Loading...
HomeMy WebLinkAbout2025-289AMENDMENT 1 TO WORK ORDER 2 FLORAVON SHORES SEPTIC TO SEWER - IRCDUS 21.19.556 This Amendment 1 to Work Order Number 2 is entered into as of this 9th day of December, 2025, pursuant to that certain Continuing Contract Agreement, dated April 17, 2018, renewed and amended as of May 18, 2021 (collectively referred to as the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Schulke, Bittle & Stoddard, LLC ("Consultant"). 1. The COUNTY has selected the Consultant to perform the professional services set forth in existing Work Order Number 2 , Effective Date June 8, 2021 2. The COUNTY and the Consultant desire to amend this Work Order as set forth on Exhibit A (Scope of Work) attached to this Amendment and made part hereof by this reference. The professional services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule), and within the timeframe more particularly set forth in Exhibit C (Time Schedule), all in accordance with the terms and provisions set forth in the Agreement. 3. From and after the Effective Date of this Amendment, the above -referenced Work Order is amended as set forth in this Amendment. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Amendment 1 to Work Order 2 as of the date first written above. CONSULTANT: BOARD OF COUNTY COMMISSIONER Schulke, Bittl Stodda d, LLC OF INDIAN RIVE OUNTY ;=�;= �'• By: By: Deryl Loar Chairmah; Print N me: o h W. Schulke P.E. y °'VRi��RCov��'• Title: M nagging Member BCC Approved Date: December 9, 2025 Attest: Ryan L. Butler, Clerk of Court and Comptroller By: Deputy Clerk Approved: �GvL John A. Titkanich, Jr., County Administrator Approved as to form and legal sufficiency: , Chrisyopher A. Hicks, Assistant County Attorney JOSEPH W. SCHULKE, JODAHB BITTLE,P.E. PE SCHULKE, BITTLE & STODDARD, L.L.C. WILLIAM P. STODDARD, Ph.D., P.E. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING September 29, 2025 TO: Jesse Roland FROM: Joseph Schulke, P.E. REF: IRC -21.19.556 - Floravon Shores Septic to Sewer Amendment no 1 to Work Order No 2 Please accept this as a formal request to amend the Work Order No. 2, to provide for additional time and compensation for Contract Administration Services for the above referenced project. The project was initially contemplated in 2018, and SBS was asked to prepare a proposed work order. After several years of deliberating the merits of the project, IRC approved the WO in June 2021. SBS prepared the engineering plans and specifications in 2021/2022. However, IRC decided to postpone the construction. In 2025, IRC decided to move forward with the project. During the design and permit review of the project, IRC PW / engineering required that the project include drainage improvements, the raising (elevation), regrading and re -building of a portion of the road, and the milling and overlay of the entire road within the impacted area. In addition, due to the change in the scope of the construction, the timeline for the work changed from 5 to 6 months to 11 to 12 months. Because of the significant increase in the duration of the work and the complexity of the work, the engineer's contract administration scope, work and fees is requested to be adjusted. Attached is the worksheet which estimates the manhours and fee total for the Contract administration services anticipated for the work. The total CA fees are estimated to be: $43,194.50. Change to contract: The contract proposal provided for a total fee of $43,194.50, of which $13,500 was budgeted for Contract Administration. The change in the total contract amount and the CA amount is $29,694.50. Summary: Original Contract Amount: $44,750 $44,750 New CA fee $43,194.50 Original CA fee: ($13,500) Change in Fee: $29,694.50 $29,694.50 New contract amount: $74,444.50 $74,444.50 Upon your review, should you have any questions or require additional information, please do not hesitate to contact me. Sincerely, a) a4zd4� Joseph W. Schulke, P.E. 1717 INDIAN RIVER BOULEVARD, SUITE 301 VERO BEACH, FLORIDA 32960 TEL 772 / 770-9622 FAX 772 / 770-9496 EMAI IL info@sbsengineers.com Worksheet Amendment #1 Project: Indian River County Septic to Sewer - Floravon Shores Indian River County Bid No. 2025045: Project # 21.19.556 Total 51.5 CONSTRUCTION 55.5 TASK ENGINEER MANAGER ADMIN - RFI's 2 _ 1 - Bid Opening & Review Bids 3 1 0.5 - Engineer Reccomend 1 - 0.5 - Pre -pre Construction Meeting IRC & Contractor 1 1 0.5 - Shop Drawing Review 0.5 2 1 - Pre -Construction IRC, FDOT, Contractor 2 3 1 Construction Inspections Day 30 to 330 = 43 weeks 32 301 43 Pay App Review - Assume 4 2 4 1 RFI/Change Orders/Field Directives - Assume 3 3 6 1.5 Substantial Completion Walk Thru/Punch List 2 2 0.5 Certification/As-built Review 1 4 Completion/Close-out 2 3 1 4 Total 51.5 327 55.5 Rate $175 $93.50 $65 Fee $9,012.50 $30,574.50 $3.608 Total $43,194.50