HomeMy WebLinkAbout2026-137IRC-2519 Roseland Road Bridge over Sebastian River Prong ENGINEERING SERVICES WORK ORDER 22 This Work Order Number 02 is entered into as of this day of August , 2026 pursuant to that certain Continuing Contract Agreement, dated May 2, 2023, ("Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Consor North America, Inc. ("Consultant") The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. The professional services will be performed by the Consultant for the mutually agreed upon lump sum or maximum amount not -to -exceed professional fee. Any additional costs must be approved in writing, and at a rate not to exceed the prices set forth in Exhibit B of the Agreement (Rate Schedule) for RFQ 2023015, made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Exhibit A (Time Schedule), attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT: CONSOR NORTH AMERICA, INC. By: Name: Srnlmf Gelltr Title: Psi I eck BOARD OF COUNTY COMMISSONERS OF-:'`f'45� INDIAN RIVER COUN -. / ion✓F ;' By: Deryl Loar, Chairman BCC Approval Date: Aiust 4, 4 L' ; rni;1 By:722/?et/' John A. Tit nick, Jr., County Administrator Approved as to Form and Legal Sufficiency: By: I r+' - SJt./ J nifer . Shuler, County Attorney Ryan L. Butler, Clerk of Court and Comptroller Attest: Deputy CI c (SEAL) consor July 21, 2026 Adam Heltemes, PE Roadway Production Manager Indian River County 1840 25", Street, Vero Beach, FL 32960 2041 Vista Parkway, Suite 101 West Palm Beach, FL 33411 561.253.9550 RE: CR-505/Roseland Road over Sebastian River Prong, Bridge No. 884019 Indian River County, Florida Dear Mr. Heltemes, Consor North America, Inc. (Consor) appreciates the opportunity to submit a fee proposal for the subject project. The purpose of the project is to replace the existing bridge along CR-505/Roseland Road over Sebastian River Prong, Bridge No. 884019, herein referred to as the PROJECT, for Indian River County, herein referred to as COUNTY. This fee proposal has been developed with the following assumptions: • All designs will comply with AASHTO LRFD (current edition), FDOT Structures Manual (current edition), Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways (known as the Florida Greenbook) (current edition). • Contract Plans will be prepared in accordance with the current FDOT Design Manual. • A full road closure with detour will be utilized during construction. Temporary Traffic Control (TTCP) Plans will not be designed or provided by Consor. • The COUNTY will perform any necessary Public Involvement, Survey/SUE and Geotechnical services for the project. • Phase submittals will include a bridge hydraulic analysis, 60% Submittal, 90% submittal and Final (digitally signed and sealed) submittal. • Permit fees have not been included in this fee proposal. All permit fees will be paid directly by the COUNTY. • Post design services and Construction Engineering Inspection (CEI) are not included in this scope and fee proposal. INDEX OF TASKS The following categories correspond to the estimate of work effort and staff hour fee sheet: Task 3 Project General Tasks Task 4 & 5 Roadway Analysis & Plans Task 6 Drainage Analysis and Plans Task 7 Utilities Task 8 Environmental Permits and Clearances Task 9, 10 & 12 Structures Summary, BDR and Short Span Concrete Task 19 Signing & Marking Analysis and Plans Task 36 Utility Work by Highway Contractor (UWHC) Task 99 Bid and Award Phase www.consoreng.com Page 2 TASK 3 PROJECT GENERAL TASKS This task includes the development of an estimated quantities report, contract maintenance, digital delivery, aeronautical evaluation and Prime Consultant Project Manager Meetings and Project Manager field review. The estimated design schedule is 12 months. Consor will schedule and facilitate in -person comment resolution meetings with the COUNTY at each phase submittal (preliminary bridge concept, 60%, 90%). At these meetings Consor will discuss the project, receive written comments from COUNTY personnel, respond to comments received and incorporate accepted responses to comments into the contract plans and documents. TASKS 4 & 5 ROADWAY ANALYSIS AND PLANS Consor will develop approach roadway plans to meet the new bridge structure. A vertical profile will be developed to meet minimum clearance requirements as determined in the bridge hydraulic analysis. Approaches will be reconstructed to meet the new bridge and to the length of the new guardrail at a minimum (approximately 250 feet on both ends). The existing horizontal alignment will be maintained. Additional Right -of -Way is not anticipated. The existing two-lane, two-way roadway configuration will be maintained. The shoulders will be transitioned to meet the new bridge typical section. The proposed design speed is anticipated to be 45 mph. A 10 -wide raised sidewalk/multiuse path is anticipated on both sides of the bridge. The contractor is expected to submit signed and sealed TTC Plans to be approved by the COUNTY Anticipated list of sheets for Roadway Plans: • Key Sheet • Signature Sheet • Typical Section Sheet • Typical Section Detail Sheet (as needed) • General Notes Sheet • Roadway Plan/Profile Sheets (11"x17") • Cross Section Sheets • Utility Adjustment Sheets • Signing and Pavement Marking Plan Sheets/Details An Engineer's Cost Estimate will be provided with the 60%, 90% and Final Submittals. TASKS 6 DRAINAGE ANALYSIS AND PLANS Consor will prepare a bridge hydraulic analysis to determine vertical clearance and scour requirements. The analysis will utilize the effective Flood Insurance Study (FIS) HEC-RAS model, to be provided by the County. The bridge limits of the FIS model will be updated per current survey information and utilized as the effective existing conditions model. A proposed model will be developed and utilized for comparison with existing conditions and verification of No -Rise in flood elevations. Water levels will be assessed for the 50 -year, 100 -year and 500 -year frequency. A required low member elevation will be determined. Scour estimates will be developed for the 100 -year and 500 -year frequencies to consider with foundation design. A memorandum will be prepared to summarize findings. A No -Rise certification will be required. The design will include a closed system of inlets and pipes to convey runoff from the bridge deck to the channel. www.consoreng.com Page 3 Anticipated list of sheets for Drainage Plans: • Drainage Map • Drainage Structures Sheets • Summary of Drainage Structures Sheet Drainage Deliverables will include: • Bridge Hydraulics Report • No -Rise Certification • Drainage Design Report (Brief) TASK 7 UTILITIES A preliminary Sunshine One Call 811 ticket and field investigation indicates the following utilities are present in the project corridor: FPL — Distribution FPL — Subaqueous Indian River Utilities AT&T Comcast Consor will contact utility owners, provide conflict matrix, schedule utility meetings and incorporate any required plan changes resulting from any conflicts and resolutions. TASK 8 ENVIRONMENTAL PERMITS AND CLEARANCES Consor will provide environmental permitting support for the proposed PROJECT, including a site inspection to verify existing site conditions, a desktop review of available environmental resources, and coordination with the COUNTY and regulatory agencies, as needed, to confirm applicable permitting requirements. The COUNTY has obtained an Environmental Resource Permit (ERP) exemption from the St. John's River Water Management District. Consor will prepare and submit the documentation necessary to support a U.S. Army Corps of Engineers Nationwide Permit Self -Certification and obtain U.S. Coast Guard Advance Approval for the proposed bridge. This scope includes one (1) submittal to each agency and one (1) response to Requests for Additional Information (RAls), if required. Agency review schedules are outside Consor's control. Regulatory application fees, if any, shall be paid directly by the COUNTY. Threatened and endangered species review shall be limited to a desktop evaluation and observations made during the site inspection to identify the potential presence of suitable habitat or other environmental conditions that may affect permitting. This scope excludes wetland delineations, formal threatened and endangered species surveys, Biological Assessments, formal agency consultations, cultural resource investigations, compensatory mitigation, permit modifications resulting from design changes after submittal, and construction -phase environmental compliance services. www.consoreng.com Page 4 TASK 9, 10 & 12 STRUCTURES SUMMARY, BDR AND SHORT SPAN CONCRETE At the request of the County, Consor will design a Florida -Slab Beam (FSB) superstructure. Span arrangement (single span or two -span) will be coordinated with hydraulic and roadway profile requirements. Foundation alternatives to be considered include prestressed concrete piles (smallest permitted based on loading and geotechnical requirements) and Geosynthetic Reinforced Soil (GRS) walls and abutments. The ability to implement GRS-IBS is dependent on bridge length and hydraulics. Consor will complete the design and construction plans for the chosen bridge type. A Load and Resistance Factor Rating (LRFR) package will be prepared and submitted with the 90% phase submittal. Consor will coordinate with FDOT to assign a new bridge number. The new bridge design will accommodate an allowance for future re -attachment of the existing watermain to the outside coping of the bridge. Anticipated list of sheets for Structure Plans: • Structures Key Sheet • Signature Sheet • General Notes • Plan and Elevation • Riprap Details • Report of Core Borings (provided by Geotechnical Engineer) • Bridge Hydraulic Recommendations Sheet (provided by Drainage Engineer) • Foundation Layout & Pile Data Table • End Bent Plan/Elevation & Details • Intermediate Bent Plan/Elevation & Details • Beam Layout • Bridge Typical Section • Superstructure Plan/Reinforcing Details • Beam Table/Detail Sheets • Finish Grade Sections/Elevations • Reinforcing Bar List • Load Rating Summary • Applicable FDOT Standard Plans TASK 19 & 20 SIGNING AND MARKING ANALYSIS/PLANS Consor will develop design, details and quantities associated with signing and pavement markings for this project. A No Passing Zone Study will not be required. This project will be striped so that passing is NOT allowed. The Signing and Pavement Marking Plans will be included in the Roadway Plan set. TASK 36 UTILITY WORK BY HIGHWAY CONTRACTOR (UWHC) Consor will provide design services to replace the existing potable water main along Roseland Road that is installed as an aerial crossing adjacent to existing bridge (Bridge No. 884019). See Holtz Consulting Engineers, Inc. proposal for complete scope and breakdown of the fees for this task. www.consoreng.com Page 5 TASK 99 BID AND AWARD PHASE Consor will attend the pre -bid meeting and answer any questions regarding the Construction Plans or technical aspects of bid documents during the bid process. The services described herein will be performed for a lump sum fee of $395,324.42. Please do not hesitate to contact me if you have any questions. Sincerely, Consor North America, Inc. Jaime R. Celler, PE, Principal Project Manager 561-253-9566 1 Jaime.Celler@consoreng.com www.consoreng.com Name of Project: oUnty: FPN: AP No.: ESTIMATE OF WORK EFFORT AND COST - PRIME CONSULTANT CR-505rRoseland Road over Sebastian River Prong (Brloge No. 884019) Bridge Replai,ement Indian River NIA NIA Consultant Name: Consor North Amenca, Inc Consultant No.: TBD Date: 7.2112026 Estimator- Cellar SfA1f CWaMoallon Total Staff Hours Flom Summary - Flrm' Chief E8BiRW Sealer IF Idespr Senior EnSlnuur Projaof Engineer Senior 0s gnsr Eaglnaarwg Intern CADD Technician !1111 CIr11- flpllohl Nall Clwa4 B4allan9 N11f Chad- fba0p110 BIan CWat- flratbn 11 st.R Closer leaden 12 SH By ActIvIty Salary Leal By Actin Average Rata Par Task $314.99 $27941 $23927 lISt.92 $125.75 $' st tl 11066 $0.00 $0.00 $0.00 $000 $000 Common and Pro.ct Genet Talks 140 0 90 0 38 0 7 0 0 0 0 0 0 140 $34,910 $249.31. Roadwe Anat.'s 237 12 47 43 84 47 24 0 0 0 0 0 0 237 $48,341 $20397 . Roauwav Plans 02 4 18 18 22 is 8 0 0 0 0 0 0 82 $16,773 $204.55 Drama a 1.707 55 292 14 28 71 42 56 71 0 0 0 0 0 0 282 $53.485 $18966 Drawe Plars N 4 9 22 13 17 21 0 0 0 0 0 0 86 $18.379 $190.45 U61Aes Be 0 6 13 17 17 13 0 0 0 0 0 0 06 $11.837 $179.34 . Lnvrovrwvta Penn0s.and Env. CWrarraa 82 0 20 0 0 0 a 82 0 0 0 0 0 82 $12,449 $151.82 Struc:rures-Msr T00050wg5NoomTeth 180 9 27 3 36 36 36 0 0 0 0 0 0 180 $35,030 $194.81 10. StrucWes - Bidg. Development Report 36 2 6 7 7 7 7 0 0 0 0 0 0 36 $7.100 $197.21 12 Slruchiree - Snrxt Span Concrete Bridr 500 25 75 100 100 100 100 0 0 0 0 0 0 500 $97.305 $194.61 19. S,grnng 8 Pavement Marslrg Anal sls 52 4 10 10 13 10 5 0 0 0 0 0 0 52 $10.814 $207.97 0. S n n d Pavci"art Mart, P'rs 