HomeMy WebLinkAbout2/3/1997� MINUTES AWACHED
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
A G E N D A
SPECIAL WORKSHOP MEETING
1:30 p.m. - COUNTY COMMISSION CHAMBER
FEBRUARY 3, 1997
County Administration Building
1840 25th Street
Vero Beach, Florida
COUNTY COMMISSIONERS
Carolyn K. Eggert, Chairman (District 2)
John W. Tippin, Vice Chairman (District 4)
Fran B. Adams (District 1)
Caroline D. Ginn (District 5
Kenneth R. Macht (District 3)
James E. Chandler, County Administrator
Charles P. Vitunac, County Attorney
Jeffrey K. Barton, Clerk to the Board
1:30 p.m. UTILITY DEPARTMENT OVERVIEW
ANYONE WHO MAY WISH TO APPEAL ANY DECISION WHICH MAY BE MADE
AT THIS MEETING WILL NEED TO ENSURE THAT A VERBATIM RECORD OF THE
PROCEEDINGS IS MADE WHICH INCLUDES THE TESTIMONY AND EVIDENCE UPON
WHICH THE APPEAL WILL BE BASED.
ANYONE WHO NEEDS A SPECIAL ACCOMMODATION FOR THIS MEETING MAY
CONTACT THE COUNTY'S AMERICANS WITH DISABILITIES ACT (ADA)
COORDINATOR AT 567-8000 X408 AT LEAST 48 HOURS IN ADVANCE OF MEETING.
INDEX TO
SPECIAL WORKSHOP MEETING OF
BOARD OF COUNTY COAMOSIONERS
UTILITY DEPARTMENT OVERVIEW
FEBRUARY 3, 1997
HISTORY OF UTILITIES DEPARTMENT . . . . . . . . . . . . . . . 1
SOLID WASTE DISPOSAL DISTRICT . . . . . . . . . . . . . . . . 1
WATER AND WASTEWATER SERVICES . . . . . . . . . . . . . . . . 13
Development of Rates and Budget Administration . . . . . 14
Development of Customer Base . . . . . . . . . . . . . . 17
Graphical Information Systems/Infrastructure Management
Systems . . . . . . . . . . . . . . . . . . . . . . 18
Master Planning, Wastewater/Water Treatment Plants,
SCADA Infrastructure Interface . . . . . . . . . . 23
Permitting and Water Quality Management . . . . . . . . 26
Design and Implementation of Collection and Distribution
System . . . . . . . . . . . . . . . . . . . . . . 32
Implementation of Assessment Projects . . . . . . . . . 37
Inspection of Construction Projects . . . . . . . . . . 43
Customer Service . . . . . . . . . . . . . . . . . . 44
Closing Summarization Operations and Maintenance of
Infrastructure . . . . . . . . . . . . . . . . . . 46
Quality of Product . . . . . . . . . . . . . . . . . . . 49
SPECIAL MEETING
February 3, 1997
r
The Board of County Commissioners of Indian River County,
Florida, met in Special Session in County Commission Chambers, 1840
25th Street, Vero Beach, Florida, on Monday, February 3, 1997, at
1:30 p.m. Present were Carolyn K. Eggert, Chairman; John W.
Tippin, Vice Chairman; Fran B. Adams; Kenneth R. Macht; and
Caroline D. Ginn. Also present were James E. Chandler, County
Administrator; Charles P. Vitunac, County Attorney; and Patricia
"PJ" Jones, Deputy Clerk.
Chairman Eggert opened the meeting and announced that at the
end of the presentation, the Commissioners and then the public
would be invited to ask any questions.
HISTORY OF UTILITIES DEPARTIVIEN'r
Utilities Director Terry Pinto gave a brief history of the
Utilities Department.
SOLID WASTE DISPOSAL DISTRICT
Solid Waste Disposal District Manager Ronald R. Brooks
reviewed the following:
OvExvIXw -
The Solid Waste Disposal District (SWDD) was established as a
dependent special district of Indian River County on December 22,
1987 under the provisions of County Ordinance 87-67. The SWDD
encompasses the unincorporated area of the County and, through
interlocal agreements, the municipalities of Vero Beach, Town of
Indian River Shores, Town of Orchid, City of Sebastian, and the
City of Fellsmere.
The SWDD has the responsibility of providing efficient and
acceptable collection, recycling, disposal and overall management
of solid waste generated within the District. The Board of County
Commissioners serves as the District's Board of Commissioners with
the County Administrator serving as the SWDD Administrator and the
Director of Utilities serving as the SWDD Director. The SWDD
employs a total of 65 employees as illustrated in the
organizational chart provided as Figure 1.
SOLID i+ASTE SYS22H
The SWDD's waste management system is composed of three primary
budgetary systems consisting of the landfill operations, refuse
operations, and recycling operations. The landfill operations and
budget address the administration of the SWDD, waste disposal,
hazardous waste management, and the administration of the
franchised waste collection companies. The refuse operations and
budget address the SWDD operated transport of residential waste
from five collection/recycling centers to the landfill. The
recycling operations and budget address the staffing of the
collection/recycling centers; the collection, processing and
marketing of recyclables; and the public education program for the
promotion of recycling.
1
FEBRUARY 3, 1997 BOOK. IU' qu
SOLID RASTE COZZECTION
The SWDD operates five (5) collection/recycling centers at the
locations illustrated in Figure 2. The centers are staffed and are
open five (5) days out of the week from the hours of 7:00 a.m. to
6:00 p.m. as follows:
SUN MON TIIE WED THU FRI SAT
Gifford
Winter Beach 7-6 7-6 Closed Closed 7-6
Roseland 7-6 7-6
Fellsmere 7-6 7-6 7-6 Closed
Oslo Closed 7-6 7-6
The centers accept household waste and yard trash from single
INDIAN RIVER COUNTY
SWDD
AMMSTRATOR SOLID WASTE DISPOSAL DISTRICT
SWDD ORGANIZATIONAL CHART
DIRECTOR
FISCAL YEAR 1996-97
IADMINISTRATION 8WD0 ADMINISTRATION
SECRETARY "I MANAGER ACCT. CLERK Of
ENVIRONMENTAL I PARTTIME - — LANDFILL RECYCLING
CHEMIST HIS STUDENT I SUPERINTENDENTCOORDINATOR I ASSESSMENT ADMINISTRATION
8CEISEC COORDINATOR SECRETARY If
I MAINTENANCE LANDFILL SCALE OPERATOR RECYCLING REFUSE EQUIPMENT
WORKER VI OPERATIONS (I POSITIONS) FOREMAN
(I POSITION) FOREMAN I I I FOREMAN MECHANIC III
(I POSITION)
MAINTENANCE I4FAW EQUIPMENT MOTOR EQUIPMENT MOTOR EQUIPMENT EQUIPMENT
WORKER Of OPERATOR II h OPERATOR h OPERATOR 1 MECHANIC It
(3 POSITIONS) (7 POSITIONS V POSITION) (3 POSITIONS) (I POSITION)
MAIMTENANCE HE/1W EQUIPMENT FIEAW EQUIPMENT WORKER NJ+ OPERATOR II OPERATOR I MAINTENANCEWORKER IV — MOTOR EQUIPMENT EOUIPMENT
(3 POSITIONS) (4 POSITIONS) (1 pOSITfOM (12 POSITIONS) OPERATOR II SERVICE OPERATOR
NS) (2 POSITIONS) (T POSITION)
TEMPORARY HELP MOTOR EQUIPMENT MAINTENANCE (MAINTENANCE HEAVY EQUIPMENT WELDER
SUMMER STUDENT OPERATOR 11 WORKER 111 WORKER VI OPERATOR II MECHANIC II
(I POSITION) (I POSITIO (2 POSITIONS)
W) (2 POSITIONS) (I POSITION) (I POSITION)
family residences and the following recyclables:
1.
Glass Containers
6.
Office --Paper
2.
3.
Newspaper
Aluminum Cans
7.
Corrugated Cardboard
4.
Bimetal Cans
8.
9.
Waste Oil
White Goods
5.
Plastic Containers
10.
Scrap Metal
2(
FEBRUARY 3, 1997
Figure I
Also accepted on a limited basis is household hazardous and bio -
hazardous wastes. To illustrate the volume of activity that occurs
at these centers- an itemization of materials received and
transported from these sites in fiscal year 1995-96 is provided in
Ezhibit I. During fiscal year 1995-96 the cost for transporting
waste from the collection/recycling centers was approximately
$362,039 and the total amount of material collected was 21,721
tons.
The SWDD oversees franchises/contracts with two commercial waste
collection companies, Harris Sanitation, Inc. and Treasure Coast
Refuse Corp. They provide waste collection service to commercial
and residential properties in the unincorporated area of the
County. The waste collection is a voluntary service for residences
as they have the alternative of utilizing the collection/recycling
centers operated by the SWDD or the commercial curbside collection
service. The residential collection service provided by the
franchised haulers includes a separate collection for household
garbage, and a separate collection for yard trash.
The household waste collection service is split into two service
areas as illustrated in Figure 3, with Harris Sanitation serving
the north part of the County and Treasure Coast Refuse serving the
south part of the County. Commercial collection service is
provided by either collection company throughout the unincorporated
area of the County to induce competitive pricing. To illustrate
the volume of waste and recyclables transported by the franchised
haulers, the material collected by these companies during fiscal
year 1995-96 is provided in Exhibit II.
The City of Vero Beach provides its own mandatory collection
service and the municipalities of Indian River Shores and Sebastian
contract their collection service. Exhibit II also illustrates the
volume of waste collected by the City of Vero Beach and the hauler
serving the City of Sebastian during fiscal year 1995-96.
SECTION 4
RECYCZWG OFERATIOZfs
The SWDD provides staffing at the five collection/recycling centers
under the recycling program. The staff provide the separation of
recyclables received into the centers as well as oversee operations
to insure safe and proper handling of waste and recyclables
received into the centers.
A curbside recycling collection service is provided to single
family residences and multi -family residences through contracts
between the SWDD and the franchised haulers. The SWDD oversees
these contracts and insures their proper execution. Harris
Sanitation serves the north part of the County and Treasure Coast
serves the south part of the County as illustrated in Figure 4.
Through interlocal agreement this service is also provided in the
municipalities. The service is mandatorily paid for through the
assessment process, however, participation is voluntary.
The recycling collection service consists of a 2 -bin bi-weekly
collection for single family residences and a weekly collection
from strategically located toter stations for multi -family and
mobile home complexes. These toter stations function similarly to
dumpsters only they are for recyclables instead of .garbage. The
haulers are responsible for separating the recyclables at the
truck.
The SWDD operates a recycling processing facility at the landfill
for the receiving, processing, baling, storage and marketing of
recyclables. The SWDD receives the various recyclables already
separated from the franchised haulers, and from the
collection/recycling centers. At the recycling processing facility
staff remove any minor contamination and then bale cans, plastic
and cardboard. The recyclables are stored and either shipped out
by SWDD staff to market or picked up by the buyers.
Exhibit III provides an itemization and the tonnage of recyclables
recycled by the SWDD and the private sector during fiscal year
1995-96. The total tons of material recycled fiscal year 1995-96
was 58,933 tons, approximately 32% of the overall wastestream.
Although we recycled 32% of the wastestream the Department of
Environmental Protection only recognizes 24% as they accept a
maximum of 15% for the recycling of mulch and scrap metal.
3
FEBRUARY 3, 1997 BOOK
The SWDD hired a Recycling Coordinator in compliance with the
requirements of the Florida Department of Environmental Protection.
The Recycling Coordinator's primary responsibility is tracking the
recycling of the private sector, coordinating the grant program,
and handling all of the public education and recycling promotion
programs. In fiscal year 1995-96 the SWDD spent approximately
$53,811 on the Recycling Education Program.
The overall recycling program, including the staffing of the
collection/ recycling centers, the recyclables processing and baling
operations, and the Public Education Program cost approximately
$1,719,195 in fiscal year 1995-96. The Florida Department of
Environmental Protection provides an annual Recycling and Education
Grant to reimburse some of the operational and capital expenses for
recycling. This grant does not require matching funds but is for
reimbursement of expenses only. This fiscal year the SWDD received
a recycling and education grant in the amount of $179,152.
LANDFILL DISPOSAL OPERATIONS
The SWDD operates two separate landfill sites within the 270 acre
area of the landfill. The primary disposal site is the Class I
landfill (approximately 25 acres) referred to__as Segment II. This
site receives all of the landfilled waste except for construction
and demolition debris. The construction and demolition debris,
consisting of materials illustrated in Figure 5, is disposed of in
a 20 acre construction and demolition debris landfill.
