This Work Order Number 3 is entered into as of this 19 day of August , 2025
pursuant to that certain Continuing Contract Agreement, dated January 9, 2024, ("Agreement"), by and
between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and
CPZ Architects, Inc.
("Consultant")
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The
professional services will be performed by the Consultant for the mutually agreed upon lump sum or
maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing,
and at a rate not to exceed the prices set forth in Exhibit B of the Agreement (Rate Schedule) for RFQ
2023062, made a part hereof by this reference. The Consultant will perform the professional services
within the timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work
Order and made a part hereof by this reference all in accordance with the terms and provisions set
forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work
Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed
to be incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of th.l date first,'s,`
written above. s%`=
CONSULTANT: BOARD OF COUNTY COMMISSI¢ R5-,@ 'cn:
INDIAN RIVER COUNTY:
By.
Name: Joseph J Barry By:
Title: President seph E. Flescher, Chairman
Date: August 5, 2025
CC App oval te:Aug�st 19, 2p-25
r
By:1,;40ZA"i
Wj--
hn A. T tkanich, Jr., County dministrator
Approved as to Form and Legal Sufficiency:
By:�
County Attorney
Ryan L. Butler, Clerk of
Court and Comptroller
Attest: %�
Deputy Clerk
(SEAL)
Request for Work Order Under CCNA Contract
Project ID:
Date: $/5/2025
Requestor: Rob Skok
Project Title: CP-2515B Admin Bldg B 2nd Floor NW Office Build-out HR
D
Type of Project: Design Project
❑_ Not a Design Project
Expected Total 11?_ Less Than $7.5 Million Construction Cost
Project Cost:
❑_ Over $7.5 Million Construction Cost
❑_ Less than $500,000 Study Cost
Study Activity
❑_ Over $500,000 Study Cost
Consultant
CPZSelected: Architects, Inc.
County has executed an agreement with CPZ Architects, Inc. as part of continuing
Justification for services 2023062.
Selection:
Scope of
Services:
Contract:
Amount
Requested:
Account Name
& Number:
Approval:
Project Manager:
Design Services, provide construction documents, and support through bidding and
construction.
0_2022064 Surveying & Mapping
0_2023015 Engineering Services
❑_2023060 Environmental & Biological Services
❑ 2023061 Geotechnical Services
❑ 2023062 Architectural Services
$121,385.00
For Engineering Services Please Select
Discipline:
EI—Environmental
0—infrastructure
❑_Site/ Civil
E-1—Utilities
Impact fees -public buildings, Building & Facility Services, IRC Bldg. B - 2nd Floor
Office Build out 10322019-066510-20033.
Digitally signed by: Rob Skok
Rob Skok DN: CN = Rob Skok email = rskok@indianriver.gov C =
AD
Date: 2025.08.05 14:44:22 -04'00'
For Purchasing Use Only: wo# 03 Issued on: 8/5/2025
"Designing Quality Architecture that Builds Lasting Relationships"
August 05, 2025
Carlos Luis Flores, RA
Dept. of Building & Facility Services, Indian River County BOCC
1800 27th Street (Bldg. A),
Vero Beach, FL 32960
Re: IRC Administration Building B — 2nd Floor West Side, HR Office Build -out
Architectural and Engineering Design Proposal
Dear Mr. Flores:
As requested, we are pleased to offer the following fee proposal to provide Architectural
Design and Engineering Services for Design, Construction Documents, and Construction
Administration for office improvements for the Department of Human Resources as
shown in the attached drawings. This will be developed in the currently vacant space on
the second floor of building B. It is understood this project shall be part of a one project
BID for all the second floor, encompassing the HR Dept. and Natural Resources Dept.
Our scope of Services includes areas shown on the attached drawings. (See attached
drawings).
The scope of work includes the following:
a. This project is for an interior build -out project for the Department of Human
Resources within the existing Administration Building B, second floor. The current
program calls for about 7,566 SF of new office build -out. The attached drawings
show internal program needs and goals with the departments to establish initial space
layouts. (see attached)
1. We will provide services for the following phases.
a. Schematic Design
i. Review and documentation of the existing conditions.
ii. Meetings with the County Staff, two (2) in person and two (2) online as
needed.
iii. Prepare base drawings to be used throughout the project.
iv. Building Code review and documentation.
v. Prepare schematic level floor plans for review with County.
vi. Provide revisions based on comments.
b. Design Development
i. Develop the plan and coordinate with mechanical, electrical, and plumbing.
ii. MEP Engineer field review and documentation.
iii. Final coordination with the county staff.
iv. Final Life Safety Plan
v. Coordination with County IT Staff for locations and infrastructure needs.
vi. Review and select final finishes. Prepare two options with finish boards.
CPZ ARCHITECTS, INC.