26 1 5 5 7 5 3 C 0 0 0 0 0 26 $5252 $202.00 Total Staff Hours 1,769 75 347 323 366 311 295 62 0 0 0 0 0 1769 Total Staff Cost $23.624.25 $96.955 27 577 264.21 567.25552 $39.108 25 $3858600 56660,92 $0.00 $0.00 $000 $000 5000 1340874.42 $197.67 Survey Fled Days by Subronsultant 4 Person Crew ] Chad = $34967442 LARY RELATED COSTS $349,674.42 :VERHEAD $0.00 PERAT ING MARGIN 1' ,. $0.00 CCM (Faolibes Capital Cost Money) $0.00 XPENSSS I rr'' $000 rve Field - if by Prime) C 0-per5M Crew oay_s$O, - 'day .00 SUBTOTAL ESTIMATED FEE: $349,674.42 bconsultanl'. Holtz Conaulr E--. Ira $tt,`i.0 CC onsultant: Sub2 $030 6consullart: Sub 3 $0.00 BTOTAL ESTIMATED FEE: $36,324.42 GeoterMrnrttl Field end Lab TestIng $000 SUBTOTAL ESTIMATED FEE: $35,324.42 Corporal SCIyCe9 $0.00 RAND TOTAL ESTIMATED FEE: 5305,324.42 884019_ CR505OverStibaalan_SHE_NASTER_W Fm Shoo,. ornvr Pape 1 of 7 712/2026 9:11 AM Prolect Activity 3: General Tasks Estimator J. Cellar CR-505,Roseland Road over Sebastian River Prong (Bridge No. 884019) Bridge Replacement Representing Print Narita Signature I Dab FOOT District Consultant Name NOTE: Signature Block Is optional, per District preference li Task Unit No of Unit Hou sl Unit FTto11 l Comment 3.1 Public Involvement Assume Indian River County will handle 3.1.1 Community Awareness Plan LS 1 0 0 NIA 3.1.2 Notifications LS 1 0 0 NIA 31.3 Preparing Mailing Lists LS 1 0 0 N/A 3.1.4 Median Modification Letters LS 1 0 0 N/A 3.1.5 Driveway Modification Letters LS 1 0 0 N/A 3.1.6 Newsletters LS 1 0 0 N/A 3.1.7 Renderings and Fly Throughs LS 1 0 0 N/A 3.1.8 PowerPoint Presentation LS 1 0 0 N/A 3.1.9 Public Meeting Preparations LS 1 0 0 N/A 3.1.10 Public Meeting Attendance+Followup LS 1 0 0 N/A 3.1.11 Other Agency Meetings LS 1 0 0 NIA 3.1.12 Web Site LS 1 0 0 N/A 3.1 Public Involvement Subtotal 0 3.2 Joint Project Agreements EA 0 0 0 N/A 3.3 Specifications & Estimates 33.1 Specifications Package Preparation LS 1 0 0 N/A 33.2 Estimated Quantities Report Preparation Report t Calculated Hours 26 211 Assume Roadway, Draina ge. age. S3PM. Structures. UWHC Components 5 3.4 Contract Maintenance and Project Documentation LS 1 52 52 16 hours for initial setup + assume 3 hours per month for 12 months 3.5 Value Engineering (Multi -Discipline Team) Review LS 1 0 0 N/A 3.6 Prime Consultant Project Manager Meetings LS 1 28 28 See listing below 3.7 Plans Update LS 1 0 0 N/A 684019_CR505OverSebaatian_SHE_MASTER_v3 3 Project General Tasks Page 20127 7/7/2026 Project Activity 3. General Tasks Task k N3.8 Task Units No of Units Hours! Unit Total l Comments Post Design Services LS 1 0 To be negotiated under a new Task at completion of design 3.9 Digital Delivery LS 1 10 18 6 hours setup + 3hours x4 EOR's (Roadway, Drainage, Structures, UWHC) 3.10 Risk Assessment Workshop LS 1 0 0 N/A 3.11 Railroad, Transit. and/or Airport Coordination LS 1 0 0 NIA 3.11.1 Aeronautical Evaluation Landscape and Existing Vegetation Coordination LS 1 16 16 N/A 3.12 LS 1 0 0 3.13 Other Project General Tasks LS 1 0 0 N/A 3. Project Common and Project General Tasks Total 140 3.6- List of Project Manager Meetings Units No of Units Hours/ Unit Total Hours Comments Roadway Analysis EA 1 2 2 •�i��;d Drainage EA 0 0 0 Selective C&G EA 0 0 0 Virtual Utilities EA 1 2 2 Environmental EA 0 0 0 Structures EA 0 0 0 Signing & Pavement Marking EA 0 0 0 Sgnalization EA 0 0 0 Lighting EA 0 0 0 Landscape Architecture EA 0 0 0 Survey EA 0 0 0 Photogrammetry EA 0 0 0 ROW & Mapping EA 0 0 0 Terrestrial Mobile LiDAR EA 0 0 0 Architecture EA 0 0 0 Noise Barriers EA 0 0 0 ITS Analysis EA 0 0 0 Geolechnical EA 0 0 0 Progress Meetings EA 0 0 0 Phase Reviews EA 3 6 18 Assume three Phase Review Meetings (preliminary bridge concept. 60%, 90%I Field Reviews EA 1 6 6 Assume one PM Field Review 884019_CR505OverSebastian_SHE_MASTER_v3 3. Project General Tasks Page 3 of 27 7/7/2026 Project Activity 3: General Tasks Tasko Task Units No of Units Hours/ Unit Total Hours Total Project Manager Meetings 6 28 Total PM Meeting Hours carries to Task 3.6 above Notes. I If the hours per meeting vary in length (hours) enter the average in the hourtunit column. 2. Do not double count agency meetings between permitting agencies. 3. Project manager meetings are calculated in each discipline sheet and brought forward to Column D. K8e019 C45i]5OverSe:asta^ SH_- MASILR v3 3 P ,:.e'I :Jrnm Tasty acr 4 v` ? Representing Print Name Signature I Date FOOT District Consultant Name j I.r Teek Project Parameter Staff Hours Documentation No. Task Description Units Complexity Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours What Is the overall project complexity? (See Roadway Guidelines Mid Cover 0 .. .. n enn.tme no ryprel sactbn nnckute recurred Typical 0 2.Lane FS 0 0 n 0 4 1 Typical Seebon Package 8 Ramps T I ypIca 0 2- C a 0 0 0 0 Muttt-U-La na FS T l yPtca 0 L wr Earneer a 0 0 0 N/A d MusllanC 42 Pavement Type Selection Report Report 0 Mandrd 0 0 0 0 WA Report a Assam 0 Lew 0 0 0 o WA 4 3 Pavement Design Package Pavt Designs 0 TrsvelAux. Lanes 0 0 0 0 Prnv nM cy l-rrc r Rver C.rri:'rry Pavt Designs 0 other R pills A 0 0 0 0 Promaxl uy hiurar '0 our CO1 rty W'A X -Skins 0.00 Undivided Roadway 0 0 0 0 4.4 Cross Slow Analysis (lanes arid shoulders) X -Slope AaaessmeM 0.00 DMded Roadway 0 0 0 0 WA Cwnn 0 0 0 0 0 WA 0 0 0 0 0 WA 45 Safety Analysis Crash Anayos 0 0 0 0 0 WA Monitd Exist. 1 Mid 0 0 6 0 45 Design Analysis Structures Accs Mane t 0.00 Mid 0 0 0 0 WA Roundabout 0 1x1 Rou debout 0 0 0 0 N/A 47 Operabonal Analyse Roundabout 0 1x2 Roundabout 0 0 0 0 WA Rouridabout 0 2x2 Roundabout 0 0 0 0 WA RRR 0 0 0 0 0 N/A 40 Design Reports Other Reports 0 0 0 0 WA VariationT Memo 0 0 0 0 0 WA 49 Design Variations and E...ptbns F 11 0 0 0 0 0 WA Design 0 0 0 0 0 WA 4 1D Mastr Design Fite Setup d Marnlwance, Model LS 1 IMd b 0 JO 0 Alan Ran Mainline 0.16 Mid 35 0 35 0 Horizotntal .Vertical Master Design Files SId. Road a 0.05 Mid 11 0 11 0 Frontage Road 0.00 Mid 0 0 0 0 WA 411 Mallme 0.16 MM 18 0 is 0 So. Road a 0.05 Mid 0 0 6 0 30 Modeling Develdaners �rrpa Frontage Road 0.00 Mid 0 0 0 0 WA AUG F/lee 0 Mid 0 0 0 0 N/A TTCP Malysia LS 0 Low 0 0 0 0 4 12 TTCP Master Desgn Fiks Lengal IPh...Mdas) 0.00 MM 0 0 0 0 WA P.d. tnan 0 0 0 0 0 WA TTCP 30 Modd.ng (isolated Locations) Locatate 0 0 0 0 0 WA 4.13 Utrhly Data Cdbclbn 8 Analysis LS 1 MM 12 0 12 0 analyze and coordinate utddy data 4 l4 Roadway Ouanetw for LO Report La. gltt (Rules) 0.10 MM 2 0 2 0 I 0 0 40 0 0 0 34 0 0 WA Valideaon 1 Olld TTCP Quaraieas 1w EQ Reood Map Phases 0 lifend�d 0 0 0 0 WA 4.15 Cost Esllrnale Engineer Estimate 3 Mb 36 0 30 0 assume 3 sutaniltals (60%. 