HomeMy WebLinkAbout2026-168 2026026/CP-2522
SECTION 00520 Agreement
THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the
State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called
OWNER) and Proctor Construction Company, LLC (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows:
ARTICLE 1 -WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Work is generally described as follows:
The proposed project includes the construction of a 9,983 square foot new Fire Station/EMS
building located at 9010 87th Street, Vero Beach, FL. The space will be split between dorm, office,
facility and equipment storage, as well as a four bay apparatus room. The building will consist of a
single-story concrete block structure with a standing seam metal roof over self-sealing
underlayment. Civil site work will include the construction of a concrete driveway and parking lot.
Proposed work will also include installation of drainage structures, construction of a stormwater
detention basin, utility pipework for forcemains and watermains, and the construction of a lift station.
ARTICLE 2 -THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
Project Name: Indian River County Fire/EMS Station #15
County Project Number: CP-2522
Bid Number: 2026026
Project Address: 9010 87th Street, Vero Beach, Fl. 32967
ARTICLE 3 - ENGINEER
3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and
will act as OWNER's representative, assume all duties and responsibilities, and have the
rights and authority assigned to ENGINEER in the Contract Documents in connection with
the completion of the Work in accordance with the Contract Documents.
ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment
A. The Work will be substantially completed on or before the 400th calendar day after the date
when the Contract Times commence to run as provided in paragraph 2.03 of the General
Conditions, and completed and ready for final payment in accordance with paragraph 14.07
of the General Conditions on or before the 430th calendar day after the date when the
Contract Times commence to run.
4.03 Liquidated Damages
Agreement -00520-r
2026026/CP-2522
A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the Work is not completed within the times specified
in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12
of the General Conditions. Liquidated damages will commence for this portion of work. The
parties also recognize the delays, expense, and difficulties involved in proving in a legal
proceeding the actual loss suffered by OWNER if the Work is not completed on time.
Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER
$3,813.00 for each calendar day that expires after the time specified in paragraph 4.02 for
Substantial Completion until the Work is substantially complete. After Substantial
Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work
within the Contract Time or any proper extension thereof granted by OWNER,
CONTRACTOR shall pay OWNER $3,813.00 for each calendar day that expires after the
time specified in paragraph 4.02 for completion and readiness for final payment until the
Work is completed and ready for final payment.
ARTICLE 5 - CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the
Contract Documents, an amount in current funds equal to the sum of the amounts
determined pursuant to paragraph 5.01.A and summarized in paragraph 5.01.B, below:
A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit.
B. THE CONTRACT SUM subject to additions and deductions provided in the Contract:
Numerical Amount: $5,566,874.91
Written Amount: Five million, five hundred sixty six thousand, eight hundred seventy
four dollars and ninety-one cents
ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. CONTRACTOR shall submit Applications for Payment in accordance with Article
14 of the General Conditions. Applications for Payment will be processed by
ENGINEER as provided in the General Conditions and the Contract Documents.
6.02 Progress Payments.
A. The OWNER shall make progress payments to the CONTRACTOR on the basis
of the approved partial payment request as recommended by ENGINEER in
accordance with the provisions of the Local Government Prompt Payment Act,
Florida Statutes section 218.70 et. seq. The OWNER shall retain five percent(5%)
of the payment amounts due to the CONTRACTOR until substantial completion of
all work to be performed by CONTRACTOR under the Contract Documents.
B. For construction projects less than $10 million, at the time the OWNER is in receipt
of the Certificate of Substantial Completion, the OWNER shall have 30 calendar
days to provide a list to the CONTRACTOR of items to be completed and the
estimated cost to complete each item on the list. OWNER and CONTRACTOR
agree that the CONTRACTOR'S itemized bid shall serve as the basis for
Agreement -00520-2
2026o26/CP-2522
determining the cost of each item on the list. For projects in excess of$10 million,
OWNER shall have up to 45 calendar days following receipt of Certificate of
Substantial Completion of the project to provide CONTRACTOR with said list.
C. Payment of Retainage - Within 20 business days following the creation of the list,
OWNER shall pay CONTRACTOR the remaining contract balance including all
retainage previously withheld by OWNER except for an amount equal to 150% of
the estimated cost to complete all of the items on the list. Upon completion of all
items on the list, the CONTRACTOR may submit a payment request for the amount
of the 150% retainage held by the OWNER. If a good faith dispute exists as to
whether one or more of the items have been finished, the OWNER may continue
to withhold the 150% of the total cost to complete such items. The OWNER shall
provide CONTRACTOR written reasons for disputing completion of the list.