Project #2353B 4316 WEST BRowARD BOULEVARD, PLANTATION, FLORIDA 33317
Page 1 of 4 (954) 792-8525, FAX (954) 337-0359
AA #26000685 W W W.CPZARCHITECTS.COM
"Designing Quality Architecture that Builds Lasting Relationships"
vii. Prepare a final Design Development package of Architectural and MEP
Drawings
viii. Two on-site meetings.
c. Construction Drawings
i. Develop full construction drawings for the use in bidding and permitting.
ii. One (1) site meeting for review and coordination
iii. One (1) virtual meeting
iv. Final Architectural and Engineering drawings.
v. Informal review with the County Building Department if possible.
d. Bidding
i. Respond to questions.
ii. Attend a pre-bid meeting on site.
iii. Review bids.
e. Permitting
i. Sign and Seal fmal documents.
ii. Respond to building department comments.
iii. Revise drawings as required.
f. Construction Administration Service
i. Review shop drawings.
ii. Review and respond to RFI's from the contractor.
iii. Review Pay applications.
g. Construction Site Meetings
i. Architecturally we have included six (6) site meetings.
ii. MEP Engineers have included (3) site meetings.
COMPENSATION
Compensation for architectural and engineering services shall be on a stipulated basis and in
accordance with CPZ Architects, Inc. Continuing Services Contract. See attached spreadsheet
for the breakdown of hours.
A. Project Design Fees:
CPZ ARCHITECTS, INC.
Project #2353B 4316 WEST BRowARD BOULEVARD, PLANTATION, FLORIDA 33317
Page 2 of 4 (954) 792-8525, FAX (954) 337-0359
AA #26000685 WWW.CPZARCHrrECTS.COM
CPZ Archite cts
Description
CPZ
OCI
ML
Schematic Design & Existing Cond.
$
12,140.00
$
3,505.00
$
-
$ 15,645.00
Design Development
$
19,150.00
$
4,365.00
$
-
$ 23,515.00
Construction Drawmgs
$
24,150.00
$
12,480.00
$
6,530.00
$ 43,160.00
Bkkfing
$
1,505.00
$
1,720.00
$
-
$ 3,225.00
Permitting
$
2,005.00
$
3,060.00
$
-
$ 5,065.00
Construction Administration
$
13,810.00
$
10,780.00
$
1,505.00
$ 26,095.00
Construction Site Mtgs.
$
4,680.00
$
-
$
-
$ 4,680.00
6 Mtgs
3 Mtg
2 Mt
$
77,440.00
$
35,910.00
$
8,035.00
$121,385.00
TOTAL
CPZ ARCHITECTS, INC.
Project #2353B 4316 WEST BRowARD BOULEVARD, PLANTATION, FLORIDA 33317
Page 2 of 4 (954) 792-8525, FAX (954) 337-0359
AA #26000685 WWW.CPZARCHrrECTS.COM
"Designing Quality Architecture that Builds Lasting Relationships
B. Reimbursable expenses will be billed at actual cost plus 10% (ten percent) and
will include the following:
1. Reproductions and Printing
2. Fees paid to Municipalities.
C. Compensation for additional architectural/engineering services not included
above shall be computed on a per hour basis as follows:
1. Compensation for additional architectural/engineering Services not included in the
above, shall be computed on a per hour basis as follows:
1. Project Principal $225
2. Architect $195
3. Project Manager $150
4. Architectural Associate $125
5. Administrative Support $ 95
6. Consultants (Civil, Landscape, Structural, Mechanical, Electrical Engineers, etc.)
to be reimbursed at cost billed to Architect.
EXCLUSIONS
The following items are excluded from this proposal:
1. CSI Full Specification Book. Product specifications will be noted and
specified in the drawings.
2. Detailed Cost Estimate
3. Renderings
4. Presentation to the City Commission and Community Organizations.
Environmental Testing Services
IT and Security Services
7. Security Access Programing and Design
8. Three dimensional renderings or virtual tours.
9. As -Built measuring of all spaces. The County shall provide base CAD floor
and ceiling plans for use by our office.
We thank you for the opportunity to offer you these services. All services will be in
accordance with our continuing service agreement. If this proposal meets with your approval,
please provide a purchase order and we will start immediately. If you have any questions,
please contact me at 954-792-8525.
Respectfully,
CPZ ARCHrrECTS, INC.
11
Joseph J. Barry, ALA
President
CPZ ARCHITECTS, INC.
Project #2353B 4316 WEST BRowARD BOULEVARD, PLANTATION, FLORIDA 33317
Page 3 of 4 (954) 792-8525, FAX (954) 337-0359
AA #26000685 WWW.CPZARCHrfECTS.COM
"Designing Quality Architecture that Builds Lasting Relationships"
CMTA
18 June 2025
Mr. Chris P. Zimmerman, AIA
President
CPZ Architects, Inc.