90%. Final) LRE Updates 0 MM 0 0 0 0 WA 4.16 Tactical or Mod(ied Speed Provrsons TSPs d MSPs 0 0 0 0 0 WA 4.11 Other Roadway Tasks O&W Mel ysd< 0 1s 0 &d and Award Prune Services Raadtwy Analysis TaaMd9M 2N 0 206 0 4.10 Qud4y Assurance/Qual(y Conlyd LS 1 5% 11 C 11 0 4.19 Supen+sion LS 1 1 5% 11 0 11 0 420 Roadway Meetings (listed below) Meetings 2 0 2 0 Travel Time 0 0 0 0 4 21 Field Rewews ;hslnd maw, LS 0 0 Roadway Analysis Non -Technical Subtotal 24 0 24 0 422 coordinator LS 1 - .. 0 4. Roadway Analysis Tota 239 0 237 0 Tochnkal MSO11ngs a Meetings Travel Time 0 Meetings Desi ner Hours PM Documentation Typical Section vitiva.. Pavenwrt Dssgn Aces Managamrd r Drneweys 0 15% Line and Grade 0 C RRR I ECAR Readulgn 0 0 0 Local Governments (dtree, ooumles, MPO) 0 C 0 Work Zone Tragic. Contrd 0 C 0 3001)00% Commem Review Meetings C C 0 Uti/ty Coord-nation other Meetings 0 C Subtotal Technical Me.tings 1 0 1 Pnrgress Mwmngs IA reo.n'e^ ^.y FR ^ I 0 Purse Rev ew Meet rgs Total Roadway Meetings I 0 Field Reviews 0 of Staff SiteTi.. TravosTime r staff) Total Hours F ,old Review ✓r1 Feld Renew 42 L 0 Fend Review 113 0 0 0 0 Fold Renew 04 0 0 0 0 Rana -n -nand Field Revlaw 0 0 0 0 Total PWW ROnMw How 0 Representing Print Name Slgnatrae l Dab FCC - -�: s trict —_—� Consultant Norm Talk Project Parameter Staff Hours Documentation No Task Description Units Complexity Calculated Department Consultant Negotiated Provide documentation when negotialod hours differ from the calculated hours. What is the overall project complexity? (See Roadway Guidelines) Idn Key Sheet a i 0 Signature Sheet 2 0 2 0 Typical Sections 2 6 • 8 0 wl CADO Typcal Sections 0 0 0 0 0 NA 52 Typcal Section. Sheets wro CARD Partial Sections 2 6 0 6 0 Oss,,o shod aeC0Vemeflt card gucrcCO I cetn I assume rw cross slope corrector neocen 5.3 Cross Sine Correction Detals pay ntt 0 0 0 0 0 5.4 General Notesmay Item Notes 1 a0gls 6 0 6 0 Model Manegomeet 0 0 0 0 0 WA 5.5 project Layout 0 0 0 0 0 aesuns no cross slope correction needed Sheet(s) 0 rid 0 0 0 0 WA 5.6 Plnn View (Plan Sheds) Interchange 0 0 0 0 0 WA Roundabout 0 0 0 0 0 WA Sheet(s) 3 Flush Shoultler 9 0 9 0 5.7 Prone Vew /P ne Pvtile Sheets) Sheet(s) • Curbed 0 0 0 0 0oewey Curb RMpm 0 C 0 e 0 WA 5.6 Specwl ProNets Intersection RR Xr B 0 0 0 0 NIA 5.9 Sldewsee Profiles SreaRs) 0 0 0 0 0 NIA Starxlerd 0 0 0 0 0 NIA 5.f0 Interchange Layout Sheet Interchange 2 Lewes Complex 0 0 0 0 0 N/A 3- Lavats Ramp Tarmmal 0 0 0 0 0 N,A 6.11 Detni�s Intersection 0 - 0 • 0 0 NA a 10 0 Assume 1 saeoa. ceta Spada 1 90 5.12 Sal Survey Sheets 0 0 0 0 0 NA 5.13 Cross Seapns 30 1/0 11 0 11 0 TTC Notes 0 0 0 0 0 WA - TTCP pan to be provided by contractor presng rides 0 Tynlrals Sfxxt(s) 0 0 0 0 • WA - TTCP pan N/be provided by contractor 6.14 Temporary Traffic Control Plan TTC Plan 0 Id 0 0 0 0 WA - TTCP plan lobe porn/den by cnntactcr Sheol sl cnbcal croca Sactwns 0 0 o e 0 WA - TTCP Wan lobe porldad by mnbaclar TTc Deto to 0 0 0 0 0 N/A- TTCP Wan lobe ponidea by contnacror 515 Ubiny Adluatment Sheets Slyd(s) 3 OY>•a " 18 0 /0 0 Assume 5 UAO. (SUndwd Co npl-ty) 5.10 Prgect Control Sheets I): ) l S(): 0 0 0 0 0 s 17 a D 0 0 Roadway Plans Technical 040UO luM080if 74 0 74 0 5 10 QUeiity Asst. ranre:Qsohly CorIrn 5% 1 0 '. 0 5.19 Suo—spr 1 Roadway Pt.nsTotall 82 0 82 0 Representing Print Name Signature Date FOOT District Consultant Name Tusk NoTask Project Parameter Staff Hours Documentation -------------------- __.. __ Description Unl Compie.ny Calculated DapartmMtt Consultant I Negotiated Provide documentation when negotiated hours differ from the calculated hours 6a ? Base Clearance Analysis Lrx;alxa» 0 (1 0 0 0 N:A Report 0 0 0 - 0 0 NiA 6a 2 Hydroplaning Analysis LS 0 0 0 0 0 WA 6a 3 Existing Permit Analysis LS 1 Simple 4 0 4 0 6a 4 Utla[y Conflict Matrix (for drainage structures) LS 1 Simple 4 0 4 0 6a 5 Noise Barrier Drainage Analysis Wall Lergtn (Miles) 0.00 0 0 0 0 WA 68 6 Temporary Drainage Analysis LS I Simple 4 0 4 0 ha Pond Siting Analysis and Report Basins 0 0 0 0 0 WA Report 0 0 0 0 0 NIA he 8 Analysis of Pipe Video Inspection Report LS 0 0 0 0 0 WA Bridge Hydraulic Report [Canal Crossing or Pod Bridge) Pea Bring or 0 0 0 0 0 NA 6a9 Bridge Hydraulic Report (Main Bridge Non -Tidal) wio Relief B' 1 Sanded 200 0 120 0 With Ralrol Brl 0 0 0 0 0 NA NoRne 1 80 0 40 0 Bridge Hydraulic Report (Main Bridge Tidal) w:o Relief Br 0 !landed 0 0 0 0 WA Bh Relief 0 0 0 0 0 NA No -Rise 0 0 0 0 0 N/A Wave Modeling Wave Modeling 0 Standard 0 0 0 0 N/A 6a 10 Design of Minor Cross Drams Cross Drains 0 Simple 0 0 0 0 N/A 0 Standard 0 0 0 0 WA 0 Complex 0 0 0 0 NIA Design of Mapr Cross Drams Cross Drains 0 Simple 0 0 0 0 N/A 0 Standard 0 0 0 0 WA 0 Complex 0 0 0 0 N/A 6a 1 1 Design of Ditches aril Side Dorms Ditches (Mss) 0.00 Simple 0 0 0 0 WA 0.00 Standard 0 0 0 0 WA 0.00 Complex 0 0 0 0 N/A Side Drains 0 0 0 0 0 N/A N CM = , 0 : = R = _ = 0 , , = , = a - , _ _ § : R = = - :- >-- { ) { ' ® &!%|&; & ( t - } § } } \ } / { { _ ! $ 7 3 = - - _ & } } \ \ } \ \ \ ( {, �� }« cc i # \ jl2j§§� Subtotal Technical Meotings 0 0 Progress Meetings fA required by FOOT ; I Phes. Rever' Mewing. Total Drainage Meetings 0 0 01 Field Reviews # of Stall Site Time Travel Time Total Hours (per staff) (per stall F leld Review#t C Field Review#2 Field Review#3 G Field Review Y4 fv. Plars-in-Hard Field Revie I Total Field Review Hours 0 6b. Drainage Plans Ieuc a i1 T1T1iE[.ij Representing Print Name Signature! Date FOOT District Consultant Name r r Task Project Parameter Staff Hours Documentation Took Description --- Units Complexity j Calculated Department Consultant Negotiated Provide documentation when eegm and hours differ from the calculated hours No. 65' (Drainage Map (Including ln;erchanges) Shoes. -. 32 a 16 0 6b.2 Bridge Hydraulics Recommendation Sheets Bridges 32 31 0 - 0 Drainage 12 0 3U 0 fib 3 Drainage Structures Structures Details 0 0 0 0 N -A n 0 , scar^ 0 0 0 0 NA Ditches 0 Comp xe. u 0 0 0 NIA 654 Lat.M Dltclus Cruss Section 0 `:;. 0 0 0 NiA Alignments - 0 Standard i.