WORK ORDER 2018006-22
This Work Order Number 22 is entered into as of this Lh day of At(�ust , 2026_.
pursuant to that certain Professional Services Agreement, dated January 9, 2018 (referred to as the
"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida
("COUNTY") and Aptim Environmental and Infrastructure. LLC ("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A
(Scope of Work), attached to this Work Order and made part hereof by this reference. The professional
services will be performed by the Consultant for the mutually agreed upon lump sum or maximum
amount not -to -exceed professional fee. Any additional costs must be approved in writing, and at a rate
not to exceed the prices set forth in Exhibit B of the Agreement (Rate Schedule) for RFQ 2018006, made
a part hereof by this reference. The Consultant will perform the professional services within the
timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and
made a part hereof by this reference all in accordance with the terms and provisions set forth in the
Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall
conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first
written above.
CONSULTANT: BOARD OF COUNTY COMMISSIONERS OF
INDIAN RIVER COUNTY:
By:'1�)L_, r/ J,/ *
Nam TJdt) [�] By: \_0'_&_ -
Title
S.. 4
: C—" Deryl Loar, Chairman
BCC A rov I D tree+: Agust4,2O 6
By: �/�fCcvrri
hn A. Ti anich, Jr. Count Administrator
Approved as to Foam and egal fficiency:
uler, County Attorney
Ryan L. Butler, Clerk of Court and Comptroller
Attest: 3 I
Deputy ICl rk
GL# 12814472-033490-05054
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
A
APTIM
Exhibit A
April 24, 2026
Quintin Bergman
Indian River County
Natural Resources Department — Coastal Division
1801 27th Street, Building A
Vero Beach, FL 32960
Subject: Indian River County, FL
Sector 3 - 2018006 — Work Order #22
Year 2 Physical Monitoring Report
Dear Quintin:
Aptim Environmental & Infrastructure, LLC
6401 Congress Avenue,
Suite 140 Boca Raton, FL
33487 Tel: +1 561 391 8102
Fax: +1 561 391 9116
www.aptim.com
This proposal outlines a scope of work for Aptim Environmental & Infrastructure, LLC (APTIM), to provide
professional services to Indian River County (the County) in support of the Sector 3 Beach and Dune
Renourishment Project. The scope of work described herein is to support the County for Year 2 physical
monitoring reporting, as required by project permits.
The tasks to perform this work are listed below and described on the following pages. A breakdown of the
hours and expenses to develop the cost is attached. The scope and fee proposal were developed
following the provisions of the Professional Services Agreement between Indian River County and APTIM,
(RFQ#2018006), dated January 9, 2018.
Scope of Work Year 2 Physical Monitoring Report
Volumetric and contour changes at the Sector 3 Beach will be calculated using surveys that were collected
at the FDEP R -monuments by the County's surveyor, Morgan & Eklund. APTIM will review the data to
ensure that it conforms to the standards required by the FDEP physical monitoring plan. APTIM will notify
the County of any issues with the survey data and will coordinate through the County or directly with the
surveyors to resolve any issues.
APTIM will develop an engineering report that discusses the performance of the beach fill project. Beach
contour changes will be evaluated to document changes at the shoreline and the dune. Volumetric
changes will be quantified above MHW (+0.6 ft NAVD) and above the depth of closure. All computations
and distinguished erosion and accretion patterns/trends will be summarized with tables and graphical
representations in addition to plots of the survey profiles.
In accordance with the JCP requirements, the report will specifically include the following:
1. A record of the volume and location of all beach fill material placed within the project area.
2. The volume and percentage of advance nourishment lost since the last beach nourishment project.
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
APTIM April 24, 2026
Page 2 of 4
3. The most recent MHW shoreline positions (feet) in comparison to the design profile at each
individual monument location.
4. The MHW shoreline position changes (feet) relative to the pre -construction survey at each
individual monument location for all the monitoring periods.
5. The measured remaining volume (cubic yards) at each design profile above the MHW line and
above the Depth of Closure for the entire project area over the successive monitoring periods.
6. Any other shoreline position and/or volumetric analysis the Engineer deems useful in assessing,
with quantitative measurements, the performance of the project.
Deliverable
A Year 2 post -construction monitoring assessment will be provided in report format for the Sector 3
project area. The report will summarize and discuss background information regarding the project,
survey datasets utilized, beach contour and volumetric changes, and overall project performance. The
report appendices will include the raw survey data and superimposed plots of the two most recent
beach profiles, the design template, and pre- and post -construction profiles.
Schedule
APTIM will provide the deliverable within 90 calendar days of receipt of the summer survey data. It is
assumed that the survey data provided by the County has been processed and is considered final.
