HomeMy WebLinkAbout2026-1033120260027982
RECORDED IN THE PUBLIC RECORDS OF
RYAN L. BUTLER, CLERK OF COURT
Project: Sebastian Highlands Unit 17 INDIAN RIVER COUNTY FL
UCP #3525 BK: 3866 PG 2286 Page 1 of 4 6/10/2026 3 21 PM
BILL OF SALE OF UTILITY FACILITIES
to
INDIAN RIVER COUNTY, FLORIDA
(UCP # 3525)
KNOW ALL MEN BY THESE PRESENTS, that Hawkins Project I, LLC, an Ohio limited
liability company authorized to do business in the State of Florida.. the mailing address of
which is 10100 INNOVATION DRIVE, STE 410, DAYTON, OH 45342, hereinafter called
GRANTOR, in consideration of value received, the receipt and sufficiency of which is hereby
acknowledged, has and does hereby grant, bargain, sell, transfer, and deliver unto INDIAN
RIVER COUNTY, a political subdivision of the State of Florida, whose address is 1801 27th
Street, Vero Beach, FL 32960, hereinafter called GRANTEE, this day of Tyyu_
2026.. the following goods and chattels:
EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF
which utility facilities are located within existing easements, streets and right-of-ways of
Sebastian Highlands Unit 17, as recorded in Plat Book 8, Page 46 of the Public Records of
Indian River County, Florida.
TO HAVE AND TO HOLD the same unto GRANTEE forever, and GRANTOR hereby warrants
to the GRANTEE that it has free and unencumbered title to the above-described facilities, that
all persons or entities which have supplied labor or materials with respect to these facilities have
been paid in full, that none of them has any claim whatsoever with respect thereto, and that the
GRANTOR has full authority to make this conveyance and will warrant and defend the sale of
said chattels and utility facilities hereby made unto GRANTEE against the lawful claims and
demands of all persons whomsoever.
GRANTOR hereby further warrants that should the above described utility facilities fail or
otherwise become defective during a period of one year from the date of acceptance of same by
GRANTEE (June 19, 2026 to June 19, 2027), due to defective materials or workmanship,
GRANTOR shall upon each occasion be responsible in all respects for such failure or defect
and shall correct same at GRANTOR's sole cost and without expense to GRANTEE upon
immediate notice by GRANTEE in view of the need for immediate response to correct broken
or defective utility lines and facilities. GRANTOR shall be solely liable and shall save
GRANTEE harmless from any direct or consequential damage attributable to such failure or
defect GRANTOR hereby also assigns all its right, title, and interest in and to manufacturer's or
supplier's warranties with respect to the described facilities.
APPR S FORM
AND LlIS F 'ENCY
(page one of two)
B � _
SAN J. PRADO
DEPUTY COUNTY ATTORNEY
IN WITNESS WHEREOF, the GRANTOR has herein set its hand and seal the day and year first
above written.
Signed, sealed and delivered in
the presence of:
Hawkins Project I, LLC,
an Ohio limited liability company
By: EBS Residential Development Fund III, LLC,
an Ohio Limited Liability Company
its Sole Manager
By: Eubel Brady & Suttman Asset Management, Inc.
a Delaware corporation
its manager
By: DDC Management LLC,
an Ohio limited liability company
its Authorized Signatory pursuant to that certain
Supplemental Project Management Agreement dated
Janua
Signature:
Printed Name' 00.rn,
Address: (on I la", a b a (� 6
Vln f rW-NkSVJ A 6/1(4L*W
Signature: QVII rTAI-
Printed Name: �_L - VUI
Address:
r
STATE OF V-\� v
COUNTY OF "
ry
22, 2020
By:
Jon an M. Bills
Mafiager of DDC Management LLC
Address: 3 (a (1 I R,� rnh") R C( W_0X'U
YV\ i (.Lm i n\a rn N-1 ClS 3 r i 2
The foregoing instrument was acknowledged before me, by means of \14 physical
presence or ❑ online notarization, this S day of 2026 by Jonathan M. Bills, as
Manager of DDC Management LLC, an Ohio limited liability company, acting as Authorized Signatory for
Hawkins Project I, LLC, an Ohio limited liability company, pursuant to that certain Supplemental Project
Management Agreement dated January 22, 2020, who executed on behalf of and with the authority of
said company. He is V personally known or ❑ produced identification in the form of
NOTARY PUBLIC:
JAMIE MELSON r
` ^ Notary Public
>o
State of Ohio
My Comm. Expires N tary Public Signature
[AFFIX (� AL]September 13, 2030 rint Notary Name: �
,Ckm MeV. a'l
Commission No.: i\J I R
My commission expi er s: CA -13 Z -Z30
(page two of two)
Mills, Short 8 Associates 04/28/2026
EXHIBIT "A"
Prepared By: Mills, Short & Associates, LLC.