-- 0 0 0 NiA Pond, 0 Complex ________ 0 0 0 0 _____________________________________________________________________ N/A 6b.S Retention+Detwmor^. Floodplam Compensation Ponds Cross Section 0 0 0 0 0 N -A All nmeMs Drainage Plans Technical Subtotal 95 0 78 0 6b.6 Ouelity Assurance+ouality Control % • 5% 5 0 e 0 6b.7 Supervision % 5% 5 0 4 0 Drainage Plans Total 105 0 00 0 084019_ CR5050vemSebaelan_SHE MASTER v3 6o Druirage Plain Page 12 01 21 1l1.2'J2b Project Activity 7: Utilities Estimator ,i. Cellar CR-505/Roseland Road over Sebastian River Prong (Bridge No. 884019) Bridge Replacement Representing Print Name Signature / Date FDOT District Consultant Name NOTE: Signature Block is optional, per District preference Task No. Task Units No of Units Hoursl Unit Total Hours Comments 7.1 Utility Kickoff Meeting LS 1 6 6 Meeting is listed below 7.2 Identify Existing Utility Agency Owner(s) LS 1 1 L 10 5 UAO .2 hrs Consultant shall contact Sunshine 811, perform a field visit, and review prior FDOT utility permits, reports, existing plans, and surveys provided. 7.3 Make Utility Contacts LS 1 15 15 (FPL - Distribution, FPL - Subaqueous, Indian River County Utilities, ATT, & Comcast) 3 contacts ' 5 utilities 7.4 Exception Processing LS 1 0 0 7.5 Preliminary Utility Meeting LS 1 0 0 Meeting is listed below 7.6 Individual/Field Meetings LS 1 0 0 Meetings are listed below 7.7 Collect and Review Plans and Data from UAO(s) LS 1 10 5 UAO ` 2 hrs per markup 7.8 Subordination of Easements Coordination LS 1 0 0 N/A 7.9 Utility Design Meeting LS 1 0 0 Meeting is listed below 7 10 Review Utility Markups & Work Schedules, and Processing of Schedules & Agreements LS 1 G 0 N/A 7.11 Utility Coordination/Followup LS 1 10 10 5 UAO .2 hrs 7.12 Utility Constructability Review LS 1 0 0 N/A 7.13 Additional Utility Services LS 1 0 0 N/A 7.14 Processing Utility Work by Highway Contractor (UWHC) LS 1 0 0 7.15 Contract Plans to UAO(s) LS 1 5 5 5 UAO 7.16 Certification/Close-Out LS 1 10 10 5 UAO * 2 hrs 884019_CR505OverSebastianSHE MASTER_v3 7. Utilities Page 13 ,if 27 7'712026 Protect Activity 7: Utilities 7 17 Other Utilities LS 7. Utilities Total 66 Technical Meetings Units No of Units Hours/ Unit Total Hours Comments PM Attendance at Meeting Required? Number Kickoff (see 7.t) EA 1 6 6 2 attendees' (meeting prep 1 hr + 1 hr meeting minutes +t Pc hour meeting) Preliminary Meeting (see 7.5) EA 0 0 0 0 Individual UAO Meetings (see 7.6) EA 0 0 0 0 Field Meetings (see 7.6) EA 0 0 0 0 Design Meeting (see 7.9) EA 0 0 0 0 Other Meetings (this is automatically added into Utilities Total EA 0 0 0 0 (cell F27)) Total Meetings 6 Total Project Manager Meetings (carries to Tab 3) 1 wt 884019_CR505OverSebastlan_SHE_MASTER_v3 7, Utilities P,3ge ', 6 nr 27 7/7/2026 Estimator: J. Barkley CR-505/Roseland Road over Sebastian River Prong (Bridge No. 884019) Bridge Replacement Representing Print Name Signature I Date FDOT District Consultant Name NOTE: Signature Block is optional, per District preference Task Task Units No. of Hours/ Total Comments No. Units Units Hours Environmental Permits and Environmental Clearances 8.1 Preliminary Project Research LS 1 /1 8 Desktop review Permits 8.2 Field Work 8.2.1 Pond Site Alternatives per pond site 0 0 0 N/A 8.2.2 Establish Wetland Jurisdictional Lines and LS 1 20 20 Travel to/from site, assess conditions Assessments 8.2.3 Species Surveys LS 1 4 4 Conduct bridge bat survey, confirm presence/absence species/habitat 8.3 Agency Verification of Wetland Data LS 1 0 0 N/A 8.4 Complete And Submit All Required Permit Applications 8 4 1 Complete and Submit All Required Wetland Permit Applications LS 1 12 12 Prepare self -certification package Pa p ge and submit in USACE RRS 8 4 2 Complete and Submit All Required Species Permit LS 1 0 0 N/A Applications 8.5 Coordinate and Review Dredge and Fill Sketches LS 1 0 0 N/A 8.6 Complete and Submit Documentation for Coordination and/or USCG Bridge Permit Application B 6 1 Prepare and submit required documents for USCG LS 1 16 16 Prepare documentation for request of USCG Advanced Approval P coordination 8.6.2 Complete and submit USCG Bridge Application LS 1 0 0 N/A Prepare Water Management District or Local Water 8.7 Control District Right of Way Occupancy Permit LS 1 0 0 N/A Application 8 8 Prepare Coastal Construction Control Line (CCCL) LS 1 0 0 N/A Permit Application 88401 9CR505overSebastian_SHE_MASTER_v3 8. Env. Permits and Clearances Page 15 of 27 7,7/2026 Task No. Task Units No. of Units Hoursl Units Total Hours Comments 89 Prepare USACE Section 408 Application to After a Civil Works Project LS 1 0 0 N/A 8.10 Compensatory Mitigation Plan LS 1 0 0 N/A 8.11 Mitigation Coordination and Meetings LS 1 0 0 N/A 8.12 Regulatory Agency Support LS 1 2 2 Coordination/RAI support 8.13 Other Environmental Permits LS 1 0 0 N/A Environmental Clearances, Reevaluations, and Technical Support 8 14 Technical support to the Department for Environmental Clearances and Reevaluations (use when consultant provides technical support only) 8.14.1 NEPA or SEIR Reevaluation LS 1 0 0 N/A 8.14.2 Archaeological and Historical Resources LS 1 0 0 N/A 8.14.3 Section 4(f), 6(f), and ARC LS 1 0 0 N/A 8.14.4 Wetland Impact Analysis LS 1 8 8 Complete Environmental Report to support self -certification permit 8.14.5 Essential Fish Habitat Impact Analysis LS 1 1 1 Complete Environmental Report to support self -certification permit 8.14.6 Protected Species and Habitat Impact Analysis LS 1 1 1 Complete Environmental Report to support self -certification permit 8 15 Preparation of Environmental Clearances and Reevaluations (use when consultant prepares all documents associated with reevaluation) 8.15.1 NEPA or SEIR Reevaluation LS 1 0 0 N/A 8.15.2 Archaeological and Historical Resources LS 1 0 0 N/A 8.15.3 Section 4(f). 