HomeMy WebLinkAbout2025-147SECTION 00942 - Change Order Form DATE OF ISSUANCE: 06/19/2025 No. 04 EFFECTIVE DATE:07/15/2025 OWNER: Indian River County CONTRACTOR Halley Engineering Contractors, Inc. Project: 66th Avenue Roadway Widening (49th Street to 69th Street) OWNER's Project No. IRC -1505 FM NO: 436379-1-54-01 8,436379-1-54-02 OWNER'S Bid No. 2021018 You are directed to make the following changes in the Contract Documents: Reason for Change Order: The project is complete. This change order is intended to make final adjustments to bid line items and time to finalize the contract. Attachments: Description of Itemized Changes CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $32,728.137.85 Net Increase from previous Change Orders No. 01 to 03: $1.601,094.49 Contract Price prior to this Change Order: $34,329,232.34 Net decrease of this Change Order: ($1,322,311.29) Contract Price with all approved Change Orders: $33,006,921.05 ACCEPTED: pgilelN N�etl by RI[Itle L Rickie L �„�„ Shepherd By: CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: 720 Final Completion: 750 Net change from previous Change Orders No. 01 to 03: (days) Substantial Completion: 60 Final Completion: 60 Contract Time prior to this Change Order: (days or dates) Substantial Completion: 780 Final Completion: 810 Net increase (decrease) this Change Order: (days or dates) Substantial Completion: 657 Final Completion: 657 Contract Time with all approved Change Orders: (days or dates) Substantial Completion: 1.437 Final Completion: 1.467 RECOMMENDED: (I 4:. By: Kelly CowgK E ENGINEER (Signature) Date: APPROVED: Addie Javed. By: OWNER (Signature) Date: 00942 - Change Order Form REV 04-07 00942-1 F:Tublic WorksNENGINEERING DIVISION PROJECTS11505-66th Ave Widening 49th St to 69th St\1-AdminlAgenda ItemsTrojecl Closeout100942 - Change Order Form REV 04-07.doc Rev. 05/01 CHANGE ORDER NO.4 DESCRIPTION OF ITEMIZED CHANGES 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 IteidNo Desc�i tion•a Unit Qi antl Unit Price Price.lncrease. , Pnce Decrease 007 -1A Road 01201 -REGULAR EXCAVATION CY 529 3.50 1.851.50 017 - 1A Road 0337 7 82 -ASPHALTIC CONCRETE FRICTION COURSE, TRAFFIC C FC -9.5 PG 76-22 WCDO04 TN 499.30 125.00 62 412.50 018 - 1A Road 0339 1 -MISCELLANEOUS ASPHALT PAVEMENT TN 4.20 250.00 1,050.00 066 - 1A Road IRC 5 - RELOCATE EXISTING FENCE LF 2 13.00 26.00 069 - 1A Road 0700 20 11 - SINGLE POST SIGN F&I LESS THAN 12 SF AS 3 350.00 1.050.00 071 - 1A Road 0700 150 - SINGLE POST SIGN RELOCATE AS 1 1,400.00 1,400.00 075 -1A Road 0711 11111 -THERMOPLASTIC STANDARD WHITE SOLID 6" NM 0.02 5,300.00 106.00 082 - 1A Road 0711 14170 - THERMOPLASTIC STANDARD WHITE ARROW EA 4 115.00 460.00 098 -1A Road ICOIL 0630 2 11A - 2 - 2" PVC SIGNAL CONDUIT W/ 96 -FIBER CABLE (50' IN BOXES) OPEN TRENCH LF 1 8.00 8.00 099 - 1A Road 0630 2 12A - 2 - 2" PVC SIGNAL CONDUIT W/ 96 -FIBER CABLE (50' COIL IN BOXES) DIRECTIONAL DRILL LF 613 19.00 11 647.00 173 - 1 B Road 120-1 -REGULAR EXCAVATION CY 32 3.50 112.00 180 - 1 B Road 327-70-01 -MILLING EXISTING ASPHALT PAVEMENT (1" AVG. DEPTH) SY 794 15.00 11 910.00 182 - 1 B Road(TRAFFIC 337-7-82 -ASPHALTIC CONCRETE FRICTION COURSE (FC -9.5) C 1" TN 847 125.00 105912.50 183 -1 B Road 339-1 -MISCELLANEOUS ASPHALT PAVEMENT TN 2.6 250.00 650.00 185 - 1 B Road 400-2-2 - CLASS II CONCRETE ENDWALL CY 1 2.2 1,735.00 3,817.00 208 -1 B Road 430-175-115 - PIPE CULVERT RCP ROUND 15" SS LF 11 59.00 649.00 209 - 1 B Road 430-175-118 - PIPE CULVERT RCP ROUND 18" SS LF 93 76.00 7,068.00 227 -1 B Road 430-982-123 - MITERED END SECTION CONC. 15" CD EA 2 1,417.00 2,834.00 254 - 1 B Road 633-1-123 - FIBER OPTIC CABLE (F & 1) (UNDERGROUND) (49-96 FIBERS) LF 391 3.00 1,173.00 263 -1 B S&M 706-3 - RETRO -REFLECTIVE PAVEMENT MARKERS EA 1 4.50 4.50 273 - 1 B S&M 711-11-221 - THERMOPLASTIC STD YELLOW SOLID 6" LF 7 1.00 7.00 276 - 1 B Si 630-2-11 - CONDUIT SIGNAL F & I OPEN TRENCH LF 425 16.00 6,800.00 CO -3 635-2-11 PULL & SPLICE BOX F & I SIGNAL EA 1 1,680.00 1,680.00 WCDO06 MOB & DEMOB CLEARING & GRUBBING LS 1 12 600.00 12 600.00 WCDO07 MANHOLE INCREASE LS 1 2,665.16 2,665.16 WCDO08 MANHOLE INCREASE LS 1 5,560.54 5,560.54 WCDO09 66" RCP EXTRA- FDOT NON LS 1 18 084.80 18 084.80 WCDO10 RESET TOP OF INLET S-305 LS 1 3,960.42 3,960.42 WCD011 RESET INLET S -1011A LS 1 1,797.21 11797.21 WCD012 021- 1A ROAD 0425 1 351 INLETS CURB TYPE P-5 <10' FDOT NON -PART I EA 1 4 1 5,187.00 1 20 748.00 WCDO12 026- 1A ROAD 10425 2 41 MANHOLES P-7 <10' FDOT NON PART EA 1 4,760.00 4,760.00 F9Publio WorkslENGINEERING DIVISION PROJECTSt1505-66th Ave Widening_49th St to 69th StN-AdminWgenda Ite=\Project Closeout\WORKING FOLDERIIRC-1565_DESC OF CHGS COI 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 Item'No: Descn' tion_, Unit Quanta :e:_ UnitPeice Price`Incr`ease . , Pnce•Decrease _ WCDO12 033- 1A ROAD 0430 175 118 PIPE CULVERT, RCP, ROUND, 18" S/CD FDOT NON - PARTICIPATING LF 253 86.00 21 758.00 WCDO12 035- 0430 175 124 PIPE CULVERT, RCP, ROUND, 24" S/CD FDOT NON - 1A ROAD PARTICIPATING LF 59 102.00 6,018.00 WCDO12 NEW ITEM NO 1 0425 146 5 INLETS CURB TYPE J-6 PARTIAL FDOT NON -PART EA 1 4,875.00 4,875.00 WCDO12 NEW ITEM NO 2 0425 1551 18 INLET TYPE E <10' FDOT NON -PARTICIPATING EA 5 5,324.28 26 621.40 WCD013 REPLACE HEADWALL W/TYPE C DBI - NON PART LS 1 6,372.06 6,372.06 WCDO14 195- 1 B ROAD 425-1-521 INLETS DT BOT TYPE C <10' FDOT NON -PART EA 5 3,200.00 16 000.00 WCDO14197- 1 B ROAD 425-531 INLETS DT BOT TYPE C MOD <10' FDOT NON PART EA 2 3,250.00 6,500.00 WCDO14 198- 1 B ROAD 425-1-541 INLETS DT BOT TYPED <10' FDOT NON -PART EA 4 3.950.00 15 800.00 WCDO14 205- 1 B ROAD 425-2-61 MANHOLES (P -8)(<l 0FDOT NON -PART EA 2 4,600.00 9,200.00 WCDO14 207- 1 B ROAD 425-2-72 MANHOLES J-7 >10' FDOT NON -PART LF 1 13 500.00 13 500.00 WCDO14 208- 1 B ROAD 430-175-115 PIPE CULVERT RCP ROUND 15"SS FDOT NON EA 65 59.00 3,835.00 WCDO14 227- 1 B ROAD 430-982-123 