6.03 Pay Requests.
A. Each request for a progress payment shall be submitted on the application
provided by OWNER and the application for payment shall contain the
CONTRACTOR'S certification. All progress payments will be on the basis of
progress of the work measured by the schedule of values established, or in the
case of unit price work based on the number of units completed.
6.04 Paragraphs 6.02 and 6.03
do not apply to construction services work purchased by the County as OWNER which
are paid for, in whole or in part, with federal funds and are subject to federal grantor laws
and regulations or requirements that are contrary to any provision of the Local
Government Prompt Payment Act. In such event, payment and retainage provisions shall
be governed by the applicable grant requirements and guidelines.
6.05 Acceptance of Final Payment as Release.
A. The acceptance by the CONTRACTOR of final payment shall be and shall operate
as a release to the OWNER from all claims and all liability to the CONTRACTOR
other than claims in stated amounts as may be specifically excepted by the
CONTRACTOR for all things done or furnished in connection with the work under
this Contract and for every act and neglect of the OWNER and others relating to
or arising out of the work. Any payment, however, final or otherwise, shall not
release the CONTRACTOR or its sureties from any obligations under the Contract
Documents or the Public Construction Bond.
ARTICLE 7 - INDEMNIFICATION
7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract.
ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
following representations:
A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.
Agreement -00520-3
2026026/CP-2522
B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, and performance of the
Work.
C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.
D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface
conditions at or contiguous to the Site and all drawings of physical conditions in or relating
to existing surface or subsurface structures at or contiguous to the Site(except Underground
Facilities) which have been identified in the Supplementary Conditions as provided in
paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous
Environmental Condition, if any, at the Site which have been identified in the Supplementary
Conditions as provided in paragraph 4.06 of the General Conditions.
E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations, explorations, tests,
studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
at or contiguous to the Site which may affect cost, progress, or performance of the Work or
which relate to any aspect of the means, methods, techniques, sequences, and procedures
of construction to be employed by CONTRACTOR, including applying the specific means,
methods, techniques, sequences, and procedures of construction, if any, expressly required
by the Contract Documents to be employed by CONTRACTOR, and safety precautions and
programs incident thereto
F. CONTRACTOR does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the performance of the Work at the
Contract Price, within the Contract Times, and in accordance with the other terms and
conditions of the Contract Documents.
G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Contract Documents.
H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the Site, reports and drawings identified in the Contract
Documents, and all additional examinations, investigations, explorations, tests, studies, and
data with the Contract Documents.
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or
discrepancies that CONTRACTOR has discovered in the Contract Documents, and the
written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
J. The Contract Documents are generally sufficient to indicate and convey understanding of
all terms and conditions for performance and furnishing of the Work.
K. CONTRACTOR is registered with and will use the Department of un Security's E-Verify
system (www.e-verify.qov)to confirm the employment eligibility of all newly hired employees
for the duration of this agreement, as required by Section 448.095, F.S. CONTRACTOR is
also responsible for obtaining an affidavit from all subcontractors, as required in Section
448.095(5)(b), F.S., stating the subcontractor does not employ, contract with, or subcontract
with an unauthorized alien.
