Loading...
HomeMy WebLinkAbout2025-285SECTION 00942 - Change Order Form DATE OF ISSUANCE: 11/18/2025 No. 1 EFFECTIVE DATE: 11/18/2025 OWNER: Indian River County CONTRACTOR Timothy Rose Contracting, Inc. Project: 43rd Avenue Bicycle and Pedestrian Improvements 14th Lane and 15th Place Resurfacing OWNER's Project No. IRC -1818A OWNER'S Bid No. 2024043 You are directed to make the following changes in the Contract Documents: Reason for Change Order: The project is complete. This change order is intended to make final adjustments to bid line items and time to finalize the contract. Attachments: Description of Itemized Changes CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $388,803.64 Net decrease of this Change Order: $(97,271.74) Contract Price with all approved Change Orders: $291,531.90 ACCEPTED: By: Jordan Rose CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days) Substantial Completion: 150 Final Completion: 180 Net increase this Change Order: (days) Substantial Completion: 1 Final Completion: 1 Contract Time with all approved Change Orders: (days) Substantial Completion: 151 Final Completion: 1 181 RECOMMENDED: By; IRichard Reichenbach a �N ,• •� , a� ENGINEER (Signature) Date: APPROVED: David W. Schryver a OWNER (Signature) Date: IRC -1818A CO1 WORD 00942-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\1818A 14th Ln & 15th PI Resurfacin9\1-Admin\Agenda Items\Project Closeout\CO Back up\IRC- 1818A_CO1_WORD.doc Rev. 05/01 CHANGE ORDER NO. 1 DESCRIPTION OF ITEMIZED CHANGES PROJECT NAME: 43rd Avenue Bicycle and Pedestrian Improvements 14th Lane and 15th Place Resurfacing PROJECT NO. IRC -1818A BID NO. 2024043 430-175-115 PIPE CULVERT ROUND 15" S/CD POLYPROPYLENE LF 1 10 151.31 1,513.10 2,211.00 526-1-101 REMOVE AND REPLACE BRICK PAVERS SF 194 11.48 2,227.12 100 000.00 530-3-4 RIPRAP RUBBLE F&I, IrAULVERT INSTALLATION TN 2 244.59 489.18 0.16 570-1-1A PERFORMANCE TURF (SOD) (BAHIA) SY 131 5.42 710.02 570-1-1 B PERFORMANCE TURF SOD ST. AUGUSTINE SY 1 300.00 7.37 2,211.00 999-1 FORCE ACCOUNT LS 1 100 000.00 100 000.00 1A ROUNDING ISSUE LS 1 0.16 0.16 SUBTOTALS1 I 1 1 4,939.42 1 102,211.16 43rd Avenue Bicycle and Pedestrian Improvements 14th Lane and 15th Place Resurfacing TOTAL $ (97,271.74) 1 F:\Public Works\ENGINEER ING DIVISION PROJECTS\1818A 14th Ln & 15th PI Resurfacing\1-Admin\Ngenda fte"\Project Cbseout\CO Back up\IRC-1818A_CO1_EXCEL