MITERED END SECTION CONC) (15"CD) FDOT NON EA 1 1.417.00 1,417.00 WCDO15 PRICE ADJ BITUMINOUS MAT'L FDOT PARTICIPATING LS 1 20 839.92 20 839.92 WCDO16 173- 1 B ROAD 120-1 REGULAR EXCAVATION - FDOT NON -PART Cy 890 3.50 3,115.00 WCDO16 NEW PAY ITEM LUMP SUM LABOR & EQUIP INSTALL TOE OF EACH PANEL ADDT LS 1 42 971.44 42 971.44 WCDO16 314 - 1B 61ST B 400-2-5 CONCRETE CALSS II SUBSTRUCTURE LB 1 1,260.00 1,26 .00 WCDO16 319 - 1 B 61ST B 415-1-5 REINFORCING STEEL - BRIDGE SUBSTRUCTURE LS 8.064 2.00 16 128.00 WCDO16 330- 16 65TH B 400-2-5A CONCRETE CLASS II SUBSTRUCTURE Cy 1 1,260.00 1.260.00 WCDO16 335- 1B 65TH B 415-1-5A REINFORCING STEEL - BRIDGE SUBSTRUCTURE LB 8.064 1.50 12 096.00 WCDO17 RESET DRAINAGE STR SS-311A-FDOT NON PART LS 1 3,745.34 3,745.34 WCDO18 ADJ FOR BITUMINOUS MAT'L 7/1/2022 -12/31/2022 FDOT PART LS 1 54 868.71 54 868.71 WCDO19 700-2-12 MULTI -POST SIGN (F&I) (12-20SF FDOT NON -PART EA 2 4,400.00 8,800.00 FURNISH & INSTALL TWO LARGER PULL BOXES (17"X30") AT WCD020 57TH & 69TH - FDOT NON -PARTICIPATING LS 1 2,070.00 2,070.00 WCD023 054- 0522-2 SIDEWALK CONCRETE 6" THICK FDOT NON 1A ROAD PARTICPATING SY 1 2,390 38.25 91 428.21 WCD023 235- 1 B ROAD 0522-2 SIDEWALK CONCRETE, 6" THICK FDOT NON PARTICIPATING SYS 2 096 1 38.25 80 168.94 WCD024 0536-73 GUARDRAIL REMOVEL - FDOT NON PARTICIPATING EA 1.176 5.00 5.880.00 WCD025 ADJ FOR BITUMINOUS MAT'L 1/1/2023 - 3/31/2023 FDOT PART LS 1 10 951.86 10 951.86 ABANDON EXISTING WELL AT STA 392+24,16' RT (65TH ST WCD027 INTERSECTION) FDOT NON -PARTICIPATING LS 1 7568.46 7.568.45 PERFORM THERMAL INTEGRITY PROFILING (TIP) TESTING OF DRILLED SHAFT #4 AT THE SW CORNER OF 57TH ST & 66TH WCD028 AVE LS 1 2083.73 2.083.73 INCORPORATE PLAN REVISION #19 BRIDGE WHICH DECREASED THE WIDTH OF THE CORNER ABUTMENT PANELS WCD029 61ST & 65TH STREET BRIDGES LS 1 1 11 598.37 11 598.37 REIMBURSEMENT OF IDLE EQUIPMENT AT 61ST ST BRIDGE WCD030 WHILE RECASTING 4 NEW CORNER PANELS LS 1 49 699.20 49 699.20 RELOCATE PREVIOUSLY PLACED DRAINAGE STRUCTURE SS- WCD031 329 AND 32 LF 18" RCP AT ST 206+80 LS 1 3,686.93 3,686.93 REGRADE ALONG 66TH AVE BETWEEN STA 329+00 AND 338+00 WCD032 TO ADD A SWALE DITCH AND INSTALL ADDED DBI LS 1 27 928.96 27 928.96 RE -GRADE TO REVISED EP ELEVATION IN PLAN REVISION i , WCD033 SHEFT k Qm3j7PPImr nivininNPPn.IFCT.%%Ign."6th Ave Widenin­Lt rv_LmwGWG92, up - 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 .ItdrTi,Nb' D, !ufiii,, Quanta ic, 6edwa�61, WCD034 HURRICANE PREPAREDNESS FOR TROPICAL STORM NICOLE LS 1 2,590.13 2,590.13 WCD035 ADJ FOR BITUMINOUS MATT 4/110223 TO 6/30/2023 FDOT PART LS 1 10,792.62 10,792.62 WCD036 EXTEND THE LIMITS OF THE DITCH LINING AT THE NR CANAL BRIDGE FROM 25' OUTSIDE THE BRIDGE EASTWARD LS 1 55 767.85 55,767.85 WCD038 ADJ FOR BITUMINOUS MATT 7/1/2023- 9/30/2023 LS 1 25,488.57 25,488.57 WCD039 DELIVERY OF DRAINAGE STRUCTURES S-857 & EX -1 TO COUNTY MAINTENANCE YARD LS1 1 6,846.44 6,846.44 6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B STABILIZATOIN WCD040 FOR 300 LF 53RD ST WEST LS 1 5,046.28 5,046.28 WCD041 CONSTRUCT CURVED BARRIER WALL TO THE SW QUADRANT OF 53RD ST BRIDGE PER PLAN REV #7 Ls 1 90,816.88 90,816.88 WCD042 ICONSTRUCT UTILITY PIPE CRADLES AS SHOWN IN EXHIBIT LS 1 74,56 20,794.56 0 20,794.56 WCD043 CONSTRUCT CURVED BARRIER WALL TO SW QUADRANT OF 57TH ST BRIDGE PER PLAN REV 415 LS 1 5 167 . 