Loading...
HomeMy WebLinkAbout2025-288SECTION 00942 - Change Order Form No. 1 DATE OF ISSUANCE: 12/9/2025 EFFECTIVE DATE: 12/9/2025 OWNER: Indian River County CONTRACTOR Timothy Rose Contracting, Inc. Project: Waters Edge Culvert Replacement OWNER's Project No. IRC -2201 OWNER'S Bid No. 2024046 You are directed to make the following changes in the Contract Documents: Reason for Change Order: The project is complete. This change order is intended to make final adjustments to bid line items and time to finalize the contract. Attachments: Description of Itemized Changes CHANGE IN CONTRACT PRICE: Description Amount Original Contract Price $1,366,739.45 Net decrease of this Change Order: $(182,764.95) Contract Price with all approved Change Orders: $1,184,380.10 ACCEPTED: Jordan RoseBy: 11 CONTRACTOR (Signature) Date: CHANGE IN CONTRACT TIMES Description Time Original Contract Time: (days or dates) Substantial Completion: 270 Final Completion: 300 Net increase (decrease) this Change Order: (days or dates) Substantial Completion: 5 Final Completion: 5 Contract Time with all approved Change Orders: (days or dates) Substantial Completion: 275 Final Completion: 305 RECOMMENDED: Richard. By: Reichenbach ' *^ ENGINEER (Signature) Date: 0100TOMM on David W. Schryverp M.I By:Ww mz OWNER (Signature) Date: IRC -2201 COl 00942-1 F:\Public Works\ENGINEERING DIVISION PROJECTS\2201 Waters Edge Culvert Replacement\1-AdminWgenda Items\Project Closeout\Change Order No. 1 6-UP\IRC- 2201_CO1.doc Rev. 05/01 CHANGE ORDER NO. 1 DESCRIPTION OF ITEMIZED CHANGES PROJECT NAME: WATERS EDGE CULVERT REPLACEMENT PROJECT NO. IRC -2201 BID NO. 2024046 Item No. Description Unit Quantit Unit Price Price increase Price Decrease IRC PORTION WCD2 DEFLECTION OF 8" WATER MAIN UNDER PROPOSED 24" CROSS DRAIN AT ST 11+16 TO MEET MINIMUM SEPARATION REQUIREMENTS LS 1 10,566.23 10 566.23 334-1-53A SUPERPAVE ASPHALT CONCRETE (SP-9.5)(TRAFFIC C)(PG76- 22)(1") TON 17.71 278.00 4,923.38 334-1-53B SUPERPAVE ASPHALT CONCRETE (SP-12.5)(TRAFFIC C)(PG76- 22)(2-1/2") TON 7.37 1 380.00 2,800.60 999-25 FORCE ACCOUNT LS 1 100 000.00 100 000.00 WATERS EDGE HOA PORTION WCD2 OVEREXCAVATION & BACKFILLING SUITABLE MAT'L FOR INSTALLATION OF 60" CULVERT BENEATH 36TH COURT SW FROM STA 12+61 TO STA 13+57 LS 1 5,750.40 5,750.40 334-1-53B SUPERPAVE ASPHALT CONCRETE (SP-12.5)(TRAFFIC C)(PG76- 22)(2-1/2") TON 10 885.00 8,850.00 570-1-1 PERFORMANCE TURF SOD BAHIA SY 1 8 4.00 32.00 570-1-2 PERFORMANCE TURF SOD ST. AUGUSTNE SY 276 7.50 2,070.00 999-25A FORCE ACCOUNT LS 1 80 000.00 80 000.00 SUBTOTALS 16,316.63 198,675.98 PROJECT NAME TOTAL j $ (182,359.35) F:�Pubhc WorksIENG IN EER ING DIVISION PROJECTS�2201 Waters Edge Culvert Re olacenenn l- Ad- n'Agenda lteI- Proloct Close outtChange Order No. 1 &UP1RC-2201_TRC_CO1_20251118