A third site that the SWDD has to maintain
term maintenance plan is the 20-25 acre
referred to as Segment I. Segment I was the
on the property and it opened in 1977 and
September of 1989.
under a 30 year long -
closed landfill area
original landfill site
was finally closed in
Segment II was constructed in 1989 and began receiving garbage in
July of 1989. This segment is expected to be filled by the
beginning or middle of 1998. Since this site receives Class I
waste the SWDD is required to have a Certified Landfill Operator
onsite at all times when the site is receiving waste. This site
has a 60 mil bottom liner that is designed to collect leachate from
the buried waste within the entire site. The leachate is
transmitted by PVC pipe to a collection station that pumps it to
the West Regional Wastewater Treatment Plant for treatment. During
fiscal year 1995-96 approximately 2,183,000 gallons of leachate was
collected and pumped to the West Regional Plant.
The construction and demolition debris landfill was opened in
January 1994 and is expected to be filled by September, 2007. This
site was issued a general permit that did not require a substantial
amount of permitting. The state, however, has recently modified
Chapter 62-701, Florida Administrative Code and is now requiring a
regular permit for a C&D site. As a result substantial engineering
is required and much of the operational requirements are the same
as that of a Class I landfill.
The long-term goal for the C&D site is to recycle this material
since in excess of 50% of it can be recycled. Materials that can
be recycled include concrete, bricks, cardboard, wood, shingles,
metal, and wallboard.
Figure 6 provides an illustration of the overall landfill property
and its various operational sites.
The SWDD currently has a construction permit from the Department of
Environmental Protection for the construction of a Class I infill
between Segments I and II. The SWDD's engineer, Camp Dresser &
McKee, is currently working on a Request for Proposals for a
qualified firm to construct and operate the infill. Once
constructed this infill will provide a disposal area for Class I
waste to the years 2000-2001.
4-
:.
FEBRUARY 3, 1997
r
All material entering the landfill is weighed across the scale
system and tracked by computer. The computerized tracking system
provides multifaceted reporting capabilities and can produce
related reports on material types, customer transactions and
vehicle types. The SWDD has several programs for tracking the
ongoing activities of the landfill, recycling, and collection
operations. The SWDD maintains all operational records and
notifications as required by Chapter 62-701, Florida Administrative
Code. Those records are available for public and regulatory agency
review and consist of, but are not limited to:
. Current and previous permits and applications
Monthly and quarterly waste records by component and aggregate
Leachate amounts, sampling, and analysis
. Rain gauge and weather station data
. Monthly landfill operating reports (FDEP monthly facility report)
. Annual estimates of remaining capacity (permitted disposal) in
cubic yards
. Landfill gas monitoring results
Regulatory agency landfill inspection reports
. Landfill design plan (short-term and proposed buildout)
. Groundwater sampling plan, including well location, construction,
and water quality sampling results
. All official notifications to or from FDEP regarding the landfill
facility
Training verifications and certifications
Landfill operations plan, including all supplementary material
incorporated by reference
. Random load inspection reports
. Solid Waste Master Plan
The SWDD operates 360 days a year and receives approximately 500
tons per day of waste and recyclables. To illustrate the types and
amounts of waste received a detailed spread sheet outlining the
overall wastestream of Indian River County for fiscal year 1995-96
is provided as Exhibit IV. A graphical illustration of the general
categories of material received in fiscal year 1995-96 is also
provided in Figure 7. A flow -chart of the various categories of
waste and recyclables processed by SWDD and the private sector is
illustrated in Figure B.
During fiscal year 1995-96 a total of 186,628 tons of material was
processed in Indian River County and 58,933 tons (32.3%) of that
material was recycled. Approximately 114,128 tons of material were
landfilled in the Class I, Segment II landfill and 33,280 tons of
material were landfilled in the construction and demolition debris
landfill.
SITE OPERATIONS
ADMINISTRATION AND MAINTENANCE
Administration and maintenance buildings were constructed at the
landfill in 1994 and 1995. The administration building is where
the offices for a majority of the administrative staff and foremen
staff are located. The building also has locker rooms, showers and
a lunch room for the employees that work in or out of the landfill
facilities.
The maintenance area consists of a heavy equipment repair building,
a truck repair building, and a vehicle and equipment washdown
facility.
5 � � v=-
tour.
FEBRUARY 3, 1997
I CA
HOUSEHOLD
HAZARDOUS WASTE
18 TONS
TOTAL
RECYCLABLES
58,933 TONS
RECYCLE MARKET
31,333 TONS
DIRT AND ASH
DAILY COVER
5,423 TONS
MULCH AS
DAILY
COVER
22,178 TONS
SOLID WASTE DISPOSAL DISTRICT
TOTAL WASTE PROCESSED
188,828 TONS
VEGETATION I - --. I - - -v
TIRES
64 8T TONS I 402 TONS
33,821 TONS LUCIE CO. SWDD
FIGURE 8
INCINERATED
CONTRABAND
49 TONS
WASTE DIRECTLY
CONSTRUCTION 6
RECYCLINGOLLECTION
DEMOLITION
CLEANC & D
SWDO AND PRIVATE
DEBRIS
11,343 TONS
18,447 TONS
35,287 TONS
TOTAL
RECYCLABLES
58,933 TONS
RECYCLE MARKET
31,333 TONS
DIRT AND ASH
DAILY COVER
5,423 TONS
MULCH AS
DAILY
COVER
22,178 TONS
SOLID WASTE DISPOSAL DISTRICT
TOTAL WASTE PROCESSED
188,828 TONS
VEGETATION I - --. I - - -v
TIRES
64 8T TONS I 402 TONS
33,821 TONS LUCIE CO. SWDD
FIGURE 8
INCINERATED
CONTRABAND
49 TONS
WASTE DIRECTLY
CONSTRUCTION 6
TO CLASS I
DEMOLITION
LANDFILL
DEBRIS
84,187 TONS
35,287 TONS
MULCH INCINERATED ICONTAMINATEDN(STOCKPILED
28,720 TONS i�T
ONS I 3.538 TONS 118 TONS 14,140 TONS
--- STOCKPILED TIRES
TIRES PROCESSED
IRT
D 6 ASH ASH 397 TONS 584 TONS
15.423 TONS 71 TONS
IF
TIRES TIRES TO TIRES RECYCLED
SWDD RECYCLE LANDFILLED ST LUCIE AS FUEL
23,472 TONS 205 TONS 34 TONS 521 TONS
PRIVATE RECYCLE
7,80 TONS
A88E C 08 r 4REAS oGRIT I GARBAGE
8,074 TONS
CLASS I LANDFILL
SEGMENT I
114,128 TONS
WASTESTREAM FLOW -CHART FISCAL YEAR 1988-98
CONSTRUCTION AND
DEMOLITION
CLASS 1 LANDFILL
2,018 TONS
J CONSTRUCTION AND
DEMOLITION
LANDFILL
81,280 TONS
SOLID WASTE DISPOSAL DISTRICT
WASTE COMPOSITION RECEIVED
FISCAL YEAR 1995-96
SPECIAL 0.0%
50.0 TONS
C & D MATERIAL 19.8%
35,297.0 TONS
GARBAGE 44.8%
80,074.2 TONS
TIRES 0.2%
402.0 TONS
RECYCLABLES 11.2%
19,930.0 TONS
SLUDGE 2.3%
4,112.0 TONS
vtut I A I10N 21.7%
38,821.0 TONS
WASTE TONNAGE BY CATEGORY Figure 7
WASTE TIRE OPERATIONS
A waste tire processing area consisting of a tire storage area and
tire shredder is located adjacent to the recycling facility.
Florida Administrative Code prohibits the disposal of whole tires
in a landfill thereby necessitating a means of cutting or shredding
tires before their disposal. Heavy equipment tires are cut in
pieces using a large shear that mounts on a backhoe. Auto and
truck tires can be shredded with the tire shredder, however, we are
now sending the tires to a private company for processing. The
company provides truck trailers at the tire facility and we load
the tires on the trailers using prisoners from the State
Correctional Center. The company then transports the tires to its
facility for shredding; then they are shipped to an industrial
facility for use as fuel.
The SWDD receives a waste tire grant from the Department of
Environmental Protection which more than pays for the waste tire
operations. This fiscal year the SWDD received a grant in the
amount of $59,734. The grant is non-matching and can only be used
to reimburse the SWDD's expenses in waste tire management.
7
FEBRUARY 3, 1997od.
VEGETATION DEBRIS
Vegetative debris is normally received as land clearing debris,
yard trash, or wood chips. The vegetation cannot be disposed of in
a Class I landfill therefore the SWDD either incinerates the
material or shreds it into mulch for recycling.
Vegetation constituted 21.75 of the wastestream in 1995-96. The
volume of this material is overwhelming and the SWDD is
investigating the privatized mulching or recycling of the material.
The equipment required to process this type of material is
extremely expensive and has very high operational and maintenance
costs. It is the intention of the SWDD to compost this material
which likewise is a costly and time consuming process. The volume
of the material that we have received has far exceeded our
capabilities handling and we presently have over 30,000 tons of raw
material stockpiled and twice that amount shredded and awaiting
recycling.
Some of the material that was shredded and stockpiled in the past
has degraded to the point where a trommel screen is now used to
screen the material and recover organic dirt. This dirt is used
for daily and intermediate cover in the Class I landfill and the C
& D landfill.
HOUSEHOLD HAZARDOUS WASTE
A household hazardous waste processing and storage building was
constructed in 1990. The SWDD has a full time chemist and
assistant that collect hazardous waste that the residents leave at
the five collection/recycling centers. This material is safely and
properly stored in the hazardous waste building on a daily basis.
When sufficient material is collected a contracted, licensed
hazardous waste hauler packs and manifests the material; then
transports it to disposal facilities for proper disposal. In
fiscal year 1995-96 the SWDD disposed of 36,000 pounds of household
hazardous waste and recycled 59 tons of batteries and 55 tons of
waste oil.
BORROW PIT
The solid waste must be covered on a daily basis with a soil
material or other authorized substances to control odors, insects
and animals. The SWDD operates a borrow pit that is now being
closed out and transformed into a stormwater management area.
Three additional borrow pits have been approved by the St. Johns
Water Management District. Operation of these pits will soon
proceed to obtain additional soil for daily cover. When soil
material cannot be obtained from the in-house borrow operations it
is purchased from local mining companies.
The solid waste operations are regulated by numerous local state or
federal agencies in almost every aspect of operations. Exhibit V
provides a list of the regulatory agencies and the different state
and federal laws and rules that apply.
Along with the regulatory requirements are permitting and reporting
requirements.. Figure 9 is an itemization of the permits under
which the SWDD operates. Each of these permits contains its own
reporting requirements and every permit generally requires the
services of a professional engineer.
The permits issued by the Department of Environmental Protection
and the US Environmental Protection Agency require extensive
monitoring of the groundwater, surface waters, and the leachate
that is generated by Segment II. The sampling varies from monthly,
to quarterly and semi-annually. In addition to the analytical
requirements a report has to be prepared every other year by a
professional engineer outlining or addressing any changes or trends
in the analytical results.
The analytical requirements can vary in cost from $25,00 to $30,000
per year.
FEBRUARY 3, 1997
S01M WASTE ASSESSMENT SYSTE�►t
The adoption of Ordinance 87-67 provided the mechanism for
residents to dispose of solid waste at the County's landfill,
including measurement of waste volume and associated assessments.
The mechanism is further detailed as SWDD Operational Procedures in
SWDD Resolution 95-1 (Exhibit VI). The basis of the assessment was
the equivalent residential unit (ERU), which was defined as the
amount of solid waste generated annually by an average single-
family unit. In 1989, SWDD was authorized by ordinance to change
the assessment system from ERUs to waste generation units (WGUs).
Annual solid waste assessments are formulated on the basis of a
WGU, which is defined as a basic unit of waste generation
equivalent to 1 ton per year. Commercial properties are assessed
a waste generation rate based upon the use, or uses, of the
property and the square footage of the structures, or portions
thereof, that are in use. Pursuant to Resolution 95-1, the waste
generation rates for commercial properties are applied as WGUs per
100 square feet of structural space. Waste generation rates for
residential structures are applied at a rate of 1.6 WGUs per single
family residence and 1.2:WGUs per multi -family unit or mobile home
park unit. The current fee schedule is $49.32 per WGU for
residential customers and $35.64 per WGU for commercial customers.
The additional charge per WGU for residential customers covers the
cost of providing curbside recyclables collection. For residential
customers the fee structure calculates to an annual fee of $78.91
for single family residences and $59.18 for multi -family and mobile
home park residences. Figure 10 provides a recap or parcel listing
of the various use codes with a breakdown of the total WGUs and
revenues for each use code.