6(f), and ARC LS 1 0 0 N/A 8.15.4 Wetland Impact Analysis LS 1 0 0 N/A 8.15.5 Essential Fish Habitat Impact Analysis LS 1 0 0 N/A 8,15.6 Protected Species and Habitat Impact Analysis LS 1 0 0 N/A Contamination Analysis 8.16 Contamination Impact Analysis LS 1 0 0 N/A 8.17 Asbestos Survey LS 1 0 0 N/A 884019 CR505OverSebastian_SHE_MASTER_v3 8. Env. Permits and Clearances Page 16 of 27 717/2026 Project Activity 8: Environmental Permits Task No. Task Units No. of Units Hours/ Units Total Hours Comments Environmental Permits and Environmental Clearances/Reevaluations Technical Subtotal 72 8.18 Technical Meetings LS 1 0 0 8.19 Quality Assurance/Quality Control LS % 5% 4 8.20 Supervision LS % 5" 4 Environmental Permits and Environmental Clearances Nontechnical Subtotal 8.21 Coordination LS 35, 8 2 8. Environmental Permits and Environmental Clearances Total 82 Technical Meetings Units No of Units Hours/ Unit Total Hours PM Attendance at Comments Meeting Required? Number WMD EA 0 0 0 0 NMFS EA 0 0 0 0 USACE EA 0 0 0 0 USCG EA 0 0 0 0 USFWS EA 0 0 0 0 FFWCC EA 0 0 0 0 FOOT EA 0 0 0 0 Other Meetings EA 0 0 0 0 Subtotal Technical Meetings 0 Subtotal Project Manager Meetings f1 Progress Meetings (if required by FOOT) EA 0 0 0 PM attendance of Progress Meetings is manually entered on General Task 3 - Phase Review Meetings EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 - - Total Meetings 0 Total Project Manager Meetings (carries to Tab 3) 0 Carries to 9 18 Comes to Tab 3 884019 CR505OverSebastian_SHE_MASTERv3 8. Env. Permits and Clearances Page 17 of 27 7)7/2026 Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings Fstiriato, L aowel' CR-5051Roseland Road over Sebastian River Prong (Bridge No. 884019) Bridge Replacement Representing Print Name Signature ! Date FDOT District ^sjltant Name rvuic. argnarure tlrocs rs oprronar, per ursrucr prererence Nok Task Units Design and Production Staffhours Comments No. of Units Hours per Unit No. of Sheets Total General Drawings 9.1 Key Sheet and Index of Drawings Sheet 1 4 1 4 Low range, single bridge 9.2 Project Layout Sheet 0 0 0 0 N/A 9.3 General Notes and Bid Rem Notes Sheet 1 12 1 12 Low range, simple bridge 9.4 Miscellaneous Common Details Sheet 2 6 2 12 Load Rating Summary sheet & Signature sheet 9.5 Incorporate Report of Core Borings Sheet 2 0.5 2 1 Single Bridge 9.6 Standard Plans- Bridges LS 1 2 2 9.7 Existing Bridge Plans LS 1 0 0 If available 9.8 Structures Quantites for EQ Report Bridges 1 Calculated Hours 16 16 Wails 0 Box Culverts 0 9-9 Cost Estimate LS 1 Fi 8 Assume 2 updates as needed 9.10' Technical Special Provisions and Modified Special Provisions LS 1 0 Structures - Summary and Miscellaneous Tasks and Drawings 6 55 Task No. Task Total Task 10 Task 11 Task 12 Task 13 Task 14 Task 15 Task 16 Task 17 Task 18 10-16 Bridge 1 536 36 0 500 0 0 0 0 10-16 Bridge 2 0 10-16 Bridge 3 0 884019_CR 5050verSebastian_SHE_ MASTE R_v3 9. Structures Summary Page 18 of 27 7172026 Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings 10-16 Bridge 4 0 10-16 Bridge 5 0 10-16 Bridge 6 0 10-16 Bridge 7 0 10-16 Bridge 8 0 10-16 Bridge 9 0 10-16 Bridge 10 0 17 Retaining Walls 0 0 18 Miscellaneous Structures 0 0 Structures Technical Subtotal 536 36 0 500 0 0 0 0 0 0 Task No.Unit Task Units No. UnitsHours of per Total Comments 9.11 Field Reviews LS 1 8 90% Plans in hand field review 9.12 Technical Meetings LS 1 8 8 Meetings are listed below 9.13 Quality Assurance/Quality Control LS o 10% 59 9.14 Independent Peer Review LS 1 0 0 9-15 Supervision LS 5% 30 Structures Nontechnical Subtotal 105 9.16 Coordination 1 20 Cooridnation with other disciplines, geotechnical engineer, Hydraulic Engineer 9. Structures - Summary and Miscellaneous Tasks and Drawin s Technical Meetings Units No of Units Hours/ Unit Total Hours Comments PM Attendance at Meeting Required? Number BDR CoordinationiReview EA 1 2 2 Virtual Attendcnce 0 90/100% Comment Review EA 1 2 2 Virtual Atlendence 0 Aesthetics Coordination EA 0 0 0 0 Regulatory Agency EA 0 0 0 0 Local Governments (cities, counties) EA 0 0 0 0 884019_CR505OverSebastian_SHE_MASTE R_v3 9. Structures Summary Page 19 of 27 7/712026 Project Activity 9: Structures Summary and Miscellaneous Tasks and Drawings Utility Companies EA 2 2 Virtual Attendcncc U Other Meetings EA i 0 0 0 Subtotal Technical Meetings 6 I 0 Progress Meetings {if required by FDOT) EA U 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 - Phase Review Meetings EA 2 2 PM attendance at Phase Review Meetings is manually entered on General Task 3 - - Total Meetings 8 Total Project Manager Meetings (carries to Tab 3)j 0 { amc. Ic v. I: ( arte> a Tab i 884019_C R505OverSebastian_SHE_MASTER_v3 9. Structures Summary Page 20 of 27 7!7/2026 Project Activity 10: BDR Estimator: L. Powell Bridge Identifier (Number or Name): 884019 C-bRoseland I1oad over Scbast— R vcr Prong iBrdgc No 8840'.'31 Bodge Rcolaoemcnt Representing Print Name Signature I Date Ft i Jr District Consultant Name Null:: signature Block is optional, per vistrict preference Task No.General Task Units No of Units Hours/ Unit No. of Sheets Total Hours Comments Requirement 10 1 Bridge Geometry LS 1 12 12 Finalize bridge geometry with respect to typical section/hydraulics - single span FSB vs. Two Span FSB 10 2 Ship Impact Data Collection LS 1 2 2 Provide information for USCG Bridge Questionnaire only - non navigable. Will need clearance information 103 Ship Impact Criteria EA 0 0 0 N/A Superstructure Alternatives 10.4 Short Span Concrete Bridge EA ALT 0 0 0 N+A - go with FSB per IRC 10.5 Medium Span Concrete Bridge EA ALT 0 0 0 NIA 10 6 Long Span Concrete Bridge EA ALT 0 0 0 N/A 10.7 Structural Steel Bridge EA ALT 0 0 0 NA Foundation & Substructure Alternatives 10.8 Pier/Bent EA Type 1 6 6 Pile Bents only 10.9 Shallow Foundations i GRS Abutments EA Type 1 8 8 Evaluate GRS-lBS - dependent on Hydraulics 10.10 - - Deep Foundations EA Foundation Evaluated 1 8 8 Use smallest pile alternative based on geotechnical parameters Movable Span 10.11 Data Collection and Design Criteria LS 1 0 0 N/A 10.12 Movable Span Geometries and Clearances LS 1 0 0 N/A 10.13 Deck System Evaluation LS 1 0 0 N/A 10.14 Framing Plan Development LS 1 0 0 NIA 10.15 Main Girder PreliminaryDesign LS 1 0 0 N/A 10.16 Conceptual Span Balance/Counterweight LS 1 0 0 N/A 884019_CR505OverSebestian_SHE_MASTER_v3 10. Strictures-BDR Page 21 of 27 7/712026 Protect Activity 10: BDR Task No.Sheets Task Units No of Units Hours/ UnitNo of Total Hours Comments 10.17 Support System Development LS 1 0 0 N/A 10.18 Drive Power Calculations LS 1 0 N/A 10.19 Drive System Development I S 1 0 N/A 10.20 Power and Control Development LS 1 0 0 N/A 10.21 Conceptual Pier Design LS 1 0 0 N/A 10.22 Foundation Analysis (FL PIER) LS 1 0 0 N/A 10.23 Tender Visibility Study LS 1 0 0 N/A Other BDR Issues 10.24 Aesthetics LS 1 0 0 N/A 10.25 TTCP/Staged Construction Requirements LS 1 0 0 N/A 10.26 Constructibility Requirements LS 1 0 0 N/A 10.27 Load Rating for damaged/widened structures EA Unit 1 0 0 N/A 10.28 Quantity and Cost Estimates EA ALT 0 0 0 WA 10.29 Quantityand Cost Estimates - Movable Span LS 1 0 0 N/A 1030 Wall Type Justification LS 1 0 0 N/A Report Preparation 10.31 Exhibits EA SHEET 0 0 0 N/A 10.32 Exhibits - Movable Span EA SHEET 0 0 0 N/A 10.33 Report Preparation LS 1 0 0 N/A 10.34 Report Preparation- Movable Span LS 1 0 0 WA 10.35 BDR Submittal Package LS 1 0 0 N/A 10. Structures - Bridge Development Report Total 36 When ONLY 30% plans are final deliverable, use Task Nos. as shown for applicable bridge types for project Activities 12 thru 16. Stafhours to be negotiated and scaled appropriately. 