4316 West Broward Boulevard
Plantation, FL 33317
Building Science Leadership
Re: Professional Services Fee Proposal - MEPFP Design Engineering
Indian River County - Administration Building "B" 2nd Floor
Human Resources Department - Renovation
1800 27th Street
Vero Beach, FL 32960
Dear Chris:
We are pleased to present you with our fee proposal for the above referenced
project. Following, is our scope of work and compensation for the project. Should
you find our fee proposal to be acceptable, please sign and return a copy for our
files.
Project Description / Scope of Work:
The project will be a 2nd floor tenant improvement of 7,566 sf+. Our scope of work
will be to rework existing Mechanical, Electrical, Plumbing and Fire Prevention
systems to build out the existing space to create new office space, lobby, design
for new male and female restrooms, design for a new training and conference
rooms.
Our scope of work will include the following items:
Mechanical Engineering:
Design Engineering for HVAC Design and Distribution to support the new
2nd Floor Office Layout.
Electrical Engineering:
• Design Engineering for Electrical Power Distribution and Circuiting.
• Design Engineering for Lighting, Switching and Controls.
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
CMTA
Building Science Leadership
• IT Design for Telecom/Data Device Locations, Back Boxes and Cable
Routing to Headend Room. Includes up to 2 IT Design Meetings, as
required.
• Design modification to the existing Fire Alarm System.
• Coordination with Specialty Equipment Vendors, Cut Sheets.
Plumbing Design:
• Design for domestic water and sanitary sewer to support new restroom and
breakrooms, if required.
Fire Protection Design:
Fire Sprinkler Head Adjustments to support the new floor plan.
Scope of Services:
Our Scope of Work and Services will include the following:
1. All Design Team Meetings, via Teams.
2. Electrical Specifications and Construction Documents (Revit (BIM) or
AutoCAD).
3. Design Documents, Reviews and Responses for:
• Construction Documents
• Permitting
• Bid Assistance
• Construction Administration - Responses to Contractor RFI's, Shop
Drawing Review (No More Than 2 Reviews) and up to 3 Site
Visits/Meetings for Observation of Work.
Compensation for Services:
Our base design fee for this new project will be Thirty -Five Thousand Nine
Hundred Ten Dollars ($35,910.00) plus customary reimbursable expenses.
We would anticipate our billing schedule would be as follows:
• Schematic Design & Existing Conditions $ 3,505.00
• Design Development $ 4,365.00
• Construction Drawings $12,480.00
• Permitting $ 3,060.00
• Bidding $ 1,720.00
• Construction Administration $10,780.00
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 132751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
00 0.0
CMTA
Reimbursable Expenses:
Building Science Leadership
Printing/Reproduction and Methods of Delivery to be Billed at Direct Cost. We
estimate reimbursables to be $250.00.
Additional Expenses / Excluded Items:
Services required beyond basic scope shall be negotiated on an as needed basis
at which time a proposal for additional services will be provided.
• Building Floor Plan Changes (Flip and Rotation)
• Commissioning
• Construction Administration
• Contractor As-Builts
• LEED Assistance / Energy Modeling
• Prototype Reuse
• Rational Analysis
• Value Engineering
Terms and Conditions:
CMTA, will perform the Scope of Work as outlined above for a base fee for design
and permitting for $35.910.00 monthly invoices will be submitted based upon
percent complete and are due upon receipt. Accounts unpaid for 45 days from the
date of invoice are subject to a 1.5 percent per month service charge. Accounts
unpaid for 75 days from the date of invoice will be a cause to suspend all
performance under this Agreement. In the event of a suspension of services,
CMTA, shall have no liability for any delay or other damage, contractual or
otherwise, caused by or arising out of the suspension of services of nonpayment.
Acceptance of any payment more than 75 days old shall not serve as a waiver of
CMTA's contractual right to suspend service for nonpayment. Exhibit A "General
Terms and Conditions" attached to this proposal is a part of this agreement.
Limits of BIM/Revit Design:
CMTA design standard for Revit is limited to Level of Development (LOD) 300.
• LOD 300 - The Model Element is graphically represented within the Model
as a specific system, object or assembly in terms of quantity, size, shape,
location, and orientation.
• Non -graphic information may also be attached to the Model Element.
• Coordination without clash detection software will be focused on major hard
clashes, major equipment layout and standard level of coordination to
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 132751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
00 0.0
CMTA
900
Building Science Leadership
ensure items fit within spaces/rooms and ceiling cavities provided by the
architect.
• CMTA does not provide design to Full Clash Detection until the Levels 350
and above are utilized.
• LOD 350 or above will require additional services.
PURSUANT TO FLORIDA STATUTE § 558.035, AN INDIVIDUAL EMPLOYEE
OR AGENT OF CMTA, MAY NOT BE HELD INDIVIDUALLY LIABLE FOR
DAMAGES RESULTING FROM NEGLIGENCE OCCURRING WITHIN THE
COURSE AND SCOPE OF PROFESSIONAL SERVICES RENDERED UNDER
THIS PROFESSIONAL SERVICES CONTRACT.