Pursuant to Section 7 of Ordinance 87-67, all assessable
Properties
receive benefits from the availability of SWDD and areassessable
whether or not the property generates waste. Commercial
are authorized credits for vacancy and recycling as properties
Resolution 95-1, while residential properties are not all wed such
credit. Vacancy credits may be applied to an assessable commercial
property for vacancies exceeding 6 months within the calendar year
Prior to the year the assessment is due.
equivalent to the tons of material recycled may also be Recycling
credits
commercial properties for material recycled in the calendar year
prior to that in which an assessment is due, applied to
circumstances is a property or business to receive vacancy or
Under no
recycling credits that would reduce its assessment below the
Readiness to Use Fee of $21.63 per WGU. As such, no business or
Property can receive credits in excess of 39percent of the
original annual assessment.
The assessable status of each property located within SWDD is
determined annually on January 1 by the Property Appraiser's
Office. When a property that is not assessable on January 1
becomes assessable, or when property
property's use classificationa improvements change the
,
prorated solid waste fee is
applied to the property. Upon remittance of the solid waste fee a
Certificate of Occupancy may be issued by the
Department. Prior to issuing Certif cates County Building
participating communities collect solid waste assessments Of anand
forward the funds to the SWDD Assessment Coordinator.
The SWDD Assessment Coordinator and a Secretary are located at the
County Administration Building where they are in close proximity to
the Building Department, Property Appraiser's office and the Tax
Collector's office. It is their responsibility
following activities related to to handle the
the to
Roll:
1• Collect and process solid waste fees when Certificates of
Occupancy are issued.
2• Investigate complaints regarding assessments.
3• Coordinate with the Property Appraiser's office, and Tax
Collector's office, in the investigation, updating and
correction of assessments.
4. Provide annual updates of the assessment roll to incorporate
new businesses that received Certificates of Occupancy the
previous calendar year.
5. Verify and process credits for vacancy and recycling on non-
residential properties.
�*7
FEBRUARY 3, 1997 ^ ;
u
On May 1 of each year, SWDD provides to the Property Appraiser's
Office all assessment roll changes that reflect the status of
commercial properties that received Certificates of Occupancy,
vacancy credits, and recycling credits in the previous year. By
June 1 of each year, SWDD receives from the Property Appraiser's
Office a preliminary assessment roll for review of errors. B
1 of each year, SWDD provides to the Property Appraiser's Y July
corrected preliminary assessment roll. PPraiser s office a
Waste Landfill Assessments is included in the PropertyOf A annual Solid
annual non ad valorem notice. owners PPraiser s
to contest Solid Waste Landfill 1 ssessm nt by erty eithereconferrthe ing
with SWDD staff to correct an error or b
contest the assessment. The Tax Collector (collects Inato
etannual
Solid Waste Landfill Assessment by the same procedures used to
collect the ad valorem taxes. Disposal charges for State-owned
Properties are collected by SWDD through the issuance of an annual
invoice each November.
During Fy 1995, SWDD performed a waste composition analysis and an
evaluation of the inplace solid waste assessment program which
resulted in the development and adoption of Resolution No. 95-01.
Resolution No. 95-01 replaced and supersedes Resolution No. 91-01.
Resolution No. 95-01 made two significant changes in the assessment
Program.
1. Property Classification and Use
Modifications included changes in the waste generation
were modified.
several classifications and generation rates for
classifications. the addition of some new
2• An assessment appeals program was established.
Provides the authority to perform surveys and implement hh program
c anges in
waste generation rates when deviations of
above or below the waste generation rate can
BILLING SYSTEM
more than 30 percent
be substantiated.
SWDD operates a computerized system database for account tracking,
billing, and waste stream tracking. All transactions occurring
within the landfill are entered into the landfill computer. The
incoming waste stream is classified into individual material type
identifiers so that staff can track numerous waste types as well as
recyclables. Customers and vehicles that regularly use the
landfill are assigned an account number and vehicle number.
An
account number may have multiple vehicle numbers. Customers who
rarely enter the landfill are processed under a default account
number.
During FY 1995, with the opening of the new landfill administration
Office, the majority of the computerized account tracking functions
that had previously taken
lace at the Building were moved to the landfill administration on office. At the
end of each day, the scale operator backs u
files and sets the computer u P the computer data
administration office. P for communications to the landfill
modem to the landfill administiaon office transactions are communicated by
112, after receiving the transactions, reviewsD them. Isc and Clerk
corrections as needed. Weekend transactions are communicatema
d kes
the landfill administration office on Monday.
After reviewing the transactions and making necessary corrections,
the account clerk prepares files for data
the corrected transactions for Processing and forwards
ent
tracking is performed b Processing. Billing and
tracking system allows by
he Finance Department. The computerized
data ito ngts landfill administration
entry and forwarding of transaction
Data Processing and Finance Department inithe Coce unty
to the
Building. The system y dministration
such that the provides a multi -faceted reportingca
system can be queried and can Pability
reports on material type, customer transaction, and vehicle de ttype.
FEBRUARY 3, 1997
10
+'
� r
M M
REVENUES AND EXPENSES
REVENUES
The SWDD operates under an enterprise fund and the primary source
of revenues is the solid waste assessment on developed properties
that is collected by the Tax Collector. The estimated revenues
from the assessments for this fiscal year are $6,166,699.
Additional revenues are collected daily for new construction as
certificates of occupancy are issued. New construction is charged
a prorated fee for waste disposal covering the period from issuance
of CO to when the new construction is on the assessment roll.
There are materials such as construction debris, landclearing
debris, tires, etc. that are not covered under the assessment
program and these materials are charged a tipping fee on being
brought into the landfill. The tipping fee schedule is provided in
Figure 11.
For an example of the revenue sources and their amounts Figure 12
outlines each revenue source and the estimated amounts for fiscal
year 1996-97.
EXPENSES
As previously discussed the operations of the SWDD are broken down
into three (3) different budgets consisting of Landfill, Refuse,
and Recycling. The expenses under each of these budgets are broken
down into numerous individual operational expenses. Last fiscal
year the actual expenses for solid waste management were as
follows:
LANDFILL $3,626,804
REFUSE $ 362,039
RECYCLING $1,719,195
TOTAL 55.708.038
An illustration of these expenses for fiscal year 1995-96 is
provided in FIGORE 13 ..
CLOSED LANDFILLS
The Florida Department of Environmental Protection (DEP) required
the County to conduct an investigation of the groundwater
conditions at the Closed Gifford Landfill. This investigation
included a hydrogeologic survey and construction of approximately
eighteen groundwater monitoring wells around the landfill. The DEP
has recently agreed to allow the County to monitor the groundwater
at the Gifford Landfill for two years in order to evaluate the
contamination conditions, and further, evaluate the need to develop
a groundwater cleanup operation.
The professional services of Brown and Caldwell were used to
investigate the conditions at the Gifford site and they have a
continuing services contract with the County to perform groundwater
investigations for another year and a half.
As noted in the letters provided as Exhibit VII the DEP is now
requiring the investigation of four other closed landfill sites,
more specifically:
1. Oslo Landfill
2. Winter Beach Landfill
3. Wabasso Landfill
4. Roseland Landfill
A research of our files revealed that all four of these sites were
in fact landfills and they were all closed in 1977 under the
Provisions of Temporary Operating Permits issued by the Department
of Environmental Regulations. Figure 2 illustrates the locations
of these landfill sites since the Collection/Recycling Centers are
located on these closed landfills.
it
discussion on each of the old landfill sites. VIII provides a
e in
from old files that are available in the SWDD_recordsfotion is
11
B00 100 PACE
FEBRUARY &�
FEBRUARY 3, 1997
1996/97 PROPOSED BUDGET - SOLID WASTE DISPOSAL DISTRICT
FUND 411
REVENUES
$49.32
91 95/96
PROPOSED
1996/97
INCREASE
(DECREASE)
343-041
GARBAGE SOLID WASTE SALES
$0
$5,000
$5,000
343-042
DEMOLITION CHARGES
$700,000
$650,000
($50,000)
343-043
TIRE DUMPING CHARGES
$61,000
$30,000
($31,000)
343-045
RECYCLING SALES
$400,000
$300,000
($100,000)
343-047
SEPTAGE/SLUDGE DISPOSAL
$50,000
$50,000
$0
343-048
CONTROLLED SUBSTANCE -
$10,500
$5,000
($5,500)
343-092
LOT CLEARING REVENUE
$40,000
$40,000
$0
361-010
INTEREST -INVESTMENTS
$300,000
$350,000
$50,000
361-032
INTEREST -TAX COLLECTOR
$9,000
$9,000
$0
363-040
LANDFILL ASSESSMENTS
$150,000
$160,000
$10,000
363-120
SERVICE ASSESSMENTS
$5,927,997
$6,166,699
$238,702
389-030
LESS 5% EST. RECEIPTS
($382,424)
($388,285)
($5,861)
389-040
CASH FORWARD - OCT. 1
$369,000
$226.498
«Ia9 -s;roi
LUMEN L4L-WAMoMJFRA-MnVmart(w.a.u)
$49.32
49.32
0
EXPENSES
$78.91
178.91
$0
209 REFUSE
217 LANDFILL
$575,465
$551,139
($24,326)
255 RECYCLING
$6,331,068
$1,936,240
$5,538,502
$2,276,289
($792,566)
$340,049
SUB -TOTAL EXPENSES
$8,842,773
$8,365,930
($476,843)
LESS CAPITAL OUTLAY
$1,207,700
$762,018
$445,682
TOTAL EXPENSES
17.635.073
47 an% 04 3
.&d%.d A A%
LUMEN L4L-WAMoMJFRA-MnVmart(w.a.u)
$49.32
49.32
0
NMLA .Fairx�sznarnnc v�nrc�Ru�
$78.91
178.91
$0
RESIDENTIAL W.G.U.
COMMERCIAL W.G.U.
$49.32
$49.32
$0
$35.64
$35.64
$0
NUMBER OF RESIDENTIAL W.G.U.'S
74,980
77,847
NUMBER OF COMMERCIAL W.G.U.'S
2,867
TOTAL W.G.U.'S
W.G.U. = ONE TON
62,570
137,550
65,299
2,729
143,146
5,596
/dc
97BUDGET/123
FIGURE 92
Director Pinto commented that every year there are new and
more complex regulations and the extremes of the government are
just getting more extreme.
Commissioner Macht questioned the composition of the 40 tons
of contraband, and Director Pinto explained that could be any sort
of contraband brought in by any of the law enforcement agencies.
1e� 'ri
12 EUOK �-U'� F'AGE 4
FEBRUARY 3, 1997
SWDD is under contract with the state for this service and federal
police are present to guard the contraband until they are sure it
is burned.
WATER AND WASTEWATER SERVICES
Director Pinto briefly described the County's water treatment
plants and plans for future development:
The treatment level required by the water plants is dictated by the Safe Drinking Water Act. The
water treatment in Indian River County is state of the art Reverse Osmosis. The county currently
operates two Reverse Omosis (R.O.) Plants ( S. County R.O. and N. Beach R.O.). Currently, the
N. Co. plant is under construction and the N. Beach plant is being prepared for demolition. (See
N.CO R.O. Plant construction and repump and storage facility). Exhibits are attached depicting
the R.O. process for your information. Over the past 10 years, since the construction of the
county's first R.O. facility, the South County R.O. plant process technology has dramatically
evolved. Through a staff conducted membrane piloting plan, we were able to determine the best
membrane on the market to meet our needs. (i.e. membranes operated at 300-500 psi). Through
this effort and in conjunction with our engineers, the operating pressure has been greatly reduced
to approximately 150 psi reducing overall water production costs. (See South Co. R.O. Exhibit
and report titled Low Cost Membrane Softening by William Suratt, Terrance Pinto, Brad
O'Keefe). The first low cost membrane system was installed in the S. CO. R.O. plant with full
computer controls. The greatest draw back to the R.O. process is the disposal of the reject or
brine stream. Staff in conjunction with our consultant, piloted a custom treatment system for this
side stream treating the discharge into the Indian River. This treatment process is new and
working very successfully to meet state and federal permitting requirements.
FUTURE DEVELOPMENT
The County owns and operates five RO plants and is interested in further
reducing construction and operating coats by applying this knowledge to treat the
concentrate from existing and future plants. The County is also planning to
apply these designs to H2S removal from the permeate in lieu of conventional
packed tower degasifiers and odor control units. The following additional tests
have been proposed for the near future:
1. Conduct experiments to determine the amount of the sulfatelelemental
sulfur split and the changes in concentrate turbidity after treatment, if any.
2. Explore the use of thiosulfate and ferric chloride addition for obtaining
higher percentages of sulfate and less elemental sulfur. This is important in
minimizing the formation of turbidity in the finished water storage tanks.
3. Obtain additional information with operating at different pressures and
flows.
13
FEBRUARY 3, 1997 eooK ;Act 439
SWDD is under contract with the state for this service and federal
police are present to guard the contraband until they are sure it
is burned.