884019_ CR505Ove.Sehastian_SHE_ VASTER_,3 10. Stn,cn,res-0[)R Pace 22 of 27 7r7 7026 Protect Activity 12: Structures. Short Span Concrete Estimator' L. Powell CR-505'Rosalanf Road over Sebastian River Prong (Bridge Na 8860191 Bridge Redacemenl Bridge Identifier (Number or Name): 884019 Representing Print Metro Signature I Oaf DUI Dislru Cons:rttant Nadu nut c.: aryne— OIGCR IS oprronar, per tnsrncr prererence Task No Task Units No. Of Units Hours/ Unit No. of Sheets Total Hours Comments General Layout Design and Plans 12.1 Overall Bridge Final Geometry LS slr.v :rrirgeino skew 12.2 12.3 ExpansiortContracvon Analysis General Plan and Elevation CA Umt Sheet 2 2 Poured pint at beginlene o iux Straigheno skew 28 1 28 12.4 Construct -on Staging Sheet 0 0 0 NIA closure 12.5 Approach Slab Plan and Details Sheet 8 1 a Use 2011 slardar:ls ¶26 Miscellaneous Details Sheet r.i1 6 72 Riprap sdedts uln by orange, 001111 s End Bent Design and Plans 127 End Bent Geometry EA End Bent _ 8 Normal end mnoiton 126 End Bent Structural Design EA Design 14 14 One similar design 12.9 End Bent Plan and Elevation Sheet , 16 2 32 Ndmal end oondillon 12.10 End Bent Details Sheet 2 1^ 2 20 End beret sedionsrbookwalth iegeell sheets Intermedlata Bent Design and Plans 12.11 Bent Geometry EA Bent a 4 Normal end condition (one IB et mast) 12.12 Bent Stability Analysis EA Analyse 14 14 one analysis for scour condition 12.13 Bed Structural Design EA Design 1 is 16 One slmdar design 12.14 Bent Plan and Elevation Sheet 1 16 1 16 Assume one sheet with table of elevations as needed 12.15 Bent Detects Sheet 1 12 1 12 One sheet for sections ae41119 CRSOsOers Senaaban_SHEMASTER v3 12. Snot Span Conernre gage 2:s c421 7A7202a Protect Activity 12: Structures. Short Span Concrete Task No. Task Units No. of Units Hours! Unit No. of Sheets Total Hours Comments Miscellaneous Substructure Design and Plans 12 16 Fr nnrnon Layout Shell i4 2 26 Nomhel end cordildn Miscellaneous Superstructure Design and Plans 12,17 Finish Grade Elevation Calculation LS 1 12 12 Constant width 12.18 Fnish Grad. Elacabans Sum 2 12 2 24 Aswane Mo awtslada&typcals mcludng approahc slabs CaMdrnPlace Slab Bridges 12.19 Brdge Deck Dos', FA lint 0 0 0 N/A 12,20 Superslntaure Plan Sheet 0 0 0 0 N/A 12.21 Supersty cluroSectoos and Details Sheet 0 0 0 0 N/A Prestressed Slab Unit Bridges 1222 Prestressed Slab Unit Design LA Desgn 2 /6 32 1Msrlor/Extericr FSB Beam Dasgns 12,23 Prestrxsnd Slab Unit Layout Sheets 1 12 1 12 Beam layout 12.24 Preshassed Slab Un t Dota/s and Schedule Shoat 2 24 2 48 Beam Tables & Datans 12.25 Deck Topping Reinforcing LayckA Sheet 12 1 12 Normal Ends 12.26 SupersUucluro Sections ano Details cruet 2 16 2 32 Typical section,,'slab dehechor, ddtans. sidewalk sections Reinforcing Bar List 12.27 Preparation of Remfaong Bar 1st Sheet 2 2 16 Asaurne two enacts Load Rating -- ------------- ----- 12.28 Load Ratings LA unit .. 32 FSB"s 12. Structures • Short Span Concrete Bridge Total 26 500 e 4o1a_CR.WSbrerSeeesuan SHE_MASrER_v3 12. Salt Span Conoea i_-:-t n : r �]?72R Project Activity 19: Signing and Pavement Marking Analysis Estimator: J. Geller CR-505/Roseland Road over Sebastian River Prong (Bridge No. 884019) Bridge Replacement Representing Print Name Signature / Date FDOT District Consultant Namc nuts. aignarure nrocs is opoonar, perursrncr prererence Task No. Task Units No. of Units Hours/ Units Total Hours Comments 19.1 Traffic Data Analysis LS 0 N/A 19.2 No Passing Zone Study LS 1 0 0 N/A 19.3 Signing and Pavement Marking Master Design File LS 1 23 23 16 hrs for setup + 40 hr/mi (assume 0.16mi) 16+7= 23 19.4 Multi -Post Sign SupportCalculations EA it 0 N/A 19.5 Sign Panel Design Analysis EA 0 0 NSA 19.6 Sign Lighting/Electrical Calculations EA 0 0 NSA 19.7 S&PM Quantities for ED Report Length (Miles) 0.1G Calculated Hours 15 1 Complexity Low Ranyr, Interchanges Rest Areas 19.8 Cost Estimate LS 1 8 8 1 g 9 Technical Special Provisions and Modified Special Provisions LS LS 1 1 n 0 U NA N/A 19.10 Other Signing and Pavement Marking Signing and Pavement Marking Analysis Technical Subtotal 46 19.11 Field Reviews LS 1 n 0 19.12 Technical Meetings LS 1 0 0 Meetings are listed below 19.13 Quality Assurance/Quality Control LS % 5% 2 19.14 Independent Peer Review LS 1, 0% 0 1915 Supervision LS % 2 Signing and Pavement Marking Analysis Nontechnical Subtotal 4 1916 Coordination LS % 3% 2 19. Signing and Pavement Marking Analysis Total 52 884019_ CR505OverSebastian_SHE MASTER v3 19. Signing & Marking Analysis page 25 of 27 7./720211 Project Activity 19: Signing and Pavement Marking Analysis Task I No. of Hours/ Total Task Units Comments Units Units Hours No. Technical Meetings Units No of Units Hours/ Unit Total Hours Comments PM Attendance at Meeting Required? Number Sign Panel Design EA 0 0 Queue Length Analysis EA 0 0 Local Governments (cities, counties) EAR EA 0 0 Other Meetings Subtotal Technical Meetings 0 Subtotal Project Manager Meetings 0 Progress Meetings (I required ny FDOT) EA 0 PM attendance at Progress Meetings is manually entered or Gereral Task 3 - - Phase Rev ew Meetings EA 0 PM attendarce at Phase Review Meetings is manually entered or Gereral Task 3 Total Meetings 0 Total Project Manager Meetings (carries to Tab 3) 0 884019_CR505OverSebastianSHE--MASTER_v3 19. Signing & Marking Analysis Page 26 of 27 77/202k ltlulmnn1 Representing Print Name, Sign eture I Date FOOT District Consultant Name Task No. Task Project Parameter Staff Hours Documentation Description Units Complexity Calculated Department Consultant Negotiated Provide documentation when negotiated hours differ from the calculated hours. 201 Key Sheet 0 0 0 0 NA SignatureSheel - i. 1 0 6 0 0 0 6 0 0 N 202 General Notes/Pay Item Noes Shrtpte 20 3 Project Layout Plan Sheet 0 12 0 0 0 12 0 0 NA 20 4 W S91r0ersecion k0d$bck Xing 0 0 0 0 0 WA Interchange Roundabout 0 0 0 0 0 WA Rest Area Toll Facilit 0 0 0 0 0 WA 205 Special Details Details 0 Simple 0 0 0 0 WA 0 Standard 0 0 0 0 N'A 0 Complex 0 0 0 0 WA 20.6 Service Point Details Pant 0 Simple 0 0 0 0 WA 0 Standard 0 0 0 0 WA 207 Guide Sign Data Sign Panel 2 4 0 4 0 208 Cross Sections (Sign Installations) Multi -post 0 0 0 0 0 0 0 0 0 WA WA Owed^ Structures 0 Standard 0 Complex 0 0 0 0 WA S&PM Plans Technical Hours Subtotal 22 0 22 0 20 9 Quality Assurenca+Quality Control .0 1 1% 2 0 2 0 20.10 Supernsral .. 