RESPF,,..CTFULLY SUBMITTED BY CMTA, INC.
18 June 2025
andy Swart Date
Partner
REVIEWED AND ACCEPTED BY:
Name:
Company:
Title:
Signature:
Date:
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
CMTA
CMTA
2025 Hourly Rates
Classification
Principal
Registered Professional Engineer
Senior Project Manager
Senior Project Engineer
IT / AV Systems Design Engineering
Lighting Design Engineering
Project Engineer
Senior Designer
Designer
CAD Operator
Clerical
Building Science Leadership
Hourly Rate
$210.00/hour
$195.00/hour
$170.00/hour
$170.00/hour
$160.00/hour
$160.00/hour
$135.00/hour
$125.00/hour
$110.00/hour
$ 80.00/hour
$ 70.00/hour
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
CMTA
Building Science Leadership
General Terms & Conditions
For the Attached CMTA Proposal and Agreement
Reference Conditions: CMTA, Inc., will hereinafter be referenced as CMTA and
the above referenced CLIENT will be referred to as CLIENT. The Project may be
hereinafter referenced either as the "Project" or by abbreviation as above set forth.
Entire Agreement: These General Terms and Conditions, along with the
Agreement for Services to which these General Terms and Conditions are
attached (the "Agreement for Services") and the Proposal attached to the
Agreement for Services (the "Proposal") (collectively with the Agreement for
Services and the Proposal, this "Agreement"), constitutes the entire agreement
between CLIENT and CMTA, regarding the Project. If CMTA has commenced work
in connection with the Project, all provisions in this Agreement for the benefit or
protection of either party shall apply to such activities. There are no prior or
contemporaneous, oral or written, representations, understandings or agreements
which are not fully expressed in this Agreement. No amendment or change order
shall be valid unless it is in writing and signed by an authorized representative of
the party against whom such an amendment or change order is sought to be
enforced.
Relationship of Parties. CMTA, in furnishing services to CLIENT, is an
independent contractor. CMTA does not undertake to perform any regulatory or
contractual obligation of CLIENT or to assume any responsibility for the CLIENT's
business or operations.
Subcontracting: CMTA shall supervise, perform or cause to be performed all work
to be accomplished by CMTA and may call upon the expertise of subcontractors
in the performance of the services hereunder.
Severability: The provision of this Agreement shall be severable, and if any
clause, sentence, paragraph, provision, or other part hereof shall be adjudged by
any court of competent jurisdiction to be invalid, such judgment shall not affect,
impair, or invalidate the remainder hereof, which remainder shall continue in full
force and effect.
Billings/Payments: Invoices for services shall be submitted monthly. Payment is
due within 30 days of receipt. If payment is not received 30 days of receipt, such
fees shall be subject to a service fee of 1.5% per month, and CMTA reserves the
right to pursue all appropriate remedies, including, without limitation, suspending
all performance under this Agreement. If services are suspended for nonpayment,
CMTA shall have no liability for any delay or other damage, contractual or
otherwise, caused by or arising out of the suspension of services of nonpayment.
Acceptance by CMTA of any payment more than 30 days overdue shall not serve
as a waiver of CMTA 's contractual right to suspend service for nonpayment. In
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
00100.* 000
C MTA
Building Science Leadership
the event of nonpayment of fees, CLI ENT will be responsible for all costs, including,
without limitation, court costs, collection costs, reasonable attorneys' fees, expert
fees, and all other costs allowed by law, which may be incurred by CMTA in pursuit
of payment.
Taxes. There shall be added to the charges under this Agreement, and CLIENT
shall pay to CMTA, an amount equal to any taxes, levies and duties, however
designated or levied, based upon such charges, this Agreement, the services or
materials provided, or their use, including, without limitation, state and local sales
and use taxes, which are paid by or are payable by CMTA , plus interest and
penalties, if any, exclusive, however, of United States federal, state or local taxes
based on the net income of CMTA . Notwithstanding the preceding sentences,
CMTA accepts full and exclusive liability for the payment of all employer
contributions and taxes measured by the remuneration paid to CMTA employees
as required by all applicable United States federal, state and local laws, rules and
regulations.
Waiver: No waiver by either party of any breach, default, or violation of any term,
warranty, representation, agreement, covenant, condition, or provision hereof shall
constitute a waiver of any subsequent breach, default, or violation of the same or
any other term, warranty, representation, agreement, covenant, condition, or
provision hereof. All waivers must be in writing and signed by the party against
whom enforcement of the waiver is sought. All remedies are cumulative, and the
election to pursue less than all remedies shall not be a waiver of the right to pursue
any other remedy.