Certified Cost Estimate - IRC Utility Department (Sewer System)
For: Sebastian Highlands - UCP # 3525 (Sewer & Water)
Total Amount= $1,355,563.90
Warranty Security Amount (25% of Total)= $338,890.98
I.R.C. .U.S.
Accepted
Insufficient
700 22nd Place, Suite 2C, Vero Beach, FL 32960
772.226.7282
Engineer's Cost Estimate
No.
Item
I Unit
Quantity I
Unit Price
Total
Sewer
1
4 -ft Dia. S.S MH (0'-6')
EA
10
$8,258.25
$82,582.50
2
4 -ft Dia. S.S MH (6'-8')
EA
4
$9,801.75
$39,207.00
3
4 -ft Dia. S.S MH (6'-8', Lined)
EA
1
$19,026.00
$19,026.00
4
4 -ft Dia. S.S MH (8'-10')
EA
3
$11,980.50
$35,941.50
5 1
14 -ft Dia. S.S MH (8'-10', Lined)
EA
1
$21,010.50
$21,010.50
6
5 -ft Dia. S.S. MH (10'-12', Lines)
EA
3
$28,455.00
$85,365.00
7
8" S.S. Pipe SDR26 (0'-6')
LF
1918
$54.87
$105,240.66
8
8" S.S. Pipe SDR26 (6'-8')
LF
431
$60.06
$25,885.86
9
8" S.S. Pipe SDR26 (8'-10')
LF
21
$73.71
$1,547.91
10
10" S.S. Pipe SDR26 (0'-6')
LF
262
$69.57
$18,227.34
11
10" S.S. Pipe SDR26 (6'-8')
LF
1248
$75.29
$93,961.92
12
10" S.S. Pipe SDR26 (8'-10')
LF
859
$83.69
$71,889.71
13
10" S.S. Pipe SDR26 (10'-12')
LF
410
$97.18
$39,843.80
14
S.S. Single Service
EA
15
$2,430.75
$36,461.25
15 1
IS.S. Double Service
EA
42
$2,341.50
$98,343.00
16
6" C-900 SFM
LF
1675
$36.33
$60,852.75
18
6" 45 Deg. Fittings
EA
4
$1,391.25
$5,565.00
18
6" 90 Deg. Fittings
EA
2
$1,391.25
$2,782.50
19
SFM 6" Gate Valve & Box
EA
1$2,787.75
$2,787.75
20
SFM Tapping Sleeve & Valve 6"x6"
EA
2
$6,489.00
$12,978.00
Total
$859,499.95
Water
21
6" PVC C-900 W.M.
LF
5340
$43.32
$231,328.80
22
6" Tee
EA
8
$945.00
$7,560.00
23
6" 45 Deg. Fittings
EA
10
$945.00
$9,450.00
24
6" Cross Fitting
EA
1
$945.00
$945.00
25 1
16" Gate Valve & Box
EA
11
$2,787.15
$30,658.65
26
Fire Hydrant Assembly
EA
6
$9,675.75
$58,054.50
27
Single Water Service
EA
3
$1,785.00
$5,355.00
28
Double Water Service
EA
48
$3,181.50
$152,712.00
Total
$496,063.95
Total Amount= $1,355,563.90
Warranty Security Amount (25% of Total)= $338,890.98
I.R.C. .U.S.
Accepted
Insufficient
700 22nd Place, Suite 2C, Vero Beach, FL 32960
772.226.7282
Mills, Short 8 Associates
I, James W. Mills, P.E. a Florida Engineering, License No. 74145, do hereby certify that this cost estimate has been
prepared under my responsible direction for the Water & Sewer System Improvements listed above and that the total
cost estimated for the Said Improvements is $1,355,563.90 This estimate has been prepared, in part, for estimating
the value of utilities to be dedicated to Indian River County Utility Department, installed in substantial conformance
with the approved Utility Construction Plans for the Sebastian Highlands project, dated and approved by the IRC
Utility Department on September 4, 2025 (UCP Permit No. 3525)
GEN
No. 45
S TE OF 4&,�\
per.
•, F' OR10, NG��
14,
700 22nd Place, Suite 2C, Vero Beach, FL 32960
772.226.7282
04/28/2026