HomeMy WebLinkAbout2025-285SECTION 00942 - Change Order Form
DATE OF ISSUANCE: 11/18/2025
No. 1
EFFECTIVE DATE: 11/18/2025
OWNER: Indian River County
CONTRACTOR Timothy Rose Contracting, Inc.
Project: 43rd Avenue Bicycle and Pedestrian Improvements
14th Lane and 15th Place Resurfacing
OWNER's Project No. IRC -1818A OWNER'S Bid No. 2024043
You are directed to make the following changes in the Contract Documents:
Reason for Change Order:
The project is complete. This change order is intended to make final adjustments to bid line
items and time to finalize the contract.
Attachments: Description of Itemized Changes
CHANGE IN CONTRACT PRICE:
Description
Amount
Original Contract Price
$388,803.64
Net decrease of this Change Order:
$(97,271.74)
Contract Price with all approved
Change Orders:
$291,531.90
ACCEPTED:
By:
Jordan Rose
CONTRACTOR (Signature)
Date:
CHANGE IN CONTRACT TIMES
Description
Time
Original Contract Time:
(days)
Substantial Completion:
150
Final Completion:
180
Net increase this Change Order:
(days)
Substantial Completion:
1
Final Completion:
1
Contract Time with all approved
Change Orders:
(days)
Substantial Completion:
151
Final Completion:
1 181
RECOMMENDED:
By; IRichard
Reichenbach a �N ,• •� , a�
ENGINEER (Signature)
Date:
APPROVED:
David W. Schryver a
OWNER (Signature)
Date:
IRC -1818A CO1 WORD
00942-1
F:\Public Works\ENGINEERING DIVISION PROJECTS\1818A 14th Ln & 15th PI Resurfacin9\1-Admin\Agenda Items\Project Closeout\CO Back up\IRC-
1818A_CO1_WORD.doc Rev. 05/01
CHANGE ORDER NO. 1
DESCRIPTION OF ITEMIZED CHANGES
PROJECT NAME: 43rd Avenue Bicycle and Pedestrian Improvements
14th Lane and 15th Place Resurfacing
PROJECT NO. IRC -1818A BID NO. 2024043
430-175-115
PIPE CULVERT ROUND 15" S/CD POLYPROPYLENE
LF
1 10
151.31
1,513.10
2,211.00
526-1-101
REMOVE AND REPLACE BRICK PAVERS
SF
194
11.48
2,227.12
100 000.00
530-3-4
RIPRAP RUBBLE F&I, IrAULVERT INSTALLATION
TN
2
244.59
489.18
0.16
570-1-1A
PERFORMANCE TURF (SOD) (BAHIA)
SY
131
5.42
710.02
570-1-1 B
PERFORMANCE TURF SOD ST. AUGUSTINE
SY
1 300.00
7.37
2,211.00
999-1
FORCE ACCOUNT
LS
1
100 000.00
100 000.00
1A
ROUNDING ISSUE
LS
1
0.16
0.16
SUBTOTALS1 I 1 1 4,939.42 1 102,211.16
43rd Avenue Bicycle and Pedestrian Improvements
14th Lane and 15th Place Resurfacing TOTAL $ (97,271.74)
1
F:\Public Works\ENGINEER ING DIVISION PROJECTS\1818A 14th Ln & 15th PI Resurfacing\1-Admin\Ngenda fte"\Project Cbseout\CO Back up\IRC-1818A_CO1_EXCEL