Force Majeure: Obligations of either party under this Agreement shall be
suspended, and such party shall not be liable for damages or other remedies while
such party is prevented from complying herewith, in whole or in part, due to
contingencies beyond its reasonable control, including, but not limited to, strikes,
riots, war, fire, acts of God, injunction, compliance with any law, regulation, or
order, whether valid or invalid, of the United States of America or any other
governmental body or any instrumentality thereof, whether now existing or
hereafter created, inability to secure materials or obtain necessary permits,
provided, however, the party so prevented from complying with its obligations
hereunder shall promptly notify the other party thereof.
Compliance with Law: In the performance of all services to be provided
hereunder, CMTA agrees to comply with all applicable federal, state, and local
laws and ordinances and all lawful order, rules, and regulations of any constituted
authority.
Applicable Law; Jurisdiction; Venue: The validity, performance, and
construction of this Agreement shall be governed by and construed according to
the laws of the State of Florida exclusive of its conflicts of law provisions. All claims
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
:000.0 000
CMTA
Building Science Leadership
hereunder shall be tried solely and exclusively in the Courts of Orange County,
Orlando, Florida or the appropriate United States District Court. Each party
consents to the jurisdiction and venue of such court. EACH OF THE PARTIES
HEREBY KNOWINGLY AND VOLUNTARILY WAIVES ANY ALL RIGHTS TO A
JURY TRIAL IN ANY PROCEEDING INVOLVING ANY DISPUTE OR MATTER
ARISING UNDER THIS AGREEMENT.
Standard of CareMarranties: Services performed by CMTA under this
Agreement will be conducted in a manner consistent with that level of care and
skill ordinarily exercised by members of the profession currently practicing under
similar conditions. NOTWITHSTANDING ANYTHING TO THE CONTRARY
CONTAINED IN THIS AGREEMENT, CMTA MAKES NO OTHER WARRANTIES,
EXPRESS OR IMPLIED, WHETHER ARISING BY OPERATION OF LAW,
COURSE OF PERFORMANCE OR DEALING, CUSTOM, USAGE IN THE TRADE
OR PROFESSION, OR OTHERWISE, INCLUDING WITHOUT LIMITATION
IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A
PARTICULAR PURPOSE, AND ANY IMPLIED WARRANTIES ARISING UNDER
ANY STATUTE. Except for the warranty expressly set forth in this paragraph,
CLIENT acknowledges and agrees that it has relied on no other representations
or warranties and that no other representations or warranties have formed the
basis of its bargain hereunder.
Confidentiality: Each party shall retain as confidential all information and data
furnished to it by the other party which are designated in writing by such other party
as confidential at the time of transmission and are obtained or acquired by the
receiving party in connection with this Agreement, and said party shall not reveal
such information to any third party, except as required by law (in which case, the
party from whom disclosure is required shall give the other party prompt notice of
the demand and cooperate in efforts to limit disclosure).
Indemnification: CMTA and CLIENT each agree to indemnify, defend and hold
harmless the other from and against any and all amounts payable under any
judgment, verdict, court order or settlement for death or bodily injury or the damage
to or loss or destruction of any real or tangible personal property to the extent
arising out of the indemnifying party's negligence in the performance of this
Agreement or willful misconduct. The foregoing indemnities are contingent upon:
(1) the indemnified party promptly notifying the indemnifying party in writing of any
claim which may give rise to a claim for indemnification hereunder; (2) the
indemnifying party being allowed to control the defense and settlement of such
claim; and (3) the indemnified party cooperating with all reasonable requests of the
indemnifying party (at the indemnifying party's expense) in defending or settling
such claim. The indemnified party shall have the right, at its option and expense,
to participate in the defense of any action, suit or proceeding relating to such a
claim through a counsel of its own choosing. In the event claims, losses, damages,
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
:000.0 0".9904D
C MTA
Building Science Leadership
or expenses are caused by the joint or concurrent negligence of CMTA and
CLIENT, they shall be borne by each party in proportion to its negligence.
PURSUANT TO FLORIDA STATUTE § 558.035, AN INDIVIDUAL EMPLOYEE
OR AGENT OF CMTA, MAY NOT BE HELD INDIVIDUALLY LIABLE FOR
DAMAGES RESULTING FROM NEGLIGENCE OCCURRING WITHIN THE
COURSE AND SCOPE OF PROFESSIONAL SERVICES RENDERED UNDER
THIS PROFESSIONAL SERVICES CONTRACT.
Term: Unless sooner terminated or extended as provided herein, this Agreement
shall remain in full force and effect. Either party may terminate this Agreement at
any time by
giving seven (7) days written notice of such termination to the other party. Upon
such termination of this Agreement, CLIENT shall pay and reimburse CMTA for
services rendered and costs incurred by CMTA prior to the effective date of
termination. The rights and obligations of the parties under this Agreement shall
survive termination of this Agreement for any reason.
Precedence: These General Terms and Conditions shall take precedence over
any inconsistent or contradictory provisions contained in any proposal, contract,
purchase order, requisition, notice to proceed, or like document regarding CMTA
services, including without limitation the Agreement for Services and the Proposal.
