITEM 12, PER HOUR PRICING, 32 HOURS PER YEAR
ITEM 13 MISCELLANEOUS TASK, PER HOUR' PRICING, ESTIMATED AT 8 HOURS PER QUARTER, 32 HOURS PER YEAR
t1w,
SERVICE MONTHS ARE HIGHLIGHTED IN BLUE
- - Li rn>e t4-rm 1.3 eM isc. was 0 W e. p r0j cAc;t`
fiat- re, are 5igni �;�avtit'1� iYto�'�
Fsc�llah�®us 'asks o+ Olc-cl +D
b,f�, Perfi-,p>r. ed and O yr e5+-imoi.+-cd
n v ram 19<-r" aic h o vr-s ti �� o .�-err +-o
Page 21 of 29
-r�-c c+, j -v u,l ii �m e re -q u, r e-cl
-�a (lumber- ®-F ho urs e-Sh l( eed @ 52 APs
2022072 RFP for Spoonbill Marsh Maintenance=Addendum 1
The following.prices will be utilized for emergency response activities:
ITEM
TITLE
DESCRIPTION
UNIT COST
UNIT
NO.
STORM EVENT INITIAL
LUMP SUM COST FOR SITE VISIT, DOCUMENTATION OF DAMAGE (PHOTOS) AND
00
—
$
Ls
14
RESPONSE
PREPARATION OF REPORT
1—S00
s
TREE REMOVAL FROM
14a
BOARDWALK AND ACCESS
TRIM TREE TO CLEAR BOARDWALK/ROADWAY AND REMOVE DEBRIS
s37.60
EA
ROADS
14b.1
BOARDWALK REPAIR (12-
REPAIR AND REPLACEMENT OF RAILS, PICKETS, SEATING AND DECKING, WITH
$17.(20
LF
FOOT -WIDE SECTIONS)
MATERIALS SUPPLIED BY COUNTY
146.2
BOARDWALK REPAIR (6-
REPAIR AND REPLACEMENT OF RAILS, PICKETS AND DECKING, WITH MATERIALS
$8
LF
FOOT -WIDE SECTIONS)
SUPPLIED BY COUNTY
-SO
146.3
BOARDWALK REPAIR
REPAIR AND REPLACEMENT OF RAILS, PICKETS AND DECKING,'WITH MATERIALS
$ ®
LF
(3 -FOOT -WIDE SECTIONS)
SUPPLIED BY COUNTY
14c
BOARDWALK DEBRIS
PICKUP AND REMOVAL OF VEGETATIVEDEBRIS FROM THE BOARDWALK (PER
$ 3•
LF
REMOVAL
LINEAR FOOT LENGTH OF BOARDWALK)
14d
ROADWAY REBUILD/REPAIR
FURNISH AND INSTALL ROAD/SHELL BASE MATERIAL
$ ��. $�
TN
14e
ROADWAY
USE EQUIPMENT TO REGRADE WASHED ROADWAY
$SF
�• ��
GRADING/EXCAVATING
14f
DITCH.AND RUNNEL BANK
HAND REMOVAL AND DISPOSAL OF DEBRIS TO RESTORE FLOW (PER, LINERAR
$ �' �'
LF
DEBRIS REMOVAL
FOOT LENGTH OF DITCH/RUNNEL)
INSTALL TEMPORARY COFFER DAM WEST OF MANATEE FENCE, DRAW DOWN
00
14g
CLEAN BASIN OF DEBRIS
WATER, AND REMOVE AND DISPOSE OF ALL SAND, SILT AND VEGETATIVE DEBRIS.
$32)900—
Ls
INSIDE BASIN AND PUMP STATION AREA
14h
BANK-RESHAPING/SLOPING
USE EQUIPMENT TO CORRECT SHAPE/SLOPE OF DITCHES
$
LF
(Units: LS — Lump Sum; EA — Each; SF — Square Foot; LF — Linear Foot; TN — Ton; CY — Cubic Yard)
Page 22 of 29