WATER AND WASTEWATER SERVICES
Director Pinto briefly described the County's water treatment
plants and plans for future development:
REGIONAL WATER TREATMENT PL NTS
The treatment level required by the water plants is dictated by the Safe Drinking Water Act. The
water treatment in Indian River County is state of the art Reverse Osmosis. The county currently
operates two Reverse Omosis (R.O.) Plants ( S. County R.O. and N. Beach R.O.). Currently, the
N. Co. plant is under construction and the N. Beach plant is being prepared for demolition. (See
NCO R.O. Plant construction and repump and storage facility). Exhibits are attached depicting
the R.O. process for your information. Over the past 10 years, since the construction of the
county's first R.O. facility, the South County R.O. plant process technology has dramatically
evolved. Through a staff conducted membrane piloting plan, we were able to determine the best
membrane on the market to meet our needs. (i.e. membranes operated at 300-500 psi). Through
this effort and in conjunction with our engineers, the operating pressure has been greatly reduced
to approximately 150 psi reducing overall water production costs. (See South Co. R.O. Exhibit
and report titled Low Cost Membrane Softening by William Suratt, Terrance Pinto, Brad
O'Keefe). The first low cost membrane system was installed in the S. CO. R.O. plant with full
computer controls. The greatest draw back to the R.O. process is the disposal of the reject or
brine stream. Staff in conjunction with our consultant, piloted a custom treatment system for this
side stream treating the discharge into the Indian River. This treatment process is new and
working very successfully to meet state and federal permitting requirements.
FUTURE DEVELOPMENT
The County owns and operates five RO plants and is interested in further
reducing construction and operating costs by applying this knowledge to treat the
concentrate from existing and future plants. The County is also planning to
apply these designs to H2S removal from the permeate in lieu of conventional
packed tower degasifiers and odor control units. The following additional tests
have been proposed for the near future:
1.. Conduct experiments to determine the amount of the sulfate/elemental
sulfur split and the changes in concentrate turbidity after treatment, if any.
2. Explore the use of thiosulfate and ferric chloride addition for obtaining
higher percentages of sulfate and less elemental sulfur. This is important in
minimizing the formation of turbidity in the finished water storage tanks.
3. Obtain additional information with operating at different pressures and
flows.
13
FEBRUARY 3, 1997
Development of Rates and Budget Administration
Controller Ted Monroe stated that in 1984 the County's plant
investment was $13,000,000, growing to $156,000,000 in 1996, an
increase of $143,000,000 since 1984:
The County's customer base has doubled from 1988 to 1994:
14 n 1 1-1 , _ .-
FEBRUARY 3, 1997
� r
Utility Generate. dIflevepues
Paid to CountyFund :
1995/96
♦ 6% Franchis Fee $81 1 ,83
♦ General '& Administrative; $47 1' 1 I
♦ Rent $ 50,920 .
♦ Self Insurance Fund 185 440
Total $1";$'l 8X4
Utzlz
Current
i
Billing Charge/Per AccQuut
Y: $200
♦ Base Facility Charge/Per ER"'
♦ Volume-Charge: , , 4 a }
0 to'3,000 Gals Per Month .,
♦ 39001 to 79000 Gals PerMon
X2:15
Over 75000 Gals:Per'Wht .
M255
♦`Excess Volume Charge;
♦ Volume Surcharge For Use Greater
Than 139000 Gals Per Month $2.30
Curr
ent Utili Rates
7;
Wastewater.
♦ Billing Charge/Per Account- _$ 11pp
♦ Base Facility Charge/Per EAU s $13.50 ,
♦ Volume Charge: Per 1,000 Gals
Calculated as 85% of Water Use -
.y
109000 Gals Per Month Max. for
Residential Customers
Excess Volume Charge:
♦ Volume Surcharge For Use Greater
Than 11,000 Gals Per Month $ 4.45
Explanation of Rate Components an.
Fees
♦
Eouivalent Residential Unit ERCT
♦ The amount of water used Waswl'
produced b �. j
p. d Y a 1Yp��ai e� enTI r ,
water use ranges,,.froom
Y}
•.. ; ,j �
da bass 2
on a maximum'.
y
on a maximuxn � � M
month
r
RESIDENTIAL- UTILITY
s _
- CHARGES s� `w ,
- x
A a
Average Resiuentiai =Bill 5,000`' 'fats. 'per f
. �� g
M usag77
e:
vv
♦ Sewer $290-74
6% Co. Surcharge S 303
Total $53052
Development of Customer Base
Utilities Director Terry Pinto emphasize that fire flow
capacity determines the requirements for water capacity.
Commissioner Tippin recalled that the Board authorized
expansion of the utilities department because DEP said we were at
some percentage of capacity vs dry lines.
Director Pinto stated that the department was below 50%
capacity but DEP said the county was maxed out. Negotiations were
held with DEP and we refused to sign the part of the permit that
said we had that amount of committed flow. The Comp Plan requires
that when we use 50% of our capacity, we have to start designing
the next expansion and when we reach 80%, we have to start
construction. This is a self-supporting utility which only
collects what we need to pay required expenses. Impact fees are
also an expense requirement covering the cost of providing new
capacity for new customers. Studies which indicate that our fees
are high in comparison to other counties do not take into account
that our system is entirely new while some communities have
facilities which were built many years ago. Also, other counties
have impact fees which are called by other names.
In response to Commissioner Ginn's question regarding the use
of revenue bonds, Director Pinto explained that in many instances
even though there are existing utilities which are taken over by
the county, the customers are still new customers and the county
has to provide new capacity. The County has set up a 10 -year
payment plan without incurring the funding cost of setting up
bonds.
17 FU -e,.
FEBRUARY 3, 1997
L
Chairman Eggert questioned the funding of distribution lines,
and Director Pinto explained that impact fees pay for plant
capacity, then distribution lines down a street are assessed to
those parties owning property on that street. All impact fee and
assessments are allowed to be financed over a 10 -year period. In
the case of a mobile home park which has an existing system, the
impact fee pays for the capacity of the treatment plant and there
is no assessment for internal lines because they already exist.
Graphical Information Systems/Infrastructure Management Systems
GIS Coordinator and Supervisor Terry Drum presented the
following:
GIS/Mapping Division - Integrating GIS & IMS
When the Utilities Department was formed, asbuilt drawings were required.
Asbuilts were completed to provide us with the location of the utility that was built
during recent construction. As you see on the monitor; displayed is a record asbuilt
drawing submitted in the mid 1980's. Asbuilts like this were stored in large flat
tiles as they are today.
(Asbuilt slide)
To obtain information from these drawings, individuals would come into the
Department of Utility Services and request it. A search of the flat files would then
begin and the information would be provided sometime later when the drawing
was located. This searching method has been automated with the introduction of
the Graphical Information System (GIS) to the Department of Utility Services.
In the mid 1980's, the Department of Utility Service's Utility Director, Mr.
Terrance Pinto, envisioned combining maps and utility information to streamline
the functions of the Department of Utility Services. We, the staff of the
Department of Utility Services, greatly appreciate his insight and direction along
with the Board of County Commissioners for their support and approval along the
way.
With this in mind, the Department of Utility Services, along with the Indian River
County's Property Appraiser's Office began researching the market for the best
GIS system that would fulfill our total and specific department needs.
What is GIS.)
A computer system capable of holding and using data describing places and objects
on the Earth's surface. For the Department of Utility Services, these places and
objects are the facilities we own and maintain. This is our Geographical
Information System, or GIS.
(overall utility map slide)
What is IMS?
To support the operation and maintenance of these facilities, the Department of
Utility Services maintains a variety of maps and records. These include
construction and asbuilt drawings, water and sewer system base maps, customer
complaints, work orders, accounting records and much, much more. This is the
Infrastructure Management System, or IMS.
FEBRUARY 3, 1997
As the Department of Utility Services addresses the challenges of a growing
customer base, increased regulations and the task of accomplishing more with
fewer resources, adding to the record keeping system became a high priority.
The Indian River County Government has implemented Graphical Information
System Technology to automate the production and up -dating of maps. Indian
River County parcel maps were completed by the County's Tax Assessor's office
in late 1993. These maps provide a back drop for our department's County Utility
Facilities.
(parcel map slide)
The Department of Utility Services saw itself participating in the county's GIS to
improve its facility's management effectiveness.
To prepare for this, the GIS/Mapping Division has acquired the following
hardware and software. The GIS/IMS graphic applications are based within an
1BM" RISC 6000, model 590-1 Unix operating system. This main computer has
6 two -gig hard drives and 192 million bytes of memory. Connected to this main
computer are three (3) "LBM" X -stations and seven (7) personal computers.
To utilize all software applications on these PC's, a minimum of 32 megabyte of
memory should be used. This division utilizes 2 "Hewlett Packard" 650C color
plotters for it's graphic requirements and an "Anatech" 800 dpi scanner for the
scanning and input of digital maps into the GIS system. This scanner is also
utilized to generate digital CAD drawings for the input and updating of the GLS
data base. Smaller local engineering firms that are not outfitted with computers to
generate drawings will use this valuable resource. This will allow for the
continuation of the Board approved requirement that all utility asbuilts be
submitted in digital form. This process is fast and economical for all involved.
Determine the equipment and hardware needed
In assessing the utilization of the infrastructure management system, we
determined that each division could access all available resources using the existing
token ring network. The Department of Utility Services also concluded that the
most feasible and cost effective way for our plant satellite workstations to connect
was through modems. The scope and extent of the GIS/IMS operations involved
the number of users, their location, applications and databases. (Token slide)
During initial research, we learned that software had been developed that allowed
the graphical link between its infrastructure management software and the
geographical information system already in use. This gave us the much needed
compatibility between our WINDOWS -based operating system and our UNIX -
based operating system.
(IMS slide)
(GIs slide)
Consider the impact on all divisions
Being the major water & wastewater -utility in Indian River County, planning
for the infrastructure management system required several months. We discussed
many topics that needed addressing before its achievement. We asked ourselves;
"'what are the needs of each division and what impact will the infrastructure
management system have on them?" We then carefully assessed all thoughts and
resources that would fulfill those demands and direction.
The initial step in developing our infrastructure management system support was
to consider our organizational structure and the assignments and objectives of each
division within the organization.
(basic organizational chart slide)
The ultimate step was to establish standards and job duties that would help
each division staff member understand how to fulfill their part in this sound
19
FEBRUARY 3, 1997 goer. r �'bG-t. 440
infrastructure management system. The operating, reporting, maintenance, and
Procedure that control applies to this GIS/IMS structure.
DIVISION SUPPORT
♦ Management
In applying the GIS/IMS system, Management is capable of analyzing the
growth areas for new facility construction throughout the utility service area. With
the ability of monitoring the divisions, Management can also streamline the
functionality of the system. (Management slide)
• GIS/Mapping
The GIS/Mapping Division plays the mayor role of implementing the GIS and
IMS system. As the location for the host computers for other divisions, this
Division is the overseer of most data entered into the system. (GIS slide)
The GIS staff performs the review of data of all incoming as -built drawings
received by the Department of Utility Services. Our division is also in charge of
maintaining the database files, the creation of all water and wastewater maps, in-
house utility engineering design support and the SCADA mapping and GPS
support. This division is also the location of all GIS workstation connections for
the satellite plant and warehouse locations.
Customer Service
The Customer Service Division will play an integral part in expanding and updating
the IMS database for the Department of Utility Services. The PC that will connect
to the system shall provide an access to the Geographical Information System.
With this connection, Customer Service will not only be able to enter billing
information, generate work orders and accounting functions but will have the
capability to view maps and locate existing water and sewer lines. The AS400
connection that is already on-line will further enhance our GIS/LMS system with
the uploading of valuable customer intbrmation not readily available on the system.
(Customer Service slide)
Engineering
The Engineering Division will utilize the water and wastewater models to
accomplish engineering functions for future expansion of the existing utility
system. (Engineering slide)
Assessment
Obtaining land parcel data for the assessment of water and wastewater projects is a
major asset to this part of the engineering division. (Assessment slide)
♦ Inspection
Providing information by the system will be a prime asset to the Inspection
Division. Inspectors will be able to analyze existing utilities along a designed or
proposed utility route. (inspection slide)
♦ Utility Maintenance
The Utility Maintenance Division is responsible for installation, maintenance,
and location of utility facilities. The Utility Maintenance Division is also
responsible for maintaining inventory control records of all parts and materials
kept at the utility supply warehouse. This input will update the LMS system daily.