The Agreement of Services shall take precedence over the Proposal.
Fee Schedule: Where lump sum fees have been agreed to between the parties,
they shall be so designated in the Agreement attached hereto and by reference
made a part hereof. Where fees are based upon hourly charges for services and
costs incurred by CMTA they shall be based upon the hourly fee schedule annually
adopted by CMTA
Limitation of Remedies, Liability and Damages: CLIENT's sole and exclusive
remedy in the event of a claim arising out of, resulting from or in connection with
this Agreement shall be for CMTA to repair, replace or otherwise correct the
breach. Other than CLIENT's obligations to make payments that are due and owing
under this Agreement, a party's and its affiliates' entire and collective liability arising
out of or relating to this Agreement, including without limitation on account of
performance or nonperformance of obligations hereunder, regardless of the form
of the cause of action, whether in contract, tort (including, without limitation,
negligence), statute or otherwise, shall in no event exceed the amounts paid or
payable to CMTA under this Agreement. NEITHER PARTY NOR ITS AFFILIATES
SHALL, UNDER ANY CIRCUMSTANCES, BE LIABLE TO THE OTHER PARTY
OR ITS AFFILIATES FOR ANY CLAIM BASED UPON ANY THIRD PARTY CLAIM
(EXCEPT AS PROVIDED FOR IN THE INDEMNIFICATION PARAGRAPH) OR
FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT, PUNITIVE,
EXEMPLARY OR SPECIAL DAMAGES OF ANY NATURE WHATSOEVER, OR
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 1 32751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
09000 000
c MTA
Building Science Leadership
FOR ANY DAMAGES ARISING OUT OF OR IN CONNECTION WITH ANY
DELAYS, LOSS OF PROFIT, INTERRUPTION OF SERVICE OR LOSS OF
BUSINESS OR ANTICIPATORY PROFITS, EVEN IF A PARTY OR ITS
AFFILIATES HAVE BEEN APPRISED OF THE LIKELIHOOD OF SUCH
DAMAGES OCCURRING.
Insurance: Upon written request, CMTA will provide certificates of insurance to
the client, evidencing coverage for Worker's Compensation, General Liability, Auto
Liability and Professional Liability prior to the commencement of services to be
provided herein.
Binding Nature and Assignment. This Agreement shall be binding upon and
inure solely to the benefit of the parties hereto and their successors and permitted
assigns, and nothing in this Agreement shall confer upon any other person or entity
any legal or equitable right, benefit or remedy of any nature whatsoever under or
by reason of this Agreement. Neither party may, nor shall have the power to,
assign or transfer this Agreement without the prior written consent of the other
party, except that CMTA may without consent assign or transfer this Agreement to
a successor to the business of CMTA to which this Agreement relates. Any claim
relating to the provision of services by CMTA, its affiliates or their respective staff
will be made against CMTA alone.
Approvals and Similar Actions. Where agreement, approval, acceptance,
consent or similar action by CLIENT or CMTA is required under this Agreement,
such action shall not be unreasonably delayed or withheld.
CMTA Maitland Office
600 South Maitland Avenue I Maitland, FL 132751
MEP Engineering I Performance Contracting I Zero Energy Engineering I Technology I Commissioning
CMTA Indian River County 6/18/2025
Building B - 2nd Floor Renovation
Human Resources Department
Task 1: Schematic Design & Existing Conditions
Principal/Mech
Registered Professional Engineer
$210 per hour
x 1 hours =
$210
Mechancial
Project Engineer
$135 per hour
x 6 hours =
$810
Electrical
Registered Professional Engineer
$195 per hour
x 1 hours =
$195
Electrical
Project Engineer
$135 per hour
x 6 hours =
$810
Plumbing
Senior Designer
$110 per hour
x 4 hours =
$440
Fire Protection
Senior Designer
$110 per hour
x 4 hours =
$440
CAD
CAD Operator
$80 per hour
x 4 hours =
$320
Clerical
Clerical
$70 per hour
x 4 hours =
$280
Task 1: Subtotal $3,505
Task 2: Design Development
Principal/Mech
Registered Professional Engineer
$210 per hour
x 1 hours =
$210
Mechancial
Registered Professional Engineer
$135 per hour
x 8 hours =
$1,080
Electrical
Registered Professional Engineer
$195 per hour
x 1 hours =
$195
Electrical
Project Engineer
$135 per hour
x 8 hours =
$1,080
Plumbing
Senior Designer
$110 per hour
x 4 hours =
$440
Fire Protection
Senior Designer
$110 per hour
x 4 hours =
$440
CAD
CAD Operator
$80 per hour
x 8 hours =
$640
Clerical
Clerical
$70 per hour
x 4 hours =
$280
Task 2: Subtotal $4,365
Page 1