Agreement -00520-4
2026o26/CP-2522
ARTICLE 9 - CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 00520-1 to 00520-8, inclusive);
2. Notice to Proceed (page 00550-1);
3. Sample Certificate of Liability Insurance (page 00620-1);
4. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive);
5. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive);
6. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive);
7. Professional Surveyor& Mapper's Certification as to Elevations and Locations of the
Work (page 00634-1);
8. General Conditions (pages 00700-1 to 00700-37, inclusive);
9. Supplementary Conditions (pages 00800-1 to 00800-13, inclusive);
10. Specifications as listed in Division 1 (General Requirements) and Division 2 (Technical
Provisions);
11. Drawings consisting of a cover sheet, and sheets numbered ABB through IRR-2,
inclusive, with each sheet bearing the following general title: Station 15;
12. Addenda 1 through 6, inclusive;
13. Appendices to this Agreement (enumerated as follows):
Appendix A— Permits
Appendix B— Indian River County Fertilizer Ordinances
Appendix C— Indian River County Traffic Engineering Special Conditions for Right of
Way Construction
Appendix D — Subsurface Soil Exploration and Geotechnical Engineering Evaluation
14. CONTRACTOR'S BID Form and Bid Table BT-28NS (pages 00310-1 to 00310-4,
inclusive);
15. Sworn Statement on Disclosure of Relationships (page 00452-1);
16. Sworn Statement Under the Florida Trench Safety Act (pages 00454-1 to 00454-2,
inclusive);
17. Qualifications Questionnaire (page 00456-1 to 00456-2, inclusive);
18. List of Subcontractors (page 00458-1);
Agreement -00520-5
2026026/CP-2522
19. Certification Regarding Prohibition Against Contracting with Scrutinized Companies
(page 00460-1);
20. Anti-Human Trafficking Affidavit (page 00462-1);
21. The following which may be delivered or issued on or after the Effective Date of the
Agreement and are not attached hereto:
a) Written Amendments;
b) Work Change Directives;
c) Change Order(s);
ARTICLE 10 - MISCELLANEOUS
10.01 Terms
A. Terms used in this Agreement will have the meanings indicated in the General Conditions.
10.02 Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be
binding on another party hereto without the written consent of the party sought to be bound;
and, specifically but without limitation, moneys that may become due and moneys that are
due may not be assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), and unless specifically stated to the contrary in any written
consent to an assignment, no assignment will release or discharge the assignor from any
duty or responsibility under the Contract Documents.
10.03 Successors and Assigns
A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal
representatives to the other party hereto, its partners, successors, assigns, and legal
representatives in respect to all covenants, agreements, and obligations contained in the
Contract Documents.
10.04 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to
be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract
Documents shall be reformed to replace such stricken provision or part thereof with a valid
and enforceable provision that comes as close as possible to expressing the intention of the
stricken provision.
10.05 Venue
A. This Contract shall be governed by the laws of the State of Florida. Venue for any lawsuit
brought by either party against the other party or otherwise arising out of this Contract shall
be in Indian River County, Florida, or, in the event of a federal jurisdiction, in the United
States District Court for the Southern District of Florida.
10.06 Public Records Compliance
Agreement -00520-6
2026026/CP-2522
A. Indian River County is a public agency subject to Chapter 119, Florida Statutes. The
CONTRACTOR shall comply with Florida's Public Records Law. Specifically, the
CONTRACTOR shall:
(1) Keep and maintain public records required by the County to perform the service.
(2) Upon request from the County's Custodian of Public Records, provide the County with a
copy of the requested records or allow the records to be inspected or copied within a
reasonable time at a cost that does not exceed the cost provided in Chapter 119 or as
otherwise provided by law.
(3) Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law for the duration
of the contract term and following completion of the contract if the contractor does not transfer
the records to the County.
(4) Upon completion of the contract, transfer, at no cost, to the County all public records in
possession of the CONTRACTOR or keep and maintain public records required by the County
to perform the service. If the CONTRACTOR transfers all public records to the County upon
completion of the contract, the CONTRACTOR shall destroy any duplicate public records that
are exempt or confidential and exempt from public records disclosure requirements. If the
CONTRACTOR keeps and maintains public records upon completion of the contract, the
CONTRACTOR shall meet all applicable requirements for retaining public records. All records
stored electronically must be provided to the County, upon request from the Custodian of
Public Records, in a format that is compatible with the information technology systems of the
County.
B. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO
THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS
AT:
(772) 226-1424
publicrecordsCa�indianriver.gov
Indian River County Office of the County Attorney
1801 27th Street, Vero Beach, FL 32960
B. Failure of the Contractor to comply with these requirements shall be a material breach of
this Agreement.
Agreement -00520-7
2026026/CP-2522
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate.
One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the
Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their
behalf. This Agreement will be effective on September 15, 2027.
OWNER: J�a Q.. CONTRACTOR:
.INDIA RI COU ' .*1 PROCTOR CONSTRUCTION COMPANY,
LLC
De I Loa , Chairm , .. s, o S By:
:04-- (4 .4......10
✓;1?! ..e...a-dili, „t:'-`; Name: .441V. IrTgN h ' ,,.