3 1 105167.31 0 F2 105,167.31 WCD044 CONSTRUCT CURVED BARRIER WALL TO NW & SW QUADRANTS OF BRIDGE AT 61 ST & 65TH STREETS LS 1 322,502.83 322,502.83 WCD045 067 - 1A Road 0570 1 1 - PERFORMANCE TURF, SOD 1 - BAHIA SHY �0 14680 3.00 44.040.00 WCD045 251 -1 B Road 570-1-2A- PERFORMANCE TURF (SOD) (BAHIA) SY 16.315 3.00 49,065.00 WCD046 ADJ FOR BITUMINOUS MATT 6/1 - 6/30 THAT WAS LEFT OFF WCD035 LS 1 1,774.40 1,774.40 WCD047 PERFORM THERMAL INTEGRITY PROFILING (TIP) TESTING OF DRILLED SHAFT B AT 53RD ST INTERSECTION LS 1 2,607.41 2,607.41 PLACE 6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B WCD048 STABILIZATION FROM STA 185+00 TO 195+00 AND STA0195+00 ITO 200+00 ON 69TH ST WEST (ABOUT 6.667LS 1 22,195.81 22,195.81 PLACE 6" GRANULAR SUBBASE IN LIEU OF PE B WCD049 STABILIZATION FROM STA 208+66 TO 211+66 (AVG WIDTH 32') ON 65TH STREET LS 1 6,379.05 6,379.05 CONSTRUCT AERIAL WATER MAIN CROSSING OVER NRC WCD050 BRIDGE LS 1 _ 53.921.26 53,921.26 WCD051 EXTEND THE HEIGHT OF SS -323 HEADWALL BY 3.8 FEET PER I REVISION #24 PHASE I B LS 1 19,328.48 19328.48 IMPLEMENT 53RD STREET BRIDGE PLAN REVISION #1 THAT REMOVED 36" SINGLE SLOPE TRAFFIC RAIL AND REPLACED WCD052 W/9'-4" RAISED SIDEWALK LS 1 31,144.36 31,144.36 WCDO53 APPLY CLASS 5 APPLIED FINISH COATINGS PER SECTION 976 TO ROADWAY BARRIER WALLS LS 1 9,628.13 9,628.13 REGRADE & RESET FORMS FOR WESTERN APPROACH SLAB WCD054 AT 57TH ST BRIDGE IN RESPONSE TO RFI 74 LS 1 9,372.30 9,372.30 REVISE THE SWALE ON 61 ST ST PER PLAN REV #22 TO WCD055 COLLECT STORMWATER BETWEEN STA 205+00 & 208+00 LS 1 7,657.46 7,657.46 WCD056 MODIFY S-1605 ON 57TH ST TO ACCOMMODATE HISTORIC DRAINAGE FORM FIELD TO THE NORTH LS 1 5,487.98 5487.98 WCDO57 HURRICANE PREPAREDNESS FOR HURRICANE [AN LS 1 6,403.12 6,403.12 PLACE 6" GRANULAR SUBBASE IN LIEU OF 12" TYPE B WCDO58 STABILIZATION ALONG 53RD ST WEST (APPROX 5187 S LS 1 58,532.89 58,532.89 WCDO59 ABANDON EXISTING WELL ON 65TH ST EAST (ST 311+30.8,3.2' LT, TOP ELEV 19.55 LS 1 10,222.88 1022288 WCD060 REIMBURSEMENT RAW MATERIAL PRICE INCREASE FOR WCD023 (FEBRUARY 2021) SY 4,486 20.55 92,191.41 WCDO61 ADJ FOR BITUMINOUS MAT'L - 1/2024 - 3/2024 LS 1 27,362.76 27,362.76 WCD062 RESET DRAINAGE STIR SS -216 INLET TOP LS 1 3,451.15 3,451.15 WCD063 CONSTRUCT 69TH ST WEST AS SHOWN IN PLAN REV 29 LS 1 51,357.05 51,357.05 WCD064 ABANDON IN[PLACE & FILL PARTIALLY INSTALLED PIPE RUNS ON 69TH ST WEST W/NON-EXCAVATABLE FLOWABLE FILL LS 1 20.218.94 2021894 WC.'D065 ADJ FOR BITUMINOUS MAT'L 4/1/2024 - 6/30/20204 LS 1 84.970.01 84,9701 7 RlioublicWorkskENGINEERING