CMTA Indian River County 6/18/2025
Building B - 2nd Floor Renovation
Human Resources Department
Task 3: Construction Drawings
Principal/Mech Registered Professional Engineer
Mechancial Registered Professional Engineer
Electrical
Registered Professional Engineer
Electrical
Project Engineer
Plumbing
Senior Designer
Fire Protection
Senior Designer
CAD
CAD Operator
Clerical
Clerical
Task 4: Permitting
$210
per hour
x 2 hours =
$420
$135
per hour
x 36 hours =
$4,860
$210
per hour
x 2 hours =
$420
$135
per hour
x 36 hours =
$4,860
$110
per hour
x 8 hours =
$880
$110
per hour
x 4 hours =
$440
$80
per hour
x 4 hours =
$320
$70
per hour
x 4 hours =
$280
Task 3: Subtotal $12,480
Principal/Mech
Registered Professional Engineer
$210 per hour
x 2 hours =
$420
Mechancial
Registered Professional Engineer
$135 per hour
x 6 hours =
$810
Electrical
Registered Professional Engineer
$210 per hour
x 2 hours =
$420
Electrical
Project Engineer
$135 per hour
x 6 hours =
$810
Plumbing
Senior Designer
$110 per hour
x 0 hours =
$0
Fire Protection
Senior Designer
$110 per hour
x 0 hours =
$0
CAD
CAD Operator
$80 per hour
x 4 hours =
$320
Clerical
Clerical
$70 per hour
x 4 hours =
$280
Task 4: Subtotal $3,060
Page 2
CMTA Indian River County 6/18/2025
Building B - 2nd Floor Renovation
Human Resources Department
Task 5: Bidding
Principal/Mech
Registered Professional Engineer
$210 per hour
x 1 hours =
$210
Mechancial
Registered Professional Engineer
$135 per hour
x 4 hours =
$540
Electrical
Registered Professional Engineer
$210 per hour
x 1 hours =
$210
Electrical
Project Engineer
$135 per hour
x 4 hours =
$540
Plumbing
Senior Designer
$110 per hour
x 1 hours =
$110
Fire Protection
Senior Designer
$110 per hour
x 1 hours =
$110
CAD
CAD Operator
$80 per hour
x 0 hours =
$0
Clerical
Clerical
$70 per hour
x 0 hours =
$0
Task 6: Construction Administration
Principal/Mech Registered Professional Engineer $210 per hour x
Mechancial
Registered Professional Engineer
$135 per hour x
Electrical
Registered Professional Engineer
$210 per hour x
Electrical
Project Engineer
$135 per hour x
Plumbing
Senior Designer
$110 per hour x
Fire Protection
Senior Designer
$110 per hour x
CAD
CAD Operator
$80 per hour x
Clerical
Clerical
$70 per hour x
Construction Site
Visits (Up to 3 Per Descipline)
Principal/Mech
Registered Professional Engineer
$210 per hour x
Principal/Elect
Registered Professional Engineer
$210 per hour x
Task 5: Subtotal $1,720
1 hours =
$210
8 hours =
$1,080
1 hours =
$210
16 hours =
$2,160
4 hours =
$440
4 hours =
$440
8 hours =
$640
8 hours =
$560
4 hours = $840 x 3 Visits =
4 hours = $840 x 3 Visits =
Project Total for Task 1 - 6 $35,910
Page 3
$2,520
$2,520
M L Engineering Inc.
2030 37`h Avenue
Vero Beach, FL 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
August 5, 2025
Mr. Paul Arciero, NCARB
CPZ Architects, Inc.
4316 West Broward Blvd. Suite 201
Plantation, FL 33317
Re: IRC Administration Bldg B — Folding Partition
180027 1h Street
Vero Beach, FL 32960
Engineer's Proposal
Dear Paul:
We are pleased to provide you with this proposal for structural engineering consulting services for the
above project. Our scope of work will be to design and prepare the structural documents for supporting
the proposed folding stackable partition wall.
Scope of Work
Phase I Design Documents
1. Site visit to assess the existing construction
2. Review available existing building plans
3. Coordination with CPZ Architects
4. Design and prepare the structural documents to include the following:
a. Framing plan, details, and specifications.
b. Sections, Details, and Schedules.
c. Miscellaneous structural details as required.
5. Structural notes and specifications in short format on drawings.
6. Signed and sealed documents as required for permit submittal.
Phase II Construction Administration
1. Structural submittal review
2. (1) site visit for construction observation
Note:
The following services are not included in our scope of work:
1. Material & Laboratory Testing
2. Demolition for exploratory assessment
3. Permit Application and Fees
M. I temp)CPZ architects URC admin bldg folding Partition IProIIRC Admin Folding wall-08.05.25.docx
IRC Administration Bldg B — Folding Partition
1800 27`h Street
Vero Beach, FL 32960
Engineer's Proposal
August 5, 2025
Page 2 of 3
Fees
Our fee for the above services will be as listed below. This will be invoiced as a lump sum upon
completion of each phase or monthly based on a percentage of completion at that time with payment in
full due within 30 days.
