Loading...
HomeMy WebLinkAbout2026-052AMENDMENT NO. 5 TO AGREEMENT NO. 19IR3 BETWEEN FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND INDIAN RIVER COUNTY This Amendment to Agreement No. 19IR3, as previously amended, (Agreement) is made by and between the Department of Environmental Protection (Department), an agency of the State of Florida, and Indian River County, 1801 27"' Street, Building A, Vero Beach, Florida 32960 (Grantee), on the date last signed below. WHEREAS, the Department entered into the Agreement with the Grantee for the Vero Beach Restoration effective September 26, 2019; and WHEREAS, the Grantee has requested an update to the Grant Work Plan and the Department has agreed; and WHEREAS, the parties wish to amend the Agreement as set forth herein. NOW THEREFORE, the parties agree as follows: 1) Attachment 3-D, Fourth Revised Grant Work Plan, is hereby deleted in its entirety and replaced with Attachment 3-E, Fifth Revised Grant Work Plan, as attached to this Amendment and hereby incorporated into the Agreement. All references in the Agreement to Attachment 3-D shall hereinafter refer to Attachment 3-E, Fifth Revised Grant Work Plan. 2) All other terms and conditions of the Agreement remain in effect. If and to the extent that any inconsistencies may appear between the Agreement and this Amendment, the provisions of this Amendment shall control. The parties agree to the terms and conditions of this Amendment and have duly authorized their respective representatives to sign it on the dates indicated below. Indian River County By: Title: 6u,-4 /QX ­.v ,A,,A"Iohn Titkanich, Jr Florida Department of Environmental Proteetl061gltally signed by Alex Alex Reed Reed Date: 2026.03.24 By: 10:32:03 -04'00' Secretary or Designee Alex Reed, Director Office of Resilience and Coastal Protection Date: 4.."A l 3, &2 (" Date: 3/24/26 LIST OF ATTACHMENTS/EXHIBITS INCLUDED AS PART OF THIS AMENDMENT: Specify Type Letter/Number Description Attachment 3-E Fifth Revised Grant Work Plan (4 pages) APPROVED AS TO FORM -REMAINDER OF PAGE INTENTIONALLY LEFT BLANK - AND LEGAL SUFFICIENCY BY" NNIFIVR W. SHULER COUNTY ATTORNEY ORCP Additional Signatures Eric MassaDigitally signed by Eic Masa Date: 2026.03.2315:08:50 -04'00' DEP Grant Manager Digitally signed by Cameron Cameron Martinello Martinello Date: 2026.03.23 15:14:54 -04'00' DEP QC Reviewer Local Sponsor may add additional signatures if needed below. ATTACHMENT 3-E FIFTH REVISED GRANT WORK PLAN PROJECT TITLE: Vero Beach Restoration PROJECT LOCATION: The Project is located between Department of Environmental Protection (Department or DEP) reference monuments R70 and R86 along the Atlantic Ocean in Indian River County, Florida. PROJECT BACKGROUND: The Vero Beach Restoration Project consists of a restoration of 3.07 miles of critically eroded shoreline between DEP reference monuments R-70 and R-86 in Indian River County. The project was constructed in 2020 with appropriation from FEMA due to the impacts of Hurricanes Matthew, Irma, and Dorian. PROJECT DESCRIPTION: The Project consists of feasibility, design, and construction. PROJECT ELIGIBILITY: The Department has determined that 100 percent of the non-federal Project cost for Task 1 and 93.3 percent of the non-federal Project cost for Tasks 2 and 3 is eligible for state cost sharing. Therefore, the Department's financial obligation shall not exceed the sum of $1,748,751.00 for this Project or up to 50 percent of the non-federal Project cost for Task 1 and 46.65 percent of the non-federal Project cost for Tasks 2 and 3, if applicable, for the specific eligible Project items listed, whichever is less. Any indicated federal cost sharing percentage is an estimate and shall not affect the cost sharing percentages of the non-federal share. The parties agree that eligibility for cost sharing purposes will be maintained pursuant to 6213-36, Florida Administrative Code (F.A.C.). The Local Sponsor will be responsible for auditing all travel reimbursement expenses based on the travel limits established in section 112.061, Florida Statute (F.S.). Pursuant to sections 161.091 - 161.161, F.S., the Department provides financial assistance to eligible governmental entities for beach erosion control and inlet management activities under the Florida Beach Management Funding Assistance Program. Pursuant to 62B -36.005(1)(d), F.A.C., the Local Sponsor has resolved to support and serve as local sponsor, has demonstrated a financial commitment, and has demonstrated the ability to perform the tasks associated with the beach erosion control project as described herein. The Project shall be conducted in accordance with the terms and conditions set forth under this Agreement, all applicable Department permits and the eligible Project task items established below. All data collection and processing, and the resulting product deliverables, shall comply with the standards and technical specifications contained in the Department's Monitoring Standards for Beach Erosion Control Projects (2014) and all associated state and federal permits, unless otherwise specified in the approved scope of work for an eligible Project item. The monitoring standards may be found at: https:Hfloridaden gov/sites/default/files/PhysicalMonitoringStandards.pdf One (1) electronic copy of all written reports developed under this Agreement shall be forwarded to the Department, unless otherwise specified. DEP Agreement No. 191R3, Attachment 3-E, Page 1 of 4 Acronyms: DEP — Florida Department of Environmental Protection F.A.C. — Florida Administrative Code F.S. — Florida Statutes FDEM — Florida Department of Emergency Management FEMA — Federal Emergency Management Agency TASKS and DELIVERABLES: The Local Sponsor will provide detailed scopes of work or a letter requesting advance payment if authorized by Attachment 2, for all tasks identified below, which shall include a narrative description of work to be completed, a corresponding cost estimate and a proposed schedule of completion for the proposed work and associated deliverables. Each scope of work shall be approved in writing by the DEP Project Manager to be included into this work plan for reimbursement. Task 1: Feasibility Study Task Description: The Local Sponsor will acquire professional services for activities necessary to