Cost
The total lump sum cost to perform the proposed work described herein for — Work Order #22 is
$28,338.00. Please refer to Exhibit 1, attached, for a summary of the costs and labor hours of the Task.
APTIM will proceed with the task upon receipt of a signed work order from Indian River County (unless
stated otherwise in the schedule). It is noted that some aspects of this Work Order are dependent upon
the surveying consultant and are outside the control of APTIM and the County. As such, the scope,
schedule, and cost described herein is provided as an estimate. APTIM will strive to execute each phase
of the work within budget and in as expeditious a manner according to construction progress. We will
coordinate with the County in the event that the scope, schedule, or budget arise due to unforeseen
issues or circumstances.
Thank you for the opportunity to serve Indian River County. We look forward to continuing to
provide expert professional services to the County. Please do not hesitate to call if you have any
questions.
A APTIM
Sincerely,
mes E. Austin. P.E.
Coastal Engineering Project Manager
Aptim Environmental & Infrastructure, LLC
Douglas W. Mann, P.E., BC.CE.
Lead Coastal Engineer
APTIM Environmental & Infrastructure, LLC
A TRUE COPY
CERTIFICATION ON LAST PAGE
RYAN L. BUTLER, CLERK
April 24, 2026
Page 3 of 4
Client Authorized Signature
Printed Name
Title
STATE OF FLORIDA
INDIAN RIVER COUNTY
THIS IS TO CERTIFY THAT THIS IS A TRUE AND CORRECT
COPY OF THE ORIGINAL ON FILE IN THIS OFFICE.
BY `1 , RYYANN L. BUTLER, CLERK
_? __ D.C.
APTIM DATE og April 24, 2026
Page 4 of 4
EXHIBIT 1
Indian River County, FL
Sector 3 - 2018006 - Work Order #22
APTIM Year 2 Physical Monitoring Report
Summary of Cost by Task
Task Number
Task Nape
Labor
Subcontractors
I Equipment
Materials
Other ODCs
Mobilization/
Demob
Totals
Task 1
Physical Monitoring Report
IS 28,338.00
$
$
$
$
$
28,338.00
Totals =
S 28,338.00
3
$
I $
$
$
28,338.
Summary of Labor Hours and Cost
Labor Title
Labor Bill
Rate
Year 2 Physical
Monitoring Report
Totals
Task 1
Labor
Hours
Cost
Labor
Hours
Cost
Principal Engineer/Sr Proj Mngr
$ 250.00
12
$ 3,000.00
12
$ 3,000.00
Expert Witness (Testimony)
$ 300.00
3 -
S
Program Manager
$ 190.00
$ -
-
$ -
Sr Coastal En 'veer/Pro" Mn r
$ 165.00
24
$ 3960.0
24
S 3,960.00
Coastal Engineer III
$ 150.00
24
$ 3,600.0
24
$ 3,600.00
Coastal Engineer II
5125.0
74
$ 9,250.0
74
$ 9,250.00
Coastal Engineer I
$ 105.00
3
-
$ -
Coastal Modeler II
$130.00
3
-
S -
Coastal Modeler I
$110.0
3
-
S
Professional Surveyor & Mapper
$ 145.00
4
S 580.
4
$ 580.00
Hydrographer
$ 135.00
3 -
-
$ -
Surveyor
95.00
3
$
Survey Technician
80.00
3 -
-
S
Senior Marine Biologist
$ 135.00
8
S 1,080.0
8
$ 1,080.00
Marine Biologist II
95.00
$ -
i -
Marine Biologist I
72.00
3 -
-
$ -
Professional Geologist
$ 150.00
$ -
-
$ -
Geologist III
$ 130.00
$
$ -
Geologist II
95.00
$
-
-
Geologist I
80.00
$ -
$ -
Senior CAD Operator
$ 140.00
$ -
3
CAD Operator
$ 105.00
40
$ 4.200.00
40
$ 4,200.00
GIS Operator
$ 105.00
20
$1100.0
20
$ 2,100.00
Boat Captain
80 00
$ -
$ -
Bookkeeper
80,00
$ -
$ -
Clerical
71.00
8
$ 568.
8
$ 568.00
Technician
60.00
$ -
$ -
Subcontractors
-
3 -
-
$ -
Equipment
-
$
$ -
Materials
-
$ -
$ -
Other ODCs
-
S -
$ -
Mobilization/Demob
-
-
$ -
$ -
TOTAL
214
5 28,338.00
214
$ 28,338.00
SubnMled By'. James Austin
SutxritedTo: Indian River County, FL
Suhrission Date: 04/24/26