Phase I Design Documents
Phase II Construction Administration
The above fees are based on our standard hourly rates as follows:
Administration
ACAD Drafting
Inspector
Engineer
Principal Engineer
Schedule
To be determined.
$ 6,530.00
$ 1,505.00
$ 8,035.00
$ 95.00
$ 110.00
$ 150.00
$ 175.00
$ 200.00
If additional engineering services are requested, our services can be provided and billed at an hourly rate.
If at any time during the evaluation and design of the herein -stated project there are substantial revisions,
which may affect our proposal, we will notify you prior to making such changes.
Should you require further information or clarification, please contact our office.
Respectfully,
f � /
Michael A. Lue, P.E.
Consulting Structural Engineer
Accepted this day of
Signature
2025
IRC Administration Bldg B — Folding Partition
1800 271 Street
Vero Beach, FL 32960
Engineer's Proposal
August 5, 2025
Page 3 of 3
ATTACHMENT `A'
PROPOSAL/CONTRACT FOR ENGINEERS SERVICE
ACCEPTANCE:
The time for acceptance of the afore going proposal is limited to thirty (30) days from the date of the proposal.
If not accepted within that timeframe, the proposal will be withdrawn by ML Engineering, Inc., after which a new
proposal must be negotiated by the parties.
II. INDEMNIFICATION:
As a separate and distinct consideration for this indemnification agreement hereunder, the consideration of
which is $100.00, the receipt of which is acknowledged by the party with whom ML Engineering, Inc. is
contracting hereunder, that party agrees to indemnify and hold ML Engineering, Inc. harmless from any and all
claim and causes of action arising out of the work of ML Engineering, Inc. arising out of the work performed or
to be performed by the party with whom ML Engineering, Inc. is contracting hereunder, or any other contracting
parties' agents, affiliates, subsidiaries or assigns, excepting only such actions, claims or lawsuits arising out of
the gross negligence of ML Engineering, Inc., its affiliates, subsidiaries, officers and employees.
III. THIRD PARTY BENEFICIARY:
This agreement is entered into for the exclusive benefit of the parties, and the parties expressly disclaim any intent
to benefit anyone not a party.
IV. LATE PAYMENT:
All payments called for under the terms and conditions of this proposal will bear simple interest a 1-1/2% per month.
GOVERNING LAW AND VENUE:
This agreement is to be governed by the laws of the State of Florida and the venue in the event of any litigation
shall be Indian River County, Florida.
VI. LIABILITY:
The liability of ML Engineering, Inc. for damages arising out of its performance for any mistake, mission interruption,
delay, error or defects in the providing of its services set forth herein or any portion of its services, occurring in the
course of performing this agreement, shall in no event exceed the amount of the contract for services.
VII. TERMINATION FOR CAUSE:
ML Engineering, Inc. has the right to terminate the contract for cause, which includes any of the following events:
Failure to make timely payments.
Failure to respond to ML Engineering, Inc.'s written request for information or decisions.
If ML Engineering, Inc. verily believes that the work requested will result in a structure or
design that is not viable.
In the event of the above one or more grounds for termination for cause, ML Engineering, Inc. shall give a seven
day written notice, and if the grounds for termination are not corrected within the seven days, ML Engineering, Inc.
has the right to terminate the contract.
VIII. ATTORNEY FEES:
If either party brings a lawsuit in order to enforce or interpret the provisions of this agreement, the prevailing party
should be entitled to reasonable attorney fees in additional in addition to any other relief to which that party may
be entitled.
MANHOUR & FEE ESTIMATE FOR PROPOSED STRUCTURAL ENGINEERING SERVICES
Project: IRC ADMIN BLDG B Folding Partition
Date: 08.05.2025
By: M L Engineering Inc.
Task
Scope of Services
Principal
Engineer
$ 200.00
Engineer
$ 175.00
Project
Inspector
$ 150.00
ACAD Tech.
$ 110.00
$
Admin.
95.00
SUB
TOTALS
1
Site visit to assess exist construction
1.00
1.00
295.00
2
Coord W/ Architect
1.00
5.00
1.00
$
845.00
3
review as built buildnig plans
2.00
1.00
$
495.00
4
Design Docs
2.00
7.00
28.00
2.00
$
4,895.00
5
CA submittal review
3.00
3.00
4.00
1,5 5.00
Sum of Hours
9.00
10.00
0.00
1 33.00
9.00
Rates Per Position
$ 200.00
$ 175.00
$ 150.00
$ 110.00
$
95.00
Fee Per Position
$ 1,800.00
$ 1,750.00
$ -
$ 3,630.00
$
855.00
Total Estimated Fee:
$
8,035.00