The supply warehouse will access the system with a PC workstation and modem
connection to the host computer. (Utility Maintenance slide)
20 ROOK f' Gr 4�
FEBRUARY 3, 1997
• Water Production
Information that the Water Production Division will require is soon to be
available with a modem connection to the host. They will be able to monitor the
progress of Master Plan line construction, the maintenance of existing water mains,
and corresponding labor costs. (Water Production slide)
• Wastewater
With access to the sewer model now complete, the Wastewater Division is
able to monitor associated labor and material costs in the maintenance of utility
sewer mains, valves, manholes, and liftstations. Using the software available on the
host computer will bring graphics to their PC workstation. This capability
enhances the productivity and ability to save time and labor in many areas.
(Wastewater slide)
CHART SHOWING PERCENT OF DIVISION USE.
G1SAMS Division Utilization
Utility Maintenani
Water Production
Wastewater
io
0 /o 50% 100%
Public accessibility.
Our utility has installed a large percentage of its facilities in the past five years
and currently provides water and sewer service to the population that have access
to these utilities. Indian River County. Engineers, contractors, developers, and Re-
altors have a continuous requirement for utility location information. The water
and wastewater facilities have now become more obtainable with this GIS/LMS
data and arranging for a customer workstation for this purpose is in future plans.
Research is also being done to obtain information in the creation of a utility web
page to access our valuable utility information
Ability to expand.
When directing our thoughts and ideas, we concluded that our first priority was
to expand our computer system to its maximum capabilities. We expanded the
systems memory from 64 mb to 192 mb of memory. The hard drives, which now
include 6-2.0 gb hard drives will soon include two additional drives with the
upgrading of the host computer in mid-February. With this accomplished, future
connections will not slow down the system. The Department of Utility Services is
always looking ahead to the latest technology, but is sometimes limited by budget
restraints.
INTEGRATION & INTEGRITY
Populating the GIS database with items necessary for linking the IMS database
will result in the integration between the GIS and IMS databases. As a conse-
quence, the GIS and IMS databases, although physically separate, will logically
function as one database.
(GIS/IMS database slide)
21
FEBRUARY 3, 1997 KOK IWO FACE 447
L_
The GIS data input files are stored in one database location and the IMS data input
files are stored in another. A programming routine, that is implemented to ensure
accuracy, allows the two databases to combine and create the GIS/IMS data files.
These files are the graphic displays you see here this morning.
(overall base map slide)
In GIS, a map of a particular data feature, such as a waterline, can be thought of as
a layer of information. In our GIS software these layers are called coverages.
(graphic coverage slide)
(actual hydrant map slide)
Data Base Management
The database files, updated from the input of data by each division, must be
monitored and maintained by the system administrator. It is an important part of
the GIS/IMS integrity to preserve database files in one central location for the re-
view and backup by the system administrator. With this authorization given to me
as the system administrator I provide the conformity to manage permissions and
retain the standard directory structure on the system.
(!MS screen slide)
CONCLUSIONS
The characteristics of our Geographical Information System required access to
our existing database. The GIS database was not accessible from our external IMS
application. With the new GIS/IMS system soon to be totally on line, Indian River
County Department of Utility Services will be able to integrate into its daily
operation a sound GIS & Infrastructure Management System. I'm also very proud
to say that Indian River County Department of Utility Services, GIS/Mapping
Division is one of the leaders in the State of Florida and the nation for the linking
of it's Infrastructure Management System to it's Graphical Information System.
Our presence in this field is well known by other municipalities throughout the
state and nation; as we have been approached and participated in the presenting of
our knowledge and expertise in the GIS/IMS field on a national level. A paper I
authored with the input of the past Assistant Utility Director and the Utility
Director was published in the 1996 Journal of the Urban and Regional Information
Systems Association of which 1 am a member. l might also add that during the next
two weeks the city of Boca Raton will be visiting our division for the instruction
on our GIS/IMS integration.
As a result of improved infrastructure management, our system users can identify,
maintain, and map all water and wastewater facilities. While the integrated
GIS/IMS and network system are proving favorable for our organization, it is
important to try and envision future activities within the organizational structure.
Displayed is an aerial that can be stored within the GIS system. These aerials,
when obtained, will be a valuable assets to the Department of Utility Services.
They will be stored within the system in the State Plane Coordinate System, which
will provide a much accurate mapping system. With this understood, the following
principles were inserted into the planning stages:
• Consider the basic purpose of the infrastructure management system within
the organizational structure.
• Accommodate for advanced technology.
• A sound Network should allow all users to share information across a broad
mix of computer platforms and operating systems.
• Prepare a reasonable and concise directory structure
• Consider a gradual method of transferring data to provide the training,
confidence, and skills necessary to become more efficient in GIS and IMS.
• Prepare for modifications along the way.
Whether it be by token ring or modem, the connections are made and we are
well on our way to "Integrating Utility G.I.S. & Infrastructure Management".
22
Pax .�
FEBRUARY 3, 1997 U '44
Director Pinto emphasized that the County is very fortunate
because this is still a young county and we are already tracking
lines through our infrastructure interface:
INFRASTRUCTURE INTERFACE
As with any regional facilities there is a need for plant interconnection. The basic core of this
system begins with our 900 NM telemetry system the RTU (remote transmitting units).They
monitor the status of sewer lift stations, water storage tanks, pump stations, pressure monitoring
equipment in the water system, and control of our integrated reuse system and through the use of
triangulation we will also have the ability to track trucks for dispatch, lone workers for safety
purposes as well as track any non -fixed assets.(Reference typical plant console layouts and system
overview). Each one of the treatment plants can also interface through an intranet communication
system which allows all facilities to view each other and pass data and control functions back and
forth. This is the first system of its type in the country and allows connection of plants to occur in
a much more flexible and cost effective manor. The system provides automation of operating
costs and data tracking to the operations staff. This system alternative was conceived by the
director and is currently being implemented by the staff to provide a total system interface not
only between plants, but with office Information Management. It will also help reduce capital cost
which will result in a more efficient operation.
Director Pinto felt that at 2:00 a.m., when you are trying to
shut the system down because of a water main break, is when you
really appreciate the capabilities of the system.
Master Planning, Wastewater/Water Treatment Plants SCADA
Infrastructure Interface
Capital Projects Engineer Bill McCain presented an overview of
engineering, master planning and regional wastewater treatment
plant expansions as follows:
ENGINEERING INTRODUCTION
The staff not only does the monitoring and tracking of county managed projects, but it must also
track and issue permits for all private utility construction as well. Along with the permitting of
projects the staff is also responsible for inspection of all utility construction to insure it is in
compliance with Indian River County Utility Standards. The staff has implemented an industrial
waste permitting process to maintain the integrity of wastewater being discarhed into the
collection system. The staff functions not only as a typical county utility staff but as a private
23
FEBRUARY 3, 1997 eoott U0 UGE449
consulting firm with a hands on attitude to planning, design and pilot research all on the cutting
edge of technology. For example:
** Odor control system pilot programs
** Membrane (R..0) piloting programs
** Brine (R.O reject water) treatment
* * Provide its own lead and copper testing and treatment system
** Conceived new style telemetry, tracking/monitoring, communication system in house
** Study for Low Pressure Grinder and Pump (Rockridge)- Brian J. Graham, and Terry
Pinto, Terry Southard (See appendix report copy)
Finally the staff performs as a hands on design team, whether working on an in-house project or
with a consultant on an outside project. One of the biggest benefits to this type of operation is the
major cost savings whether it be from a cost efficient in-house project approach or by an outside
consultant lowering his fees after seeing the county's involvement in the project as an outside
Technical Review Team.
MASTER PLANNING BACKGROUND HISTORY
The original Master Plan's direction was to direct an orderly progression of the utilities
expansion. However, the main thrust was to expand water and sewer to areas of existing "small
package plants". This was targeted for several reasons:
n Potential health threat from possible improper operation as State and
Federal authorities were overwhelmed by the numerous facilities, therefore,
they were not always able to properly monitor their operation.
II) The existing customer base was to ensure early revenue. These efforts
were made possible by the actions of prior commissions that required
franchise agreements prior to developers being allowed to construct water
and wastewater facilities. The franchise agreements consistently requires
connection to regional facilities when they become available. At the time of
the inspection, there were approximately 64 private wastewater and 27
private water treatment plants. Those 27 water plants, 20 were franchised.
To this date, only 10 wastewater treatment plants, 7 water treatment
plants, and only 3 of the franchised plants are still in existence.(See exhibit
2 - A- D and Figure no. 2.19 and 2.20 )
The secondary thrust was to expand utilities into areas of potential health threats due to the
following:
24
� U PAGE L1��
FEBRUARY 3, 1997
I) Poor soil conditions presenting a potential for cross contamination between
well and septic tanks
II) Very small lot sizes causing the well and septic systems to be too close,
also presenting possible contamination issues.
As time progressed, service areas within the County changed, for example, the City of Sebastian
was made part of our system, then removed, and then placed back in again, causing the need for
several revisions to be made in the master plan. Also, during the same period (late 80's early 901s)
the County was developing a "Comprehensive Plan" , which is a state mandated plan for orderly
growth within the County, to avoid urban sprawl. Accepting that I hilities must romp before
developmgn=, regionally planned water and wastewater facilities became a driving force in the
Comprehensive Plan. Because the Comprehensive Plan designates areas of residential and
commercial development and puts requirements for the timing of service, the Comprehensive
Plan has become the molding force for the Master Plan. As an example, I will site the
requirement to provide water service to 30% of all existing residential and 50% of existing non-
residential by 1995 within the designated service areas. To put utility construction projects into
perspective, let's look at actual costs.
I) Total Capital Construction Dollars
w/m the last ten year S 60.000 000 00
II) Total Capital Construction Dollars
currently managed by staff $ 52.0 0 000 nn
III) Total Projected Capital out lay
through 2010 $10.000 000 00
Note: 2010 is the end of the current Master Plan. However, it only represents a 60% commercial
and 80% residential build out of the current land use designations, all dollars are approximate
only. These construction costs cover line extensions (i.e. Master Plan), assessment
projects (which can be phased expansion into areas of undersized lots), water, wastewater
expansions and effluent display system expansions. Details of all the expansion plans covered in
the Master Plan will follow in upcoming sections from water quality requirements, build out of
water, wastewater, and effluent collection systems/distribution systems and treatment plant
expansions.
25
FEBRUARY 3, 1997
Ri10K16' i PA E �����
REGION-AL—VLA-STEWATER TREATMENT PLANT EXPANSIONS
The artificial wetland was selected during the last update of the master plan ( with the Boards
direction) for the primary means of effluent disposal for the West Regional Wastewater Treatment
Plant. The wetland will have an even greater importance as wet weather disposal for all the
county's wastewater treatment plants. This direction has been chosen in lieu of its original "deep
well" plan for wet weather disposal (See WRWWTP Wetlands). The County has long been in the
business of reuse for effluent disposal and, in fact, has now constructed the beginnings of a fully
interconnected and remotely controlled distribution system (See Effluent Reuse Transmission
System).The method of effluent disposal sets the limits of treatment for the wastewater plants.
With the treatment level set, staff began to evaluate various processes based on the following:
** capital costs
** operation costs
* * treatment flexibility
** best fit with existing tankage
A modified extended aeration process was chosen with technology and process warranties
provided by a "patented Kruger process" (please refer to the enclosed report by W.F. McCain
and Rick Johnson with associated exhibits). With this treatment process, we can easily generate
effluent of a quality suitable for reuse and with minor modification we can generate effluent for
the wetlands. (Reference wastewater overview, detailed process diagram, typical type plant
layout 1&2, wetlands pond & plant). The selected process was a modified extended air process
and is monitored/contolled by the levels of dissolved oxygen at various critical locations in the
process train, and is computer controlled.
Permitting and Water Quality Mana eg ment
Environmental Engineer Robert Wisemen displayed a printout of
one DEP permit application, explained that each and every
application is at least that large, and went into some of the
standards for water quality management and permitting as follows:
I. PERMITTING MANAGEMENT
Permitting is extremely involved not only in applying for and
obtaining the permit, but also adhering to its requirements
during the effective period. This process will be discussed
in the maintenance of permits section a little later on.
After obtaining a permit, there are many specific conditions
26 66 U r
FEBRUARY 3, 1997
that must be effected.
Many reports; such as, the surface
water and groundwater monitoring reports, are required to be
submitted periodically to the regulatory authority. This will
also be elaborated upon later in the permit compliance
section.
Permitting management consists of the following:
A. Acquisition of Permits
B. Maintenance of Permits
C. Permit Compliance
D. Industrial Waste Permitting
E. Permitting of Private Development Construction
F. Sanitary Survey Monitoring
A. Acquisition of Permits
Acquisition of Permits usually involves satisfaction of
numerous requirements.
1. Completing the permit application.
2. Calculating and processing the application fee.
3. Supplying engineering drawings, identification of
specific location; name of project, owner, engineer
of record, and any other required information needed
to describe the project.