By: 4..4. Title: V S‘O1E.PrT ILO() .,1A? ti):```'
Jon A. T tkanich, Jr., County Administrator '`
(Corporate Seal) • '' •
APPROVED AS TO FORM AND LEGAL (If CONTRACTOR is a corpoiaticp or
SUFFICIENCY: partnership, attach evidence of au`.h•.:,rity to
sign)
By: '�Z7 W �l,t W. �� r'.e'i,'
nnifer bV.S huler, County Attorney ,p
Attest: ,1.,(Ati r�—'
Name: 4 ii ra 6r c v-1
Ryan L. Butler, Clerk of Court and Comptroller Title: K-e, (Ylu!It p f
ry� P/� Designat� �d_Representative:
�.r!Attest: UVi� Name: n►Ciii r i ,rl i'Yl)(int'
Deputy Clerk Title: 0> KIE Divisor)(SEAL) Address:72Sb a 14+.'y I, S4-c `IUD, ✓M P-1reLk, FL 3`1411b
Phone: 71V-.S5c1• i i I 1
Designated Representative:
Rob Skok, Capital Projects Manager
1801 27th Street, Vero Beach, FL 32960
(772) 226-1132
rskok@indianriver.gov
Agreement -00520-8
Primary Responses
Success:All data is validl
Numeric
o Quantity Unit Unit Price Total Cost
,naelidu t.;{ ..Required
FDOT Pay Item-Site Costs
Success:All values provided Bid #1-1 101.1 Mobilization 1 LS js73s151.82sne.1s12
l
Success:All values provided Bid #1-2 102-1 Maintenance of Traffic 1 LS $7,847.06 $7,647.06
Success:All values provided Bid #1.3 104-10-3 Sediment Barrier 1680 i LF $3.65 $6,132.00
i I I ,
i
Success:All values provided Bid #1-4 104.11 Floating Turbidity Barrier 100 LF $17.85 $1,785.00
Success:All values provided Bid #1-5 104-18 Inlet Protection 168 I EA $7.35 $1,234.80
l'--._.__.._.. __._._a_.._._._ _._._._._..._..._..1_..__....___.___
Success:All values provided Bid #1-6 I 110-1-1 Clearing and Grubbing 5 AC $7,647.00 $38,235.00 I
1
Success:All values provided Bid #1-7 120-1 Regular Excavation 7904 CY $17.00 $134,368.00
- - ( 1
Success:All values provided Bid 41-8 160-4 Type B Stabilization 4945 SY $8.00 i $39,580.00
I
350-4 Reinforced Cement Concrete Pavement,8"
Success:All values provided Bid #1-9 3970 ! SY $88.18 $258,754.80
(Drive aisle and Dumpster Pad)
--- - --A------ ..r_�_._�.._.
Success:All values provided Bid #1.10 350-4 Reinforced Cement Concrete Pavement,6" 975 SY $82.75 $80,681.25
(Parking Spaces and Sidewalks)
Success:All values provided Bid #1-11 425-1-521 Inlets,DT,BOT,Type C,<10' 6 EA $3,424.00 $20,544.00
Success:All values provided Bid 51-12 425-1-561 Inlets,DT BOT,Type F<10' 5 EA $4,840.00 $24,200.00
•
430-173-108 Pipe Culvert,Optional Material,
Success:All values provided Bid #1-13 Round,8"Gutter Drain(HP) 205 LF $58.00 $11,690.00
__- ___ ________ ! _ __-_ _ _H
Success:All values provided Bid #1-1a 430-175-118 Pipe Culvert,Optional Material, 545 LF $91.00 j $49,595.00
Round,18"S/CD(HP)
430-175-124 Pipe Culvert,Optional Material,
Success:All values provided Bid #1-15 Round,24"SICD(HP) 114 LF $110.00 $12,540.00
Success:All values provided Bid #1-1s 430-175-124 Pipe Culvert,Optional Material, 488 LF $140.00 $68,320.00
Round,24"S/CD(RCP)
Success:All values provided Bid #1-17 430.984-125 Mitered End Section,Optional Round, 1 EA $2,000.00 $2,000.00
18"SD
Success:All values provided Bid #1 1# 430-984-129 Mitered End Section,Optional Round, 1 FA $2,352 94 $2,352.94
24"SD
Success:All values provided Bid 81-19 520-2-4 Concrete Curb,Type'D' 200 LF $35.11 $7,022.00
Success:All values provided Bid #1-25 527-2 Detectable Warnings 42 SF $76.19 $3,199.98
Success:All values provided Bid 81-21 530-3-3 Riprap-Rubble,Bank and Shore 2.55 TN $500.00 $1.250.00
Success:All values provided Bid 01-22 550-10-212 Fencing,Type ,0.0-5.0',WNinyl 1057 LF $23.72 $25,072.04
-"1
Success:All values provided Bid #1-23 550-60-222 Fence Gate,Type B,Double,6.1-12.0' EA S 13,252 00 S 13,252.00
Opening
580-1-2 Landscape Complete-Large Plants
Success:All values provided Bid x1-24 1 LS $107,83950 $107,839.50
(Includes all Landscape Material)
Success:All values provided Bid #1-25 590-70 Irrigation System LS S 50,200.00 5 50,200.00
I
Success:All values provided Bid x1.26 630-2-12 Conduit,Furnish&Install,Directional 375 LF $0.00 $0.00
Bore,2",(Signal Preemption)
Success:All values provided Bid #1-27 700-1-111 Single Column Ground Sign assembly, 11 EA S 30.50 $335.50
F&I Ground Mount,Less Thank 12 SF
.I
1
710-11-123 Painted Pavement Markings,Standard,
Success:All values provided Bid #1-26 White Solid,12" 48 LF 55.00 $240.00
I !