1 5% 2 0 2 0 S&PM Plans Total 26 0 26 0 K«E HOLTZ CONSULTING ENGINEERS, INC. July 17, 2026 Mr. Jaime Celler, PE Consor, Inc. 2041 Vista Parkway, Suite 101 West Palm Beach, FL 33411 Subject: Roseland Bridge Water Main Relocation Dear Jaime, Holtz Consulting Engineers, Inc. (HCE) is pleased to submit our proposal for engineering services to assist Consor with the Roseland Bridge project in Indian River County. This project includes the replacement of an existing 12/16 -inch potable water main along Roseland Rd. that is installed as an aerial crossing adjacent to an existing bridge that is planned to be replaced. The aerial crossing will be replaced with a new 12/16 -inch water main to be installed attached to the new proposed bridge. The existing aerial crossing pipe, concrete support and pilings will be removed and disposed of after the new water main is in service. The design elements are assumed to include the following: • Approximately 300 linear feet of 12/16 -inch water main. Final pipeline lengths may increase or decrease due to field conditions. • The abandonment and removal of the existing 12/1 6 -inch water main, concrete support structure and pilings. SCOPE OF WORK Consor has requested HCE provide engineering services including engineering design and permitting support services related to the water main relocation for the Roseland Bridge Replacement project. This scope of work does not include any surveying services, geotechnical services, or environmental assessment services. It is assumed that Consor will provide HCE all required surveying and geotechnical engineering information needed to complete the design of the water main relocation. Any environmental assessment services needed for the permitting with the regulatory agencies are the responsibility of Consor. Bidding support and engineering services during construction are not included under this scope, however, these services can be provided under a separate authorization. Specific tasks include the following: 1. Task I — Engineering Design Services 2. Task 2- Permitting Support Services TASK I - DESIGN SERVICES HCE shall prepare detailed drawings and specifications depicting the installation of the new 12/16 -inch water main, connections to the existing water main, and the abandonment and/or removal of the existing 607 SW St. Lucie Crescent, Suite 103, Stuart, FL 34994 Office: (772) 919-4905 • Fax: (772) 919-4909 K4qF= HOLTZ CONSULTING ENGINEERS, INC. water main, including the existing aerial crossing.. Indian River County details will be utilized. HCE will coordinate a design kick-off meeting, conduct site visits, review information provided by Consor about the existing water main and other utilities in the area, and attend meetings, as necessary. Drawings will be prepared on a 1'=20' scale. Approximately seven (7) design drawings will be provided for this project. The preliminary drawing list is as follows: G- 1 Cover and Index G-2 Legend and General Notes P-1 Demolition of Existing Water Main P-2 Water Main Plan and Profile 1 P-3 Water Main Plan and Profile 2 D- I Details Sheet I D-2 Details Sheet 2 HCE shall prepare the following submittals: • 60% design including site plan and pipe layout, including proposed bore profile for review and approval of the pipe layout plan and profile. • 90% design including plans and specifications incorporating comments on the 60% submittal. • 100% design including signed and sealed plans and specifications incorporating comments on the 90% submittal for public bidding. • Engineer's opinion of probable construction cost, including pay items and quantities, to be provided with each submittal. TASK 2— PERMITTING SUPPORT SERVICES HCE will provide permitting support services to Consor to aid in the issuance of the required permits for this project. This support shall be limited to providing signed and sealed copies of the finalized water main relocation plans, assistance in answering any requests for additional information that may arise during the permitting process, and Utility Coordination with IRCU. SECTION 2- DELIVERABLES The following deliverables will be provided to Consor: TASK DELIVERABLE QUANTITY Task I— Engineering 60%, 90% and 100% Plans and Electronic Files to include Design Services Specifications PDF of Plans and CAD Files of Plan Sheets, Specifications shall be provided in both Word and PDF Files 607 SW St. Lucie Crescent, Suite 103, Stuart, FL 34994 Office: (772) 919-4905 • Fax: (772) 919-4909 KBE HOLTZ CONSULTING ENGINEERS, INC. . Compensation for the tasks outlined above will be as follows: TASK ENGINEERING FEE Task 1- Design Services 539,880.00 (Lump Suin) Task 2— Permitting Support Services 55,770.00 (Lump Sum) TOTAL $45,650.00 SECTION 4— SCHEDULE HCE's schedule will be concurrent with Consor's schedule for the project. Consor shall provide this information to HCE upon Notice to Proceed. SECTION 5- OBLIGATIONS To assist in meeting the schedule and budget estimates contained in this Task Order, Consor will provide the following: 1. Prompt review and comment on deliverables. 2. Attendance of key personnel at meetings. 3. Provide all available as -built information, GIS data, record drawings, and other documents that will assist HCE in preparing Contract Documents. 4. Preparation and submittal of permit applications. 5. Provide survey in AutoCAD format. We greatly appreciate the opportunity to assist Consor with this project. Sincerely, HO TZ CONSULTING ENGINEERS, INC. (fir Christine Miranda, PE Vice President ACCEPTED BY: Consor, Inc. Date 607 SW St. Lucie Crescent, Suite 103, Stuart, FL 34994 Office: (772) 919-4905 • Fax: (772) 919-4909 Attachment A - Roseland Bridge Water Main Relocation S � c c L f d + Si O % E C 7 7 A C'711 G"''11 SI MI C 1511 C�)tl -- 1. Engineering Design Services Site Visits (2 fa I I Tour Each) with three team members each visit 6 6 6 S3.360.00 52,480.00 $39,880.00 Review Information 2 4 4 2 Cost Estimates 2 4 8 S2,940.00 Prepare 60"o Submittal 2 4 8 16 2 S5,520.00 Prepare 90°„ Submittals (Plans Specs( 4 8 32 64 2 $18,700.00 Finalize Bid Does, aka 100°-0 2 4 8 16 2 S5,520.00 2. Permitting Support Provide Signed and Scaled Drawings oc, o. 4 1 S .170.00 c r uv� rm $5,770,00 26 40 70 106 7 50.00 1ICE Total Engineering Fee $45,650.0(1 $45,65()