DIVISION PROJECTS\1505-66thAW Widenilng_49thSt to 69th SM-Adn-WAgencla ItemlProject CloseoLAXWORKING FOLDER\IRC-1505_DESC OF CFIGS CO 1 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 tem No.. Descn tion Unit Quantity Pricecrease , Umt Price- Price Increase , , e D _ REMOVE AND DISPOSE 2 DBIS AT APPROX STA297+53.50RT WCD066 AND STA300+53RT LS 1 23 565.17 23 565.17 REIMBURSE CONTRACTOR FOR GUARDRAIL PRICE INCREASE WCD067 AND ADDT 6 ITEM 536-8 EOR REVISION LS 1 41 975.00 41 975.00 WCD069 REPLACE 1 000'ROCK BASE WITH ASPHALT BASE FULL WIDTH LT ROADWAY FROM STA 367+10 TO STA 377+10 LS 1 417 155.16 417 155.16 DIRECTIONAL BORE UNDER SOUTHBOUND 66TH AVE AND INSTALL A 2" CONDUIT TO PASS THE ELECTRIC WIRES FROM WEST SIDE WHERE FPL POWER AVAILABLE FOR IRRIGATION WCD070 PUMPS LS 1 5,453.38 5,453.38 WCD071 RELOCATE DRAINAGE STRUCTURE SS -314 AND PERFORM ALL WORK ASSOCIATED WTH PLAN REVISION 32 LS 1 16 308.21 16 308.21 WCD072 SILT FENCE LS 1 6,768.81 6,768.81 F&I SIDEWALK PLATES AT THE OPEN JOINTS ON THE 53RD ST WCD073 BRIDGE LS 1 8,786.98 8,786.98 WCD074 ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - SEPT 30 2024 LS 1 52 380.08 52 380.08 WCD075 HURRICANE MILTON PREPAREDNESS MEASURES LS 1 5,336.55 5,336.55 WCD076 RELOCATE HEADWALL SS -220 AND REGRADE ADJACENT SWALE ALONG 65TH STREET EAST PER PLAN REV #28 LS 1 5,659.00 5669.00 WCD077 PROVIDE A 12" WIDE SLOT AT ELEVATION 20.85 (APPROX 4") ON THE EAST SIDE OF DRAINAGE STRUCTURE SS -329 LS 1 718.91 718.91 F&I PEDESTRIAN HANDRAIL (PAY ITEM 515 1 2) AT FIVE WCD079 LOCATIONS AND LENGTHS AS SHOWN ON WCD079 TOTAL 45 LF LS 1 3,053.44 3,053.44 WCDO80 INCORPORATE FDOT DCE MEMO 22-03 FOR STEEL GUARDRAIL LS 1 23 089.09 23 089.09 CONSTRUCT DRIVEWAY ON 57TH ST PER PLAN REV 16 AND WCDO82 ADD RADIUS CURBS AT DRIVEWAY ON 69TH ST LS 1 10 190.36 10 190.36 WCDO83 REGRADE EMBANKMENT ON EAST SIDE OF NORTH RELIEF CANAL AT LATERAL A CANAL LS 1 5,257.87 5,257.87 EXTEND PROPOSED FIBER OPTIC WORK FROM NW CORNER WCD084 OF 66TH AVE AT 57TH ST TO STORM GROVE MIDDLE SCHOOL LS 1 7,592. 0 7 592.00 WCD085 COMPENSATE CONTRACTOR FOR MATERIALS UNUSED IN MATERIAL DRAINAGE STRUCTURE S-412 LS 1 1,224.91 1,224.91 ADJ BID UNIT PRICE FOR BITUMINOUS MATERIAL JULY 1, 2024 - WCD086 SEPT 30 2024 LS 1 62 926.92 62 926.92 WCDO88 COMPENSATE CONTRACTOR FOR EXTENDED MOT & EROSION CONTROL 354 DAYS LS 1 422 440.00 422 440.00 WCDO89 134 DAY NONCOMPENSABLE TIME FOR FPL DELAYS LS 1 0.00 0.00 WCDO90 FINAL FIBER OPTIC CONNECTION CHANGES LS 1 22 468.72 22 468.72 F&I DUAL 6" UNDERDRAIN/INFILTRATION SYSTEM CONNECTING WCD091 TO STRUCTURE S-1508 LS 1 32 788.07 32 788.07 WCDO92 ADD'L PATCH PANEL AND SPLICES TO NEW FIBER OPTIC NETWORK AT 57TH STREET LS 1 3 243.16 3,243.16 WCDO93 ADDITIONAL THERMOPLASTIC STRIPING FOR PH1A NOT INCLUDED ON TABULATION OF QUANTITIES LS 1 1 6,864.00 6,864.00 ADJUST THE ROADWAY SHOULDER ELEVATION TO MATCH WCD095 CURRENT ELEVATION OF ROADWAY ON 65TH STREET WEST FROM STA 182+20 TO 184+20 LS 1 