4. Supportive engineering reports and calculations.
5. Soil reports.
Upon positive completion of the review process by the
regulatory authorities, the application is declared
complete. As you would expect, the period of the review
process is dependent upon the complexity of the project.
It takes numerous work hours to prepare the requisite
submittals and drawings, and the cost can range from one
thousand to more than one hundred thousand dollars such
as in the permitting of the wetland, which required more
than 800 man hours for its completion.
As an example, for Indian River County to be able to
construct our wetland facility, our department had to
obtain numerous permits applicable to the project.
27
FEBRUARY 3, 1997 F,i;fLl 3
Following is a list of the necessary permits for that
project:
Florida Department of Environmental Protection
Construction permits:
Dredge and Fill -- impact to any jurisdictional
wetland species.
Groundwater impact to the groundwater.
Stormwater impact to surface water quality is
impacted.
Natural Resources impact to submerged lands.
St. Johns River Water Management District
Army Corps of Engineers access from the land to navigable
waterways.
Fish and Game Commission protection of endangered
species.
Indian River Farms Water Control District construction is
in or across their right-of-way.
Indian River County Planning and Zoning:
County and Federal Emergency Management Association
requirements.
County Wetland permit.
Indian River County Building Permit
Indian River County Tree Removal Permit
Health Department Tree Burning Permit
Licenses or permission to use easements.
Requirements upon construction completion:
Operation and Maintenance Manual
FDEP Operation Permit
FDEP NPDES Permit
B. Maintenance of Permits
Just as you would expect, some permits require more
maintenance than others. For example, maintenance
requirements relating to our treatment plant permits are
as follows:
1. Monthly Operating Reports (MORS) are required to be
submitted to the Florida Department of Environmental
Protection by the tenth day of the following month.
28 ��
FEBRUARY 3, 1997 eoo� Fn45
Some of the parameters that have to be reported are:
flows and loads, Chemical Biological Oxygen Demand
(CBOD5) on both the influent and effluent, Total
Suspended Solids (TSS) both on the influent and
effluent, pH, chlorine residual, bacteriological,
and nitrate concentration.
2. The Capacity Analysis Report. The Florida
Administrative Code, Chapter 62-600.405 requires
Public utilities to submit a Capacity Analysis
Report to FDEP. This must be submitted along with
the flow or capacity tracking and projected flow
capacity for the next service year.
3. Effluent and Reuse Operations Protocol. An
operations protocol or SOP's (which are standard
operating procedures) must be submitted annually to
FDEP to ensure that the procedures utilized by
Indian River County Utilities in the delivery of
reuse water for disposal to public access
facilities; such as, golf courses, parks, and
common areas, are in conformance with the permit
requirements and industry standards.
4. Operation and Maintenance Performance Reports.
These are evaluation reports for each treatment
unit in the treatment facilities. They must
indicate problems, deficiencies, and difficulties
which may have occurred, and the corrective action
taken within the required time frame during the
permit period. Also, the reports must describe the
physical condition, performance trends, and
treatment efficiencies of the facility, as well as
the preventive maintenance performed.
5. Groundwater Monitoring Reports. These quarterly
reports provide assurance to the FDEP --- that
groundwater violations have not occurred during the
period of the permit.
W
FEBRUARY 39 1997
N". -1R�
���� � L J. F -,,GC q�
C. Permit Compliance
Permit compliance is of the utmost importance and
requires continued diligence. Without exception, all
permit requirements must be in compliance. Non-
compliance with the permit conditions constitutes a
violation of the Florida Administrative Code and will
trigger an enforcement action that could result in fines
and/or imprisonment.
We have not experienced any enforcement action taken to
date by the FDEP or the EPA due to our persistent
diligence and expertise in this most important area of
utility management.
We are extremely proud of this accomplishment.
D. Industrial Waste Permitting - we issue the permit
We review and approve all proposals for industrial waste
discharge into our sewer collection system. The
biological treatment process employed at our treatment
facilities is a sensitive process which depends on the
activity of living microorganisms. Due to the
sensitivity of this operation, we must require and
regulate the pretreatment of wastewater which could
disrupt our treatment processes, prior to its discharge
into our collection system. If the plant balance (i.e.
food to organism ratio is upset, depletion of dissolved
oxygen occurs, or pH upset, and etc.) it can lead to a
non-compliance violation of our permit for an extended
period of time. Accordingly, effective administration of
this program protects our utility from possible permit
violations and treatment process disruptions.
E. Permitting of Private Development Construction - again we
issue the permit.
This program ensures that proper and uniform engineering
and construction methods and practices are employed
R (1 a Ct�UC 400
FEBRUARY 3, 1997
County -wide, and provides for the standardization of
utility infrastructure materials throughout the County --
This represents an enormous future cost savings for the
County.
F. Sanitary Survey Monitoring
This quarterly requirement is a program designed to
identify potential problems before becoming crisis
situations. Also, it
provides information
relative to the effectiveness of our environmental
operations.
II. WATER QUALITY MANAGEMENT
A. Drinking Water Quality
1• The operations permit, which is based on Chapter
62.500.300 of the Florida Administrative Code,
requires the permittee to submit regular periodical
chemical analysis results to the FDEP.
• Primary and secondary contaminants results
must be submitted quarterly.
• Pesticide and PCB reports must be submitted
annually.
• Microbiological reports must be submitted
monthly.
• Unregulated contaminants must be submitted
every 3 years for Group II, and quarterly for
Group I.
• Radio-nucleatides, quarterly, then every 3
years thereafter.
• Lead and Copper, semi-annually.
• Nitrates and Nitrites, annually.
• Inorganic contaminants, every 3 years.
• and, Volatile organic contaminants,
quarterly.
2• Completion and submittal of the EPA's NPDES permit
report is a quarterly requirement.
31
FEBRUARY 3, 1997 PSC"K �.Uv Fnt q ; 7
B. Effluent and Reuse Water Quality
Disposal of water and wastewater treatment plant waste
effluent water is an environmental concern to all and
future generations. It impacts our ground and surface
waters and accordingly requires monitoring.
Our operations permits require submission of quarterly
Reclaimed Water or Effluent Analysis Reports to the FDEP.
These reports contain the analytical results for
organics, volatile organics, inorganics, trihalomethanes,
radiological elements, and secondary chemical parameters.
Satisfactory completion and reporting of these testing
requirements gives assurance that we are in compliance
with the antidegradation law.
Sludge Disposal Monitoring Report
This report provides tracking and disposal information
for sludge residuals generated and/or processed at our
treatment facilities. These reports must be submitted to
the EPA annually as a requirement of our National
Pollutant Discharge Elimination System (NPDES) Permit.
Commissioner Ginn pointed out some equipment and glass vials
on the front table of the Chambers and questioned their purpose.
Director Pinto explained that the equipment was an example of
a RO processing plant and the vials are: (1) water that comes into
the processing plant; (2) water after a part of the process has
been applied; (3) after more of the process; (4) wetlands water;
and (5) RO water which is supplied to homes.
Design and Implementation of Collection and Distribution System
Environmental Engineer Mike Hotchkiss reviewed how the County
plans expansion of the collection and distribution system to meet
the needs of growth and development by means of the Master Plan
which is derived from the County's Comprehensive Plan and
implemented through Developer's Agreements and assessment projects:
32
FEBRUARY 3, 1997
Global Plan
• Continuing Services Engineer determines
required facilities to meet the needs of O
anticipated growth
Master plan facilities are constructed
through developer's agreements and
assessment projects
First we are going to cover how the master plan is implemented globally.
(Read slide)
As large developments are submitted for review by TRC, The continuing
Services Master Plan Engineer Consultant is provided information about the
project. They evaluate what impact the development will have on the water.
sewer and re -use system. They recommend any system modifications that
might be needed, based on their analysis.
Master planned water, sewer and re -use transmission mains are then
constructed through developer's agreements as new private projects are
planned, and along with assessment projects.
(See display of the existing water, sewer and reuse system)
Here are some layout views of the County's existing water, sewer and reuse
systems.
0
•
Typical Master Plan (Continued)
• Construction schedules are estimated based 0
on regional growth projections O
• Provisions are made in the schedule to
accommodate developments that will
•
significantly affect the system
O
0
O •
33 ROOK UJ FACE 4'
FEBRUARY 3, 1997
(Read slide)
Show example of typical construction schedule, and disclose to audience that
an example of how the master plan is evaluated with site plan submittals will
be covered in a minute.
This will be illustrated later by examining an actual project.
Now we are going to cover how the master plan is implemented locally...
Evidence of Contamination in
Ground Water
• 45th Street Water Distribution Project
(See overall layout of 45th Street job)
❑9
Here is an example of an area where the Environmental Health Department
identified contaminated ground water. Consequently there existed a potential
health risk to the public through the consumption of well water. Therefore, the
County constructed a water distribution system to insure that the residents are
provided safe drinking water. The project was funded through an assessment
of benefiting property owners.
Interlocal Agreement with Other
Municipalities
Sebastian Highlands Water Expansion- l..
approximately 100 miles of water main is
being expanded to approximately 10,000
customers in three phases through an inter-
local agreement with the City of Sebastian
that was signed in September, 1995
( See display of phased expansion)
34 BOOK 100 FACE I-15
FEBRUARY 3, 1997
a
Here is an example of an area which was determined to have a water
distribution system constructed through an inter -local agreement between the
County and the City of Sebastian. This came about as a result of the sale of the
utility system to Indian River County.
All three phases are scheduled to be complete by the end of the year 2000.
This particular area is estimated to comprise the majority of development in
the County in the near future.
TRC Review
- The Sanctuary
— Development is submitted to TRC for review 0
— Water and sewer demands require connection
to County system
— Lack of existing water and sewer transmission
mains in vicinity of project require off site
improvements by developer
Here is an example of a typical project reviewed by TRC
(See the connection matrix visual aid and relate it with the site plan submittal)
This particular project is a residential development for 109 single-family
homes. Based on the connection matrix, the development is required to
connect to water and sewer.
�JLJ
TRC Review (Continued)
— County Master Plan is reviewed to determine
size and location of water and sewer mains p
— Developer enters into agreement with County
to construct water and sewer lines in
accordance with Master Plan
— Developer is reimbursed cost of off site
improvements not directly associated with
project
(Read slide)
Here is the master plan for the collection system in that area.
Here is the schedule of construction
( See visual of master plan and construction schedules)
Even though this section was scheduled to be constructed before now, there
has not been any growth in the area to warrant construction of the facilities.
35
FEBRUARY 3, 1997
BOOK 1 UJ PAGE 4"1
Another example of this is when a developer submits a site plan for review by
TRC. Staff reviews surrounding area for the potential of future development.
Staff then determines the optimum location of a lift station that will service
the needs of future development. The applicant is encouraged to enter into a
Developer's Agreement and oversize their lift station to service future growth
of the surrounding property. The participant is refunded a proportionate share
of the construction cost based on their anticipated sewage flows. There is quite
a bit of motivation for the developer since his portion is substantially lower
than the cost of a private system. This helps to make the development
economically feasible.
Now when the new development comes into site plan review, we can share the
good news that we thought about them during the previous development by
sizing a lift station for them, thus providing sewer service at a reduced cost.
We expect the new development soon due to the excellent drainage
characteristics in this particular area.
Assessment Projects
• Suburban Acres
— As Master Plan lines are constructed in the O
vicinity of other developments, public interest
arises and petitions are signed
— Environmental engineer designs in-house
protect
— Utilities are expanded to conned
customers
(Read slide)
(See the construction plans for Suburban Acres)
Here is an example of a subdivision where a water main was constructed
across the entrance to their street. As the residents of the subdivision caught
wind of the existing water main they began to inquire about the possibility of
having water extended for their use. They agreed to an assessment project and
as a result they are now drinking clean, safe, delicious County water.
Assessment projects usually involve expansion of potable water facilities in
lieu of sewer. This is the cheaper means of controlling the quality of water
consumed by the public.
The only exception to this is when the Environmental Health Department
identifies the potential of some communicable disease that could possibly be
transmitted through ground water. In this case a forced sewer assessment is
imposed on the residents of the affected area.
FEBRUARY 3, 1997
36 BOOK J 0 FA6t�
r
_I
What This Means
• The Master Plan ensures that the Utilities o
Department provides the residents of Indian Rive
County with the best quality of life possible by
providing an uninterruptible supply of safe, clean,
delicious water throughout the Urban Service
Area
• This insures that Indian River County remains a
Ft
autiful, pristine community, and we at the
ilities Department are proud to be a part of it.
o °
This brings us to the end of "Design and Implementation of the Collection and
Distribution System."