Success:Al values provided Bid #1-29 710-11-125 Painted Pavement Markings,Standard, 49 LF $10.00 $490.00
White Solid,24"
I.
710-11-170 Painted Pavement Markings,Standard,
Success:All values provided Bid #1-30 13 EA $125.00 $1,625.00
White,Arrows
Success:All values provided Bid #1-31 i 711-11-123 Thermoplastic,Standard,White,Solid, 219 LF $10.00 $2,190.00
�.. 12 {
Success:All values provided Bid #132 711-11-125 Thermoplastic,Standard,White Solid, 81 LF I $25.00 $2,025.00
24"
Success:All values provided Bid #1-33 711-11-170 Thermoplastic,Standard,White, 2 EA $600.00 $1,200.00
Arrows
1
Success:All values provided Bid #1-34 711-11-202 Thermoplastic,Standard,Yellow, 0.01 GM S 62,600.00 $628.00 I
Solid,6"
Success:All values provided Bid #1-35 715-61-200 Light Pole Complete,F&I,Standard 8 EA $3,500-00 5 28,000.00
Pole Standard Foundation,20'
Success:All values provided Bid #1-36 751-44-2 Flag Pole,26-35' 1 EA S 9.498.25 $9,498.25
Success:All values provided Bid #1-37 999.1 Construction Layout/Record Drawings 1 LS S 25,774 00 $25,774.00
-
1050-31-204 Utility Pipe-Polyvinyl Chloride,
Success:All values provided Bid #1-38 532 I F $36.24 $19,279.68
Furnish&Install,Water/Sewer,4" 1
Success:All values provided Bid #1-39 1050-31-206 Utility Pipe-Polyvinyl Chloride, 156 LF $69.00 S 10,764.00 '
Furnish&Install,Water/Sewer,6"
I
1050-31-208 Utility Pipe-Polyvinyl Chloride,
Success:All values provided Bid 01-40 Furnish&Install,Water/Sewer,8",Directional 54 LF $284.00 $15,336.00
Bore
Success:All values provided Bid #1-41 1050.42-202 Utility Pipe-High Density 214 LF S36 12 5 7,729.68
Polyethylene,Furnish&Install,Water/Sewer,2"
Success:All values provided Bid #1-42 1060-13-311 Drainage Cleanouts,6" 5 FA 5 794.12 5 3.970.60
Success:All values provided Bid #1-43 1080.21-102 Utility Fixture-Valve/Meter Box, 1 EA 5 1.250.00 S 1,250.00
Furnish&Install,2" i
1080-22-12 Utility Fixture,Backflow Assembly,
success:All values provided Bid #1-44 1 EA $4,558.82 $4,658.82
Furnish&Install,2"Potable Water
Success:All values provided Bid #1-45 1080-22-12 Utility Fixture,Backflow Assembly, EA S 16,218 82 S 16,2'8.82
Furnish&Install 6"Fire
Success:All values provided Bid #1-06 1080-23-112 Utility Fixture-Tapping Saddle/Sleeve, 2 EA $7,198.00 $14,396.00
Furnish&Install 12"
Success:All values provided Bid #1-47 1080-24-102 Utility Fixture-Valve Assembly, 2 EA, $1,250.00 $2,500.00
Furnish&Install,2"
Success:All values provided Bid #1-48 1080-24-104 Utility Fixture-Valve Assembly, 3 FA 5;.932 94 $5.798.82
Furnish&Install,4"
Success:All values provided Bid 91-49 1080-24-106 Utility Fixture-Valve Assembly, 3 EA $2.461.18 $7,383.54
Furnish&Install,6"
Success:All values provided Bid #1-50 1080-24-108 Utility Fbture Valor Assembly, 1 EA $3,850.00 5 3.850.00
Furnish&Install,8"
I i
Success:All values provided Bid #1-51 1080-32.101 Utility Fixture-Sample Point,Furnish 1 EA $1,950.00 $1,950.00
