HomeMy WebLinkAbout2025-288SECTION 00942 - Change Order Form
No. 1
DATE OF ISSUANCE: 12/9/2025 EFFECTIVE DATE: 12/9/2025
OWNER: Indian River County
CONTRACTOR Timothy Rose Contracting, Inc.
Project: Waters Edge Culvert Replacement
OWNER's Project No. IRC -2201 OWNER'S Bid No. 2024046
You are directed to make the following changes in the Contract Documents:
Reason for Change Order:
The project is complete. This change order is intended to make final adjustments to bid line
items and time to finalize the contract.
Attachments: Description of Itemized Changes
CHANGE IN CONTRACT PRICE:
Description
Amount
Original Contract Price
$1,366,739.45
Net decrease of this Change Order:
$(182,764.95)
Contract Price with all approved
Change Orders:
$1,184,380.10
ACCEPTED:
Jordan RoseBy:
11
CONTRACTOR (Signature)
Date:
CHANGE IN CONTRACT
TIMES
Description
Time
Original Contract Time:
(days or dates)
Substantial Completion:
270
Final Completion:
300
Net increase (decrease) this
Change Order:
(days or dates)
Substantial Completion:
5
Final Completion:
5
Contract Time with all approved
Change Orders:
(days or dates)
Substantial Completion:
275
Final Completion:
305
RECOMMENDED:
Richard.
By:
Reichenbach ' *^
ENGINEER (Signature)
Date:
0100TOMM on
David W. Schryverp M.I
By:Ww mz
OWNER (Signature)
Date:
IRC -2201 COl
00942-1
F:\Public Works\ENGINEERING DIVISION PROJECTS\2201 Waters Edge Culvert Replacement\1-AdminWgenda Items\Project Closeout\Change Order No. 1 6-UP\IRC-
2201_CO1.doc Rev. 05/01
CHANGE ORDER NO. 1
DESCRIPTION OF ITEMIZED CHANGES
PROJECT NAME: WATERS EDGE CULVERT REPLACEMENT
PROJECT NO. IRC -2201 BID NO. 2024046
Item No.
Description
Unit
Quantit
Unit Price
Price increase
Price Decrease
IRC PORTION
WCD2
DEFLECTION OF 8" WATER MAIN UNDER PROPOSED 24"
CROSS DRAIN AT ST 11+16 TO MEET MINIMUM SEPARATION
REQUIREMENTS
LS
1
10,566.23
10 566.23
334-1-53A
SUPERPAVE ASPHALT CONCRETE (SP-9.5)(TRAFFIC C)(PG76-
22)(1")
TON
17.71
278.00
4,923.38
334-1-53B
SUPERPAVE ASPHALT CONCRETE (SP-12.5)(TRAFFIC C)(PG76-
22)(2-1/2")
TON
7.37 1
380.00
2,800.60
999-25
FORCE ACCOUNT
LS
1
100 000.00
100 000.00
WATERS EDGE HOA PORTION
WCD2
OVEREXCAVATION & BACKFILLING SUITABLE MAT'L FOR
INSTALLATION OF 60" CULVERT BENEATH 36TH COURT SW
FROM STA 12+61 TO STA 13+57
LS
1
5,750.40
5,750.40
334-1-53B
SUPERPAVE ASPHALT CONCRETE (SP-12.5)(TRAFFIC C)(PG76-
22)(2-1/2")
TON
10
885.00
8,850.00
570-1-1
PERFORMANCE TURF SOD BAHIA
SY
1 8
4.00
32.00
570-1-2
PERFORMANCE TURF SOD ST. AUGUSTNE
SY
276
7.50
2,070.00
999-25A
FORCE ACCOUNT
LS
1
80 000.00
80 000.00
SUBTOTALS
16,316.63
198,675.98
PROJECT NAME TOTAL
j $ (182,359.35)
F:�Pubhc WorksIENG IN EER ING DIVISION PROJECTS�2201 Waters Edge Culvert Re olacenenn l- Ad- n'Agenda lteI- Proloct Close outtChange Order No. 1 &UP1RC-2201_TRC_CO1_20251118