determine the feasibility of the proposed Project or Project -related improvements necessary to accomplish Department -approved goals and strategies. Deliverable: Certification of Completion including documentation of submittal affirming that the final feasibility report was completed and submitted to the Department. For interim payment requests, a Task Summary Report signed by the Local Sponsor must be submitted detailing work progress during the payment request period. The Task Summary Report must include the dates and descriptions of all activities, surveys and reports completed or in progress during the time period of the interim payment request. Performance Standard: The DEP Project Manager will review the task deliverable and any associated work products as necessary to verify they meet the specifications in the Grant Work Plan and this task description. Payment Request Schedule: Payment requests may be submitted after the deliverable is received and accepted and may be submitted no more frequently than quarterly. Task 2: Design and Permitting Task Description: The Local Sponsor will acquire professional services for the engineering and design of the Project such as coastal engineering analyses, preparation of plans and specifications, physical and environmental surveys, cultural resource surveys, design -level geotechnical services, sediment studies, inlet studies, environmental analyses, orthophotography, plan formulations and for obtaining environmental permits and other Project -related authorizations. The Local Sponsor will submit work products to the appropriate State or Federal regulatory agencies as requested by the DEP Project Manager in order to be eligible for reimbursement under this task. Deliverable: Certification of Completion including documentation of submittal affirming that the final design document was completed and submitted to the Department. For interim payment requests, a Task Summary Report signed by the Local Sponsor must be submitted detailing work progress during the payment request period. The Task Summary Report must include the dates and descriptions of all activities, surveys and reports completed or in progress during the time period of the interim payment request. DEP Agreement No. 19183, Attachment 3-E, Page 2 of 4 Performance Standard: The DEP Project Manager will review the task deliverable and any associated work products as necessary to verify they meet the specifications in the Grant Work Plan and this task description. Payment Request Schedule: Payment requests may be submitted after the deliverable is received and accepted and may be submitted no more frequently than quarterly. Task 3: Construction Task Description: This task includes work performed and costs incurred associated with the placement of fill material and/or the construction of erosion control structures within the Project area. Project costs associated with eligible beach and inlet construction activities include work approved through construction bids and/or construction -phase engineering and monitoring services contracts. Eligible costs may include mobilization, demobilization, construction observation or inspection services, physical and environmental surveys, beach fill, tilling and scarp removal, erosion control structures, mitigation reefs, dune stabilization measures and native beach -dune vegetation. Construction shall be conducted in accordance with any and all State or Federal permits. The Local Sponsor will submit work products to the appropriate State or Federal regulatory agencies as requested by the DEP Project Manager in order to be eligible for reimbursement under this task. Deliverable: Certification of Completion by a Florida -registered Professional Engineer with documentation of submittal to the Department affirming the construction task was completed in accordance with construction contract documents. For interim payment requests, a Task Summary Report signed by Local Sponsor must be submitted detailing activities completed during the payment request period. The Task Summary Report must include the dates and descriptions of all activities, surveys and reports completed or in progress during the time period of the interim payment request. Performance Standard: The DEP Project Manager will review the task deliverable and any associated work products as necessary to verify they meet the specifications in the Grant Work Plan and this task description. Payment Request Schedule: Payment requests may be submitted after the deliverable is received and accepted and may be submitted no more frequently than quarterly. Estimated Eligible Project Cost Note: The federal share includes FEMA and FDFM. DEP Agreement No. 19183, Attachment 3-E, Page 3 of 4 State Federal Task Eligible Project Tasks Cost Estimated DEP Local Total # Share Project Costs 1 IFeasibility Study 50.00% $7,038.01 $15,667.50 $15,667.49 $38,373.00 2 IDesign and Permitting 46.65% $243,408.42 $56,796.25 $64,953.50 $365,158.17 3.1 lConstruction 46.65% $3,495,973.55 $1,436,693.45 $1,643,035.27 $6,575,702.27 3.2 lConstruction (Non-federal) 46.65% $0.00 $239,593.80 $274,004.91 $513,598.71 TOTAL PROJECT COSTS 53,746,419.98 $1,748,751.00 $1,997,661.17 $7,492,832.15 Note: The federal share includes FEMA and FDFM. DEP Agreement No. 19183, Attachment 3-E, Page 3 of 4 PROJECT TIMELINE & BUDGET DETAIL: The tasks must be completed by, and all deliverables received by, the corresponding deliverable due date. TaskBudget No. Task Title Budget Category Amount Task Start Date Deliverable Due Date 1 Feasibility Study Contractual Services $15,667.50 01/01/2016 09/30/2026 2 Design and Permitting Contractual Services $56,796.25 01/01/2016 09/30/2026 3 Construction Contractual Services $1,676,287.25 1 01/01/2016 1 09/30/2026 Total: $ 1,748,751.00 Note that, per paragraph 8.j. of the agreement, authorization for continuation and completion of work and any associated payments may be rescinded, with proper notice, at the discretion of the Department if the Legislature reduces or eliminates appropriations. Extending the contract end date carries the risk that funds for this project may become unavailable in the future. This should be a consideration for the Local Sponsor with this and future requests for extension. DEP Agreement No. 19183, Attachment 3-E, Page 4 of 4