&Install,1" +
1080-32-108 Utility Fixture-Sample Point,Furnish
Success:All values provided Bid #t-52 FA $2,785.88 $2,785.88
&Install,8"
Success:All values provided Bid #1-53 1644-112-06 Fire Hydrant,F&I,Standard,2 Hose, 1 EA 5 8,274.12 $8,274.12
laic=- •
S 1,903,768.50
Non-FDOT Pay Item-Site Costs
succsss:MI values provided Bid #2-1 1 Lift Station,Private,Fiberglass 5'Diameter 1 LS $100,783.00 $100,783.00
Success:All values prodded i Bid #2-2 2 Oil/Water Separator,550 Gallon LS $8,823.53 $8,623.53
Success:All values provided Bid #2-3 i 3 Grease Traps 2 EA $9.500.00 $19,002.00
Success:All values provided Bid #2-4 4 Dumpster Enclosure 1 FA S 7500.00 5 7,500.00
EC= $136,106.53
Building Costs
Success:All values provided Bid #3-1 Division 1 General Requirements 1 LS $80,001.09 $80,001.09
Success:All values provided Bid #3-2 Division 3 Concrete 1 LS $329,855.00 $329,855.00
Success:All values provided Bid #3-3 Division 4 Masonry 1 I S $118,850.00 $118,850.00
Success:All values provided Bid #3-4 Division 5 Metals ( 1 LS $19,693.46 $19,693.48
j — — -- --1--
Success,All values provided Bid #3-5 Division 6 Carpentry 1 LS $301,337.58 S 301,337.58
Success:All values provided Bid #3-6 Division 7 Thermal&Moisture Protection I 1 LS $222,211.00 $222,211.00
Success:All values provided Bid #3-7 Division 8 Doors,Windows and Glass 1 LS • $524,630.28 $524,630.28
Success:All values provided Bid #3-8 Division 9 Finishes 1 LS $411,498.11 $411,498.11
Success:All values provided Bid #3-9 Division 11 Equipment 1 i LS $42,585.14 $42,585.14
Success:All values provided Bid #3-10 Division 12 Furnishings• I 1 LS $65,000.00 $65,00000
Success:All values provided Bid #3-11 Division 13 Special Construction 1 LS $69,980.00 $69,980.00
—i- ___. __s
Success:All values provided Bid #3-12 Division 14 Conveying Systems i 1 a LS ! $0.00 $0.00
Success:All values provided Bid #3-13 Division 22 Plumbing 1 LS S 212.152.83 $212.152.83
Success:All values provided Bid #3-14 Division 23 Heating,Ventilating and Air I 1 i LS $373,900.00 $373,900.00
Conditioning l
1
Success:All values provided Bid #3-15 Division 26 Electrical 1 LS $890,100.00 I $890,100.00
Success:All values provided Bid #3-16 Division 27 Communications 1 LS $0.00 $0.00 III
._ - % ..__ __J
Success:All values provided Bid #3-17 Division 28 Electronic Safety and Security 1 I LS 1 $28,207.00 ! $28,207.00
$3,488,001.49
Addendum 3 items
Success:All values provided Bid #4-1 430-524.100-Straight Concrete Endwalls,24", 1 EA $4,665.88 $4,665.88
Single,0 Degrees,Round
1 — —� ._ 1 1 —------4— ----1
I
Success:All values provided Bid #4-2 Division 10 Specialities 1 LS $33,707.51 $33,707.51 i
$38,373.39
Addendum 5 Item
f- r --._.._--- ---r----__------._.�
Success:All values provided Bid #5-1 5303.4 Riprap-Rubble,F81,Ditch Lining 2.5 TN $250.00 $825.00
$625.00
$5,568,874.91