4,959.22 4,959.22 003-1A ROAD IRC 1 - FIELD OFFICE LS1 3 000.00 3,000.00 008 - 1A Road 01204 -SUBSOIL EXCAVATION CY 380 22.00 8,360.00 010 - 1A Road 0120 6 - EMBANKMENT COMPACTED IN PLACE CY 2 669 7.50 20 017.50 011 -1A Road 012170 - FLOWABLE FILL CY 100 170.00 17 000.00 012 - 1A Road 0160 4 - TYPE B STABILIZATION SY 894 2.70 2,413.80 013 - 1A Road 285709 - OPTIONAL BASE BASE GROUP 09 SY 699 13.00 9 087.00 F1Pub6c Works\ENGINEERING DIVISION PROJECTSM05-66th Ave Wdening_49th Sl to 69th Stll-Adn inlAgenda Ite=\Profecl CloseoLMORKING FOLDERVRC-1505_DESC OF CHCS CO 1 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 Item No.: De9cri tion ;. 'Unit. %Quantt . -Unit Price. _ Price_Increase.- Pirice:Decrease 014 - 1A Road 0286 1 -TURNOUT CONSTRUCTION SY 619 26.00 16 094.00 015 - 1A Road 0286 2 - TURNOUT CONSTRUCTION -ASPHALT TN 135 150.00 20 250.00 016 - 1A Road 0334 1 13 - SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, SP - 12.5 WCDO04 TN 3 91.00 236.60 022 - 1A Road 0425 1 361 - INLETS CURB TYPE P-6 <10' EA 2 5,500.00 11 000.00 024 - 1A Road 10425 1 461 - INLETS CURB TYPE J-6 <10' EA 1 8,778.00 8,778.00 025 -1A Road 0425 1 521 -INLETS, DITCH BOTTOM TYPE C <10' EA 2 3,455.00 6,910.00 032 -1A Road IRC 4 - PIPE CULVERT SCHEDULE 80 PVC ROUND 8" LF 31 62.00 1,922.00 034 - 1A Road 039 -1A Road 0430 175 118A- PIPE CULVERT CAP ROUND 18" S/CD 0430 175 136 - PIPE CULVERT RCP ROUND 36" S/CD LF LF 40140.00 350 145.00 5 600.00 50 750.00 041 -1A Road 0430 175 148 - PIPE CULVERT RCP ROUND 48" S/CD LF 50 249.00 12 450.00 044 - 1A Road 0430 175 166 - PIPE CULVERT RCP ROUND 66" S/CD LF 45 535.00 24 075.00 046 - 1A Road 0430 982 125 - MITERED END SECTION RCP 18" EA 12 1,470.00 17 640.00 051 -1A Road 0514 71 2 - PLASTIC FILTER FABRIC STABILIZATION SY 351 4.00 1404.00 052 -1A Road 0520 17 - CONCRETE CURB & GUTTER TYPE E MODIFIED LF 208 13.50 2,808.00 053 - 1A Road 0520 1 10 - CONCRETE CURB & GUTTER TYPE F LF730 12.50 9,125.00 054 - 1A Road 0522 2 - SIDEWALK CONCRETE 6" THICK SY 1.021 38.25 39 053.25 055 -1A Road 0523 2 -PATTERNED PAVEMENT, CONCRETE, NON VEHICULAR AREAS SY 143 85.00 12 155.00 057 -1A Road 0530 3 3 - RIPRAP RUBBLE BANK AND SHORE TN 479.59 151.00 72 418.09 058 -1A Road 0536 1 1 - GUARDRAIL - ROADWAY (INCLUDES PIPE RAIL FULL LENGTH) LF 68 21.00 1,428.00 061 - 1A Road 063 - 1A Road 0536 82 - GUARDRAIL ANCHORAGE - CONCRETE BARRIER WALL 0536 85 25 - GUARDRAIL END ANCHORAGE ASSEMBLY - TYPE II EA EA 1 1 4,000.00 1 415.00 4000.00 1,415.00 065 -1A Road 0550 60214 - FENCE GATE TYPE B SINGLE 18.1-20.0' OPENING EA 3 3 000.00 9,000.00 067 - 1A Road 0570 1 1 - PERFORMANCE TURF SOD 1 - BAHIA SY 1,247 3.00 3,741.00 068 - 1A Road 0570 1 2 - PERFORMANCE TURF SOD 2 - ST AUGUSTINE SY 14_68 0 4.50 66 060.00 070 - 1A Road 0700 20 13 - SINGLE POST SIGN F&I 21-30 SF AS 2 4,400.00 8.800.00 072 -1A Road 0700 160 - SINGLE POST SIGN REMOVE AS 5 30.00 150.00 073 - 1A Road 0706 3 - RETRO REFLECTIVE PAVEMENT MARKERS AMBER/AMBER EA 39 