Implementation of Assessment Projects
Manager of Assessment Projects Dan Chastain reviewed typical
inquiries received by his department; summarized assessment project
procedures, water petitioning procedures, the petitioning process,
a typical petition assessment project, and some of the advantages
of having County water service:
TYPICAL INQUIRIES
Typical Inguiries Are Received From
Property owners
Prospective owners planning to build or purchase
Realtors
Builders, developers, engineering firms
Appraisers
Other governmental offices or departments (such as, Fire
Department or Environmental Health Department)
Neighborhood groups
Homeowners associations
Such inquiries come through walk—ins, mail, telephone, and fax.
Information Requested Includes:
Is water and/or sewer available at a particular location
Closest available service
Line size
Cost to connect to the system
What is involved
How fees may be paid
Time required to connect
37
FEBRUARY 39 1997
9 °�
ROCK 10,03F,mH 46c)
Service Provided:
Responses to the above (i.e., 10 to 14 months would be the
completion time for a typical petition assessment project)
Meeting with homeowner(s) groups after normal working hours,
as required
Providing petition forms, plat maps, rate charts
Standard costs, impact fees, meter fees
Line extension fees
Temporary expedited service agreements
Information regarding developer's agreements
Receiving and processing petitions
Setting up files
Researching easements
Assigning project number
Preparing agenda items
Obtaining Board of County -Commission authorization for new
assessment projects
Preparing and managing the assessment project
DATE: FEBRUARY 3, 1997
TO: INDIAN RIVER COUNTY BOARD OF COUNTY COMMISSIONERS
THRU: TERRANCE G. PINTO
DIRECTOR OF UTILITY SERVICES
FROM: JAMES D. CHASTAIN
MANAGER OF ASSESSMENT PROJECTS
SUBJECT: INDIAN RIVER COUNTY
DEPARTMENT OF UTILITY SERVICES
SUMMARY OF ASSESSMENT PROJECT PROCEDURES
SUMMARY OF ASSESSMENT PROJECT PROCEDURES
Indian River County Ordinance No. 92-28 (copy attached) contains
procedures by which the Board of County Commissioners may provide
for local services or improvements on a special assessment basis by
its own initiative or upon petition by owners to be benefitted
thereby. The ordinance encompasses: requirements and form of
petitions, publication and adoption of the services or
improvements, preliminary assessment roll and hearing, notice to
the owners, final assessment roll, payment of assessments,
assessments to become liens, and providing authority to borrow
funds.
Services and improvements include: streets and roads, water and
sewage systems, water and sewage treatment plants, drainage, street
lighting, sidewalks, and such other services or facilities which
may be deemed essential.
The procedure authorized by the Board of County Commissioners for
the Department of Utility Services is (although not limited to) the
square foot method of assessment of properties. This is the only
method of assessment which has been upheld by the Florida Supreme
Court.
Staff in the Department of Utility Services have performed
extensive evaluations of alternative assessment methods. on June
14, 1991 in a special meeting before the Board of County
Commissioners, staff reviewed these results and presented examples
of same (the meeting was covered by the news media). The minutes
of the meeting and the discussion regarding special assessments
follow.
A State statute mandated the adoption of a Comprehensive Plan,
which Indian River County adopted in 1990. The Comprehensive Plan
requirements set forth in Objective 2 of the Water Sub -Element
require the installation of water facilities to serve the urban
service areas, giving priority to subdivisions having undersized
lots and/or health problems. The Department developed a phased
plan to meet the Comprehensive Plan requirements.
38
FEBRUARY 3, 1997 DOOK FACE X64
The majority of the lots in the water expansion planned phases are
substandard, or "undersized," according to Indian River County's
Comprehensive Plan and the County Public Health Unit, Division of
Environmental Health, which require that new lots utilizing well
and septic systems be a minimum of one-half acre. Lots not meeting
these minimum standards are called "undersized lots."
The objective of the phased water expansion plan is to meet the
Comprehensive Plan requirements to make available safe, healthy,
potable drinking water to those areas with undersized lots and
Potential health problems in a planned, effective, and efficient
manner.
On October 23, 1990 the Indian River County Board of County
Commissioners gave conceptual approval of the installation of water
facilities as part of the water main extension growth plan. The
Department of Utility Services continues meeting the Comprehensive
Plan requirements.
SUMMARY OF WATER PETITIONING PROCEDURES
1. Determine the location of the nearest water main.
2. Verify existence of public streets and/or utility easements
3• If an easement is needed, explain this at the time a petition
form is provided.
4. Explain the petitioning - Special Assessment Ordinance
5. Provide Petitioner a Cony of..
a) Petition Process
b) Petition Form and Addendum
C) Advantages of County Water
d) Plat Map
e) Summary information sheet - explain impact fees. ERU's
meter fee and financing information
f) Schedule of rates
6• Explain the benefit of obtaining a copy of the tax roll and
assist in obtaining same
7. When A Petition Is Received
a) Verify names of signers against tax roll
b) Confirm 66.7% (2/3 rd's) or more of the benefiting
properties are supportive
C) Start a file and assign a project number T
d) Prepare an agenda item to the Board of County
Commissioners, requesting approval of the petition and
authorization to begin engineering design
8. After BCC - Authorizes Desian Encrineerincr
a) Request project be assigned to an engineer
WATER EXPANSION ASSESSMENT PROJECTS -MAY BE EXPEDITED BY PETITION
The Department of Utility Services for Indian River County has a
water system Master Plan, which wil-1 be providing water to the
area's of greatest need, as required by specific provisions in
the County's Comprehensive Plan.
39 EOOK 10J PAGEc"�
FEBRUARY 3, 1997
A petition with two-thirds (66.7W) of the benefitted property
owners supporting an assessment project may be recommended to the
Board of County Commissioners (BCC). The BCC authorizes
Engineering Design and Utility Engineers to estimate each
project's cost. Costs may vary from one project to another.
Properties are proportionally assessed based on the square
footage of property owned. The total square footage of property
to be assessed is divided into the estimated project costs, to
obtain the rate or estimated assessment costs per square foot. A
preliminary assessment roll is prepared and submitted to the BCC
for approval and setting a public hearing dated. Notice of a
preliminary assessment and public hearing is mailed to property
owners by certified mail. This letter also invites property
owners to an informal informational meeting.
At the informational meeting an overview of the project is
explained and questions are invited of the property owners. The
assessment manager and project engineer answer questions.
The date, time and location of the public hearing is advertised.
At the public hearing, property owners who wish may speak in
support of or in opposition to the project.
After approval of a project at a public hearing, the assessment
roll is recorded in the public records. The project is advertised
for bidding by utility construction companies. After completion
of project construction and acceptance from the Department of
Environmental Protection (DEP), connection to the system is
allowed.
The final assessment roll and final cost is prepared and
submitted to the BCC for approval. Final assessment letters are
mailed to property owners. These notices also include ten (10)
year payment schedules and explain payment options.
Petition forms and supportive information may be obtained by
contacting Dan Chastain at Indian River County Utilities
Department, 1840 25th Street, Vero Beach, FL 32960 or by phoning
(561) 770-5324.
Appointments may be arranged for groups, a given area or
homeowners associations, for informational meetings.
Safe drinking water and fire protection, like insurance,
are only good if you should ever need them. Dependency
solely upon shallow wells.can be risky. Water sources
are becoming increasingly contaminated by natural and
man-made pollutants. Drinking water is being treated by
the Indian River County Utilities Department, utilizing
the reverse osmosis treatment system to provide a
continuous supply of safe, palatable drinking water that
is free of contaminants that can cause disease or be
toxic to a consumer. The process is capable of
desalting, softening, disinfecting, and removing specific
organics and contaminants. Indian River County was one
of the first counties in the State of Florida to
construct and have such drinking water treatment plants
in operation. The water is also fluoride treated.
The Department of Utility Services for Indian River
County has a water system Master Plan, which in phases
will be providing water to the areas of greatest need, as
required by specific provisions in the County's
Comprehensive Plan.
WATER DISTRIBUTION SYSTEM
Assessment of property owners for a proportionate share
of the total cost of the project is based upon the square
footage of the area of property owned by you.
FEBRUARY 3, 1997
40 BOOK NO PAGE 4 6i
The assessment cost can be spread over ten years with
annual installments at 8.25% per annum. The first annual
installment is due one year after completion of the
project. If paid in full within 90 days after completion
of the project and final acceptance and approval by the
Board of County Commissioners, there are no interest
expenses.
In addition to assessment costs, there are water impact
fees, which are currently $1,570.00, payable at the time
of application for a service connection for each
equivalent residential unit (ERU), which are a necessary
integral part of funding the cost of water treatment
systems.
Impact fees may be financed and paid monthly, over a five
or ten year period at 8.25%.
Other standard additional charges include:
Deposit of $50.00 for each ERU.
Meter installation charge of $130.00 each.
EXAMPLE: A TYPICAL PETITION ASSESSMENT PROJECTS SUMMARY SCHEDULE
VERO GLEN SUBDIVISION PETITION FOR COUNTY WATER
INDIAN RIVER COUNTY PROJECT NO. UW -95 -10 -DS
DATE
10/06/94 MET WITH PROPERTY OWNERS ASSOCIATION AT 32ND CT SW SITE
MADE PRESENTATION, ANSWERED QUESTIONS & CONCERNS &
WENT OVER THE PETITION AND INFORMATION LEFT AT THAT TIME.
05/03/95 RECEIVED PETITION FROM OWNERS, SET UP A FILE, ASSIGNED A PROJECT
NUMBER, VERIFIED UTILITY EASEMENTS, COPIED SID PLAT, MADE SITE
INSPECTION.
05/05/95 PREPARED AGENDA ITEM FOR PRESENTATION TO THE BOARD OF
COUNTY COMMISSIONERS.
05/16/95 OBTAINED BCC AUTHORIZATION TO PROCEED WITH ENGINEERING DESIGN
WORK, IN PREPARATION FOR THE SPECIAL ASSESSMENT PROJECT.
REQUESTED PROJECT BE ASSIGNED TO AN ENGINEER.
05/24/95 CALCULATED SQUARE FOOTAGE OF PROPERTIES TO BE ASSESSED.
06/10/95 PREPARED AN ESTIMATE OF ADMINISTRATIVE EXPENSES.
06/26/95 ENGINEER RECEIVED SURVEY DRAWING FROM SURVEYOR.
08/15/95 ENGINEERING DESIGN COMPLETED
08/31/95 RECEIVED PRELIMINARY PROJECT COST ESTIMATE.
09/01/95 PREPARED PRELIMINARY ASSESSMENT ROLL, SCHEDULE, AGENDA ITEM
AND RESOLUTION'S I AND II .
09/19/95 OBTAINED BCC APPROVAL OF PRELIMINARY ASSESSMENT ROLL, SET A PUBLIC
HEARING DATE, MAILED LETTERS TO PROPERTY OWNERS WITH DATES OF AN INFORMATIONAL
MEETING FOR SEPT 26, AND FOR A PUBLIC HEARING ON OCT 10, 95.
09/22/95 PUBLISHED DATE OF THE PUBLIC HEARING.
09/25/95 PUBLISHED DATE OF THE PUBLIC HEARING, AND RESOLUTION I , TOGETHER
WITH A MAP OF THE AREA TO BE ASSESSED.
09/26/95 HELD AN INFORMAL INFORMATIONAL MEETING , AT 7 PM, FOR PROPERTY OWNERS.
10/10/95 THE BOARD OF COUNTY COMMISSIONERS APPROVED THE PROJECT, AT THE
PUBLIC HEARING.
REQUESTED COUNTY ATTORNEYS OFFICE PROCEED WITH RECORDING OF PRELIMINARY
ASSESSMENT ROLL.
11/15/95 PURCHASING DEPT. ADVERTISED FOR BIDS, FOR CONSTRUCTION.
41
FEBRUARY 3, 1997 eooK PAGE
11/20/95 PERMIT RECEIVED FROM STATE DEPT. OF ENVIRONMENTAL PROTECTION.
11/29/95 PURCHASING DEPT. ADVERTISED FOR BIDS, FOR CONSTRUCTION.
12/06/95 BIDS OPENED
12/14/95 RECOMMENDATION TO PURCHASING TO AWARD CONSTRUCTION CONTRACT.
01/02/96 CONTRACT AWARD APPROVED BY BCC.
01/19/96 NOTICE TO PROCEED GIVEN TO CONTRACTOR.
02/09/96 CONSTRUCTION COMPLETED AND ACCEPTED BY INSPECTOR AND ENGINEER.
02/13/96 REQUESTED CLEARANCE FROM DEPT. OF ENVIRONMENTAL PROTECTION.
02/15/96 RECEIVED CLEARANCE APPROVAL FOR CUSTOMER CONNECTIONS FROM THE
STATE DEPT. OF ENVIRONMENTAL -PROTECTION.
02/15/96 NOTIFIED PROPERTY OWNERS AND UTILITIES CUSTOMER SERVICE DEPT.
OF SAME AND COMMENCED CUSTOMER CONNECTIONS.