4.50 175.50 074 - 1A Road 0706 3A- RETRO REFLECTIVE PAVEMENT MARKERS HrFE/RED EA 35 4.50 157.50 077-1A Road 071111123 -THERMOPLASTIC STANDARD WHITE SOLID 12" LF 3 2.50 7.50 078 -1A Road 0711 11124 -THERMOPLASTIC, STANDARD WHITE SOLID 18" LF 3 3.50 10.50 080 - 1A Road 0711 11131 -THERMOPLASTIC, STANDARD, WHITE, SKIP, 6", 10- 30 SKIP GM 0.022 1,350.00 29.70 084 -1A Road 0711 11211 -THERMOPLASTIC, STANDARD YELLOW SOLID 6" NM 0.123 5,300.00 651.90 nm - 1A Rnari 0711 11224 - THERMOPLASTIC. STANDARD, YELLOW, SOLID 18" LF 2 3.00 6.00 7 F;M-&ic Warks\ENGINEERING DIVISION PROJECTS\160566th Ave Widening_49th St to 69th St11-AdminXAgenda Item Troject Closeout\WORKING FOLDERMRC-1505_DESC OF CHGS Col 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 Item N&.. . Description _: Unit 1:'Quantity7 Unit Price .: Price Increase' Price Decrease 086 - 1A Road 0711 11241 -THERMOPLASTIC, STANDARD, YELLOW, DOTTED/GUIDELINE/6-10 GAP EXTENSION 6" LF 223 1.00 223.00 102 - 1A Road 0635 2 13 - 30" X48" SPLICE BOX FOR FIBER OPTIC EA 3 1,200.00 3,600.00 172-1 B Road 110-7-1 - MAILBOX F & I EA 31 1 100.00 3.100.00 174 - 1 B Road 120-4 -SUBSOIL EXCAVATION CY 282 22.00 6 204.00 175 - 1 B Road 120-5 - CHANNEL EXCAVATION CY 890 3.50 3,115.00 176 - 1 B Road 120-6 - EMBANKMENT CY 1,061 7.50 7957.50 177 - 1 B Road 160-4- TYPE "B" STABILIZATION SY 3,511 2.70 9 479.70 178 - 1 B Road 285-709 - OPTIONAL BASE BASE GROUP 9 SY 2,909 13.00 37 817.00 179 - 1 B Road 286-1 -TURNOUT CONSTRUCTION SY 2,320 26.00 60 320.00 181 - 1 B Road 334-1-13 - SUPERPAVE ASPHALT CONCRETE (SP -12.5) (TRAFFIC C 2" TN 4.3 91.00 391.30 184 - 1 B Road 400-1-2 - CLASS I CONCRETE ENDWALL CY 1.3 1,100.00 1 430.00 188 - 1 B Road 425-1-351 - INLETS CURB(TYPE P-5 <10' EA 2 4.880.00 9,760.00 189 - 1 B Road 425-1-361 -INLETS CURB PE P-6 <10' EA 2 4,900.00 9,800.00 199 - 1 B Road 425-1-541A- INLETS (DT BOT)(TYPE D) (<10) (CONTROL STRUCTURE W/ EXTERNAL SKIMMER) EA 5 6,400.00 32 000.00 211 - 1 B Road 430-175-124 - PIPE CULVERT RCP ROUND 24" SS LF 3 82.00 246.00 224 - 1 B Road 430-175-218 - PIPE CULVERT ERCP 14" X 23" SS LF 58 80.00 4,640.00 228 - 1 B Road 430-982-125 - MITERED END SECTION CONC. 18" CD EA 3 1,470.00 4,410.00 230 - 1 B Road 430-982-625 - MITERED END SECTION CONC. 14"X23"CD EA 3 1,600.00 4 800.00 231 - 1 B Road 440-1-20 - UNDERDRAIN LF 25 50.00 1,250.00 232 - 1 B Road 440-1-60 - ROCK DRAIN LF 100 1 31.00 3.100.00 233 -1 B Road 520-1-10 -CONCRETE CURB & GUTTER TYPE F LF 311 12.50 3887.50 235 - 1 B Road 522-2 - CONCRETE SIDEWALK 6" THICK SY 310 38.25 11 857.50 237 -1 B Road 530-3-4 - RIPRAP RUBBLE (F&I) (DITCH LINING TN 449.63 151.00 67 894.13 238 - 1 B Road 536-1-1 -GUARDRAIL(ROADWAY) LF 110 21.00 2310.00 240 - 1 B Road 536-85-25 - GUARDRAIL END ANCHORAGE ASSEMBLY PE II EA 2 1,400.00 2,800.00 242 - 1 B Road 550-10-110A- FENCING PEA 5.0' STANDARD LF 88 19.00 1,672.00 243- 113 Road 550-10-1106 - FENCING PEA 4.0' STANDARD LF 328 16.00 5248.00 244 - 1 B Road 550-10-220 - FENCING PE B 6.0' STANDARD LF 661 18.00 11 898.00 246 - 1 B Road 550-10-410A - FENCING(WOOD) 4.0' 3 RAIL SPLIT RAIL LF 267 11.00 2,937.00 247 - 1 B Road 550-10-4108 - FENCING(WOOD) 5.0' 3 RAIL SPLIT RAIL LF 696 11.00 7,656.00 248 - 1 B Road 550-60-213 - FENCE GATE PE B SINGLE 16.0' OPENING EA 1 2.800.00 2,800.00 250 - 1 B Road 550-60-912 - FENCE GATE(WOOD) SINGLE 10.0' OPENING EA 1 2,800.00 2,800.00 251 -1 B Road 570-1-2A- PERFORMANCE TURF SOD BAHIA SY 362 3.00 1,086.00 7 F:\Public Warks\ENGINEERING DIVISION PROJECTS\1505-66th Ave Widening -.49th St to 69th St\1-Admin\Agenda Items\Project Closeout\WORKING FOLDER\IRC-1505_DESC OF CHGS CO 1 66TH AVENUE ROADWAY WIDENING (49TH STREET TO 69TH STREET) PROJECT NO. IRC -1505 BID NO. 2021018 Item No. " Description _ _ .Unit Quantl 'Unit Price Priced ncrease Price Decrease: 252 - 1 B Road 630-2-11A- CONDUIT OPEN TRENCH) (F&I) (2" LF 18 4.00 72.00 253 - 1 B Road 630-2-11B -CONDUIT OPEN TRENCH F 2" LF 18 4.00 72.00 264-IBS&M 711 -11 -121 -THERMOPLASTIC STD WHITE SOLID 6" LF 1 511 1.00 511.00 265 - 16 S&M 711-11-122 -THERMOPLASTIC STD WHITE SOLID 8" LF 515 1.00 515.00 266 -1 B S&M 711-11-123 -THERMOPLASTIC STD WHITE SOLID 12" LF 7 2.50 17.50 267 -1 B S&M 711-11-124 - THERMOPLASTIC STD WHITE SOLID 18" LF 4 3.50 14.00 269 -1 B S&M 711-11-131 -THERMOPLASTIC, STD WHITE SKIP 10'-30' 6" LF 9 1.00 9.00 270 -1 B S&M 711-11-141 - THERMOPLASTIC STD WHITE SKIP 2'-4' / 6-10' 6" LF 2 1.00 2.00 274 - 1 B S&M 711-11-224 - THERMOPLASTIC STD YELLOW SOLID 18" LF 10 3.50 35.00 275 - 1 B S&M 711-11-241 - THERMOPLASTIC STD YELLOW SKIP (2'-4'/ 6'-101 LF 1,109 1.00 1,109.00 306 - 1 B LS & Irr 570-1-2B - PERFORMANCE TURF SOD ST AUGUSTINE'FLORAT SY 16,355 4.50 73 597.50 339 -1 B 65th B 455-34-3A - PRESTRESSED CONCRETE PILING 18" SQ LF 208 37.00 7,696.00 CO -3 635-2-12 PULL & SPLICE BOX F & I SIGNAL 24 x 36 EA 1 2,630.25 2,630.25 WCDO03 Overrun Underrun Pa Items 649 (Signal Mast Arms Phase 1 B Plan R LS 1 17 300.00 17 300.00 WCDO04 ASPHALT PAVEMENT DESIGN TYPICAL SECTION PHASE 1A LS 1 29 920.00 29 920.00 WCD068 REIMBRUSEMENT TO IRC FOR COST OF RESOLUTION TESTING FOR 2 STABILIZING SUBGRADE SAMPLES WHERE VT RESULTS WERE USED FOR ACCEPTANCE LS 1 243.20 243.20 WCD078 REIMBURSEMENT TO IRC FOR COST OF 1,799 LF OF PEDESTRIAN PIPE RAIL NOT INSTALLED ON PHASE 1A PORTION OF THE PROJECT LS 1 16 191.00 16 191.00 WCDO81 CREDIT TO COUNTY FOR REDUCTION IN MAST ARM LENGTHS OF SIGNALIZATION POLES AT 66TH AVE & 57TH St LS 1 11 283.00 11 283.00 WCDO87 REIMBURSE IRC FOR RESOLUTION TESTING & DEFECTIVE ASPHALT LS 1 1079.84 1079.84 WCDO97 ASPHALT PAY QUANTITY ADJUSTMENT (PAY ITEM 337 7 82) LIMIT TO MAX OF 105% OF THE SPREAD RATE LS 1 203 612.50 203 612.50 FA FORCE ACCOUNT 3,500,000.00 SUBTOTALS .97 66TH AVE (49TH ST - 69TH ST) TOTAL I $ (1,322,311.29) 1 7 RIPubllc Works\ENGINEERING DIVISION PROJECTSM05.66th Ave Wden'mg_49th St to 69th StX1-Admf6Vgenda ItemXProject Closeout%WORKING FOLDERVRC-1505_0ESC OF CHGS CO 1