03/12/96 BCC APPROVAL OF CHANGE ORDER AND FINAL PAYMENT REQUEST.
05/21/96 BOARD OF COUNTY COMMISSIONERS APPROVED FINAL ASSESSMENT.
LETTERS WITH PAYMENT SCHEDULES & PAYMENT OPTIONS MAILED TO OWNERS.
ADVANTAGES OF INDIAN RIVER COUNTY WATER SERVICE
,AVAILABILITY
The water supply is there when needed! This expedites connection
time.
COST SAVINGS
Assessment project construction costs would more than likely be
less now than in the future.
Repair, maintenance, and replacement of appliances and plumbing
fixtures should be less frequent.
Elimination of water softeners would eliminate associated costs as
well as the time and inconvenience of purchasing salt,
transporting, and filling the softener tank.
Discontinue purchase of bottled water and eliminate or reduce
commercial laundry expenses.
Fire insurance premiums are reduced with greater fire protection.
FIRE PROTECTION
Fire trucks are not equipped to use water from swimming pools or
lakes.
A typical fire of small to moderate size in a home will require a
minimum of 20 to 30 minutes of water supply to confine and
extinguish the fire.
A fire truck typically carries 750 gallons of water. This will
provide only 4 to 7 minutes of water if a fire hydrant is not
available. A second arriving truck will carry an additional 4 to
7 minutes of water. No tanker trucks are available in the south
county.
Fire hydrants serve to lower insurance rates in your neighborhood
and provide the fire department with quick and reliable means to
obtain water for the purpose of fire extinguishment.
There is reduced liability as a result of greater fire protection
with reduced fire hazard insurance premiums.
11EAVr1
Quality control! There can be peace of mind due to ongoing regular
monitoring and testing with regular reporting to State and Federal
regulatory agencies. The County water meets safe water drinking
standards as adopted by the Florida Department of Environmental
Protection (FDEP).
The reverse osmosis water treatment system has become the most
universally accepted. The treatment plants are capable of
desalting, softening, disinfecting, and removing specific -'organics
and contaminants. Indian River County has been one of the first
counties in the State of Florida to construct such drinking water
plants and to have such plants in operation. The water is also
fluoride treated.
Service is reliable even when a home or business is without
electrical power due to storms or other power interruption.
42 BOOK 100 PAGE 40
FEBRUARY 3, 1997
Commissioner Adams brought up the occasional problems
experienced by homeowners in obtaining loans because of existing
utility liens, and Director Pinto commented that it is not a county
requirement that the lien be called at that time. If the bank
agrees to allow continuation of the payments, the County will OK
refinancing or subordination of impact fees. State statutes
require that the liens be recorded.
County Attorney Vitunac commented that Paralegal Lea Keller,
of his office, has been very successful in dealing with banks on
this issue and suggested that this information be communicated to
affected utilities customers.
Inspection of Construction Projects
Chief Inspector Dan Burton reviewed the inspection process and
general responsibilities of the Inspection Division:
INSPECTION DIVISION
by Daniel M. Burton, Chief Inspector
The inspection staff currently consists of four inspectors,
including myself. All the inspectors have an extensive background
in the methods and practices of utility construction. The combined
years of experience of the inspection staff exceeds 45 years.
The inspection staff's workload has increased dramatically over the
last ten years due to our rapidly expanding system and new
development throughout the County. In my ten years of service with
the Utilities Department, I've seen the amount of construction
projects increase from only 3 or 4 projects to over 20 projects
under construction at any one time. This project load has been
very consistent over the last six years.
As inspectors we interact with all services within Utilities on a
broad range of concerns, which include project coordination and
management, project review, customer service, and on many other
related Utility matters.
The role of a utility inspector varies greatly, depending upon the
situation. Although the actual project inspection and testing is
very important, another role of an inspector which is equally
important is that of public relations. The inspectors in most
cases may be the only representative from the County the customer
sees and has direct contact with. In this role, the inspector
interacts with the public/customer concerning many different
aspects of the project. We firmly believe that keeping the
customer informed and being concerned with their problems,
questions, or complaints greatly contributes to the successful
completion of any utility construction project.
The inspection staff conducts inspections and testing on all in-
house utility projects as well as all private development projects
to insure concurrence with all Indian River County Utilities and
State of Florida requirements.
Inspectors assist and advise the Utilities engineering staff of any
revisions needed concerning Indian River County Utility standards
and specifications.
Once any project in our department has been issued a permit, County
inspectors conduct a pre -construction meeting with the
owner/developer, contractor, and engineer of record. These
meetings are held to discuss the project, make any necessary
changes, and review shop drawings and materials.
43
FEBRUARY 3, 1997
RUSK p ; H qd
Inspectors make daily visits to each and every project, where an
inspection report is generated. These reports describe what type
of construction activity was observed or any specific testing
procedures performed on that date. Inspectors conduct all testing
Procedures as required by the Utilities Department, by the State of
Florida, and the Department of Environmental Protection to conform
with all industry standards and specifications. Required tests
conducted by the inspection staff are as follows:
Hydrostatic pressure test of water mains and sewage force
mains.
Infiltration and ex -filtration of gravity sewer mains and
manholes.
Televising all gravity sewer mains.
All projects must pass final inspection, and the engineer of record
must provide the necessary documentation to place the utility
system in service.
Examples of necessary documentation include, but are not limited
to, the following:
DEP clearance for water and sewer mains.
Bacteriological reports for water mains.
Certification by engineer of record.
As -built drawings by a registered, licenses surveyor.
No utility systems are placed in service prior to receiving DEP
clearance and certification by the engineer of record.
Once a project successfully passes final inspection after
undergoing all appropriate testing procedures and receiving the
necessary documentation, a letter/memo is then sent to various
departments within the County. This letter notifies the other
departments that the Utilities Department has completed all
inspection and testing and considers the project complete.
Customer Service
Customer Service Department Supervisor Art Reisfeld presented
the Customer Service Mission Statement and described the services
now being offered to customers:
44 IR iJ t'f+uC % U
FEBRUARY 3, 1997
To accomplish our mission, we
need to:
■ Promote fair and equitable rates and
charges.
Customer Service Center O`f-,�''
Indian River County offers:
■ New water and sewer services.
Mr. Reisfeld noted that there are some future services which
his department hopes to be able to provide to customers such as
automatic bank payments, credit card payments, an automated meter
reading/data collection system, and a GIS system.
Closing Summarization Operations and Maintenance of Infrastructure
Wastewater Division Operations Manager Gene Rauth reviewed the
Water Division, Operations/Maintenance, Lift Station Maintenance,
Wastewater Treatment and the Television System Vehicle for
detecting and repairing pipeline failures:
WATER DIVISION
The organization of water/wastewater operations is made up of four groups;
Water Production, Operations/Maintenance, Lift Station Maintenance and Wastewater
Treatment. These four divisions can be compared to the operation of any manufacturing,
service industry or company.
The first division for discussion is the Water Production group. This group takes
something as plain as water from the ground, in this case 1.3 billion gallons of water in
1996, and utilizes it as their raw production material. The group then processes this raw
product through a Reverse Osmoses system. In 1996, we purified 1.1 billion gallons of
water and rendered it potable. This feat was achieved by 15 professionally licensed plant
operators. This product was then sold to the utility's (approximately) 18,000 water
customers.
46C'00 Fit id
FEBRUARY 3, 1997
The customer `s trust and confidence must be maintained in our product. The
work of establishing and maintaining plant permitting and operator licensing with outside
governmental agencies provides the Quality Control Standards which are key in
maintaining the customer trust and confidence that assures that every time they turn on the
tap, safe potable water will flow out.
OPERA TIONSIMAINTENANCE
Another aspect of maintaining customer trust is the reliability of product delivery
and distribution. The Water And Wastewater Operations Group is the group which is
responsible for maintaining the Utility's 24 hour a -day, 7 day per week operation of the
distributions system. As shown by this graphic, this group provides the resources for
maintaining the Utility's distribution system (force mains & service laterals). Connection
of new customers, service to existing customers, the locating and marking service for
request for facility locations from outside entities are other essential services are provided
by this group. These services must be provided at any given time. The extent and
magnitude of these services are often unknown, until an inspection and assessment can be
made. This often puts the operations group into a React, Respond, and Repair Mode.
LIFT STA TION MAINTENANCE
Looking further into the basic operation of the Utility, another unique difference
between other manufacturing / service companies and the Utility is in the service side of
the business. As a company we sell a needed commodity, in this case potable water. We
provide transportation and delivery directly to our customer, Upon the use and
consumption of our product, our customer then pays us to remove and recycle the used
product, in this case wastewater.
The first step in this unique service _arrangement is the collection of the
wastewater, this is done by the Lift Station Operations Group. This group has the
responsibility of maintaining and keeping clear the 130 miles of gravity wastewater
collection mains within the Utility. However, the group's main responsibility is the
operation and maintenance of the 411 residential and 175 commercial lifts station that the
County has. These lift stations pumped over 951 million gallons of wastewater last year.
C, In
FEBRUARY 3, 1997
MOK M0 FAGE47 '
WASTEWATER TREATMENT
The Utility has a unique service arrangement with the customer. The collection,
treatment and recycling of the used product from the customer is second step in this
unique service arrangement. The Wastewater Treatment Group takes the untreated
wastewater and through physical, biological and chemical treatments turns the majority of
our customer's waste product into a recycled and reuseable commodity know as reuse
water. As mentioned earlier, in 1996, 951 million gallons of wastewater were treated.
The results of this treatment produced over 731 million gallons of reuse water, over 219
million gallons of treated wastewater, and over 36 hundred tons of sludge.
The division's technical abilities to operate and maintain the plants is apparent in
the plant's overall physical appearance and the confidence and enthusiasm that the
operators display. Each operator is a licensed professional who is required by his licensing
certification to say abreast of new technology, current trends, and ever changing
regulations. These efforts are important and are one of the catalyst necessary if an
organization is going to be cost effective in their operation.
A strong initiative within the Water and Wastewater Divisions is to concentrate on
operating costs. Emphasis is placed on effective cost avoidance in the labor (overtime)
area. This will be achieved through the effective scheduling of our operation crews and
work order processing by means of the AS400 computer system and the Infrastructure
Management System.
Cost efficiencies will be realized through additional and enhanced preventive -
maintenance programs. An example of this is the utilization of the County's Televising
System Vehicle.
With the foresight and approval of the Board Of County Commissioners,
the Televising System Vehicle, better known as the TV -Truck has revolutionized the
method of detecting and repairing pipeline failures. Failures that once took our
operations crews days to find and fix, now can be handled in a matter of hours. By
building on this remarkable tool, further direct cost avoidance in the areas of Utility
Locations, Leak Detection & Repair, Construction Standard Compliance, and Damage
Claim Documentation can be realized. In addition to these direct cost avoidance areas,
indirect areas such as crew and public safety can be explored. By utilizing this piece of
equipment to it's maximum, human exposure to possible hazardous conditions can be
minimized.
In closing, the cost avoidance topics mentioned are by no means a complete list.
Additional efforts in the areas of safety, inventory control and employee time management
can be realized.
48 EOOa IJ' PAGE 74
FEBRUARY 3, 1997
Quality of Product
The new Assistant Director, Jack Byrne, felt the Board has
every right to be extremely proud of the County's Utility
Department and Solid Waste Disposal District and expressed his
pleasure with his new position and his hopes for a long and
mutually beneficial association.
Director Pinto announced the end of the presentation and
commented that he is very proud to be working with these Utilities'
employees. In his opinion, this is without a doubt the best
organized working utility in the country and he would match it
against any others at any time. In a national catastrophe, no one
fights for electricity but all are concerned about a drink of clean
water. He invited everyone to visit the facilities and reiterated
his pride in the operation.
Chairman Eggert thanked the staff for all their effort in
putting together the presentation and opened the meeting to the
public for questions.
Ed Nelson, 8875 1286 Countryside North Mobile Home Community,
commented that he is the only speaker left to represent thousands
who are disgruntled, not with the people or the water, but with the
rates. He stated that he is being billed for 250 gallons of water
per day which he does not use. He has done an extensive
investigation into mobile home communities in Vero Beach and asked
to present the study to the Board.
Chairman Eggert asked Mr. Nelson to make an appointment with
Utilities Director Pinto and give him an opportunity to resolve the
problem.
Director Pinto stated that the Department does not want to
charge for more capacity than necessary but would appreciate the
opportunity to examine Mr. Nelson's documentation and attempt to
resolve any problems. -
The Chairman adjourned the meeting at 6:05 p.m.
ATTEST:
J. K. Barton, Clerk Carolyy
K. Egger Chairman
Minutes Approved: �- �-�?
49 BOOK 1 �0 FAGE 4 d 5
11E3RUARY 3, 1997