R SMITH,CLERK
�, c �,I WORK ORDER NUMBER 4 ' •.)1bI
Water Plant SCADA System Assessment & Remediation Plan and North WTP
Clearwell & Chlorine Panel Improvements
This Work Order Number 4 is entered into as of this l9ttday of May , 2015, pursuant to that
certain Continuing Contract Agreement for Professional Services,dated November 15,2011,and that certain
Extension and Amendment of Continuing Contract Agreement for Professional Services entered into as of
this 4th day of November,2014 (collectively referred to as the "Agreement"), by and between INDIAN RIVER
COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc.
("Consultant").
The COUNTY has selected the Consultant to perform the professional services set forth on Exhibit A
(Scope of Work), attached to this Work Order and made part hereof by this reference. The professional
services will be performed by the Consultant for the fee schedule set forth in Exhibit B (Fee Schedule),
attached to this Work Order and made a part hereof by this reference. The Consultant will perform the
professional services within the timeframe more particularly set forth in Exhibit A(Time Schedule),attached
to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions
set forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work
Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be
incorporated in each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF,the parties hereto have executed this Work Order as of the date first written
above.
CONSULTANT: BOARD OF COUNTY COMMISSIONERS
Kimley-Horn and Associates, Inc. OF INDIAN RIVER COUNTY ..\o
•+ ;i.Rs'"*''
David R. Bardt Wesley S. Davis
Title: ,Chaim I•� ,
Principal '0 4,t,.\.•'(•,-)I
BCC Approved Date: May Hca 5 ,i
�` .Ge`N,yFs
Attest:Jeffrey R. Smith,Cler"• Court and Com• o =r
./...4",
BY: ,...4001.<:•. . _ _ ...—..---.. ./
....0110111r
•e• • y Clerk
l
Approved: 41-4 . ... a 1• di 1
, eseph Baird, County Administrator
Approved as to form and legal sufficiency:
dytn T. Reingold,CountyAttorney Y
t.!'f 1HC1jt ,"O" 1 r T .
AGE
i.R.SMITH.CLERK
Exhibit A
Work Order#4
Indian River County Department of Utility Services
Water Plant SCADA System Assessment and Remediation Plan
and North WTP Clearwell &Chlorine Panel Design &Improvements
Engineering Services
PROJECT UNDERSTANDING
An evaluation of the existing PLC hardware and supervisory computer and data
acquisition (SCADA) system was conducted in early 2015,of which outlined
numerous upgrades and improvements that are needed. The purpose of the study
was to evaluate the existing outdated SCADA system and provide
recommendations for upgrades and an approach with actions for IRCU to
implement. The recommended work provided a prioritized and phased format to
allow IRCU to address these important issues in a logical order which will help
minimize disruptions in to the water treatment plant's (WTP) operations.
The following scope outlines the first several phases recommended in the report,
consisting of remediation and assessment of both the North and South water plant
SCADA systems, and modifying the PLC and replacing the chlorine and clearwell
panel at the North Hobart WTP.
SCOPE OF WORK
Consultant will utilize the services and provide coordination of Control Systems
Design,Inc.,and C&W Engineering in the execution of these tasks.
TASK 1—REMEDIATION AND ASSESSMENT (NORTH and SOUTH WTP)
Consultant will review each control panel at the North and South WTP, and
prepare specific tasks/controls that will be interrupted and agree upon an initial
approach as to whether the system has to be temporarily run with additional
equipment or can be run in local manual. Consultant will review the data and
operations that shall be maintained and archived without interruption.
For the control panels with remote telemetry,Consultant will detail the specific
connectivity that is to be removed, updated and/or can be interrupted and agree
upon an approach as to how long the plant can run without this communications.
Consultant will evaluate status, communications and pathing for all remote sites.
IC:\WPB,_Civi1\044572031 IRCU SCADA StudylScope\IRCU Water Plant SCADA Report-Modified.docx Page 1
TRUE COPY
ERTI=IC;TRONONLAST PAGE
R Cr_ERK
Determine pathing and hardware location scheme to support the new Ethernet RIO
connectivity and support a separate subnet for the HMI_LAN and the RIO_LAN.
Review and determine power distribution at each site for clean UPS power.
Review,test, and correct deficiencies in the existing control system per the electrical
remediation report, including surge arresters and related hardware.
Locate existing panel drawings, make modifications to drawings and update the as-
built status of the system.
Evaluate PLC hardware and revision levels,Wonderware HMI tag standards and
connectivity to IRCU network and prepare list of items to finalize in subsequent
implementation phases.
Tabulate conditions discovered during evaluation to establish a base condition for
hardware/software,and help determine specific approaches to each control panel's
upgrade and replacement. Prepare punch list for each panel of work to be
performed in subsequent phases.
Consultant will prepare a remediation and assessment report summary of existing
PLC and RIO panels. The report will provide comments on each PLC and RIO
panel and modifications performed to prepare them for subsequent upgrades,
TASK 2-EVALUATE AND CONFIGURE PLC PANEL (NORTH PLANT)
Consultant will configure the redundant CLX processors as individual processors
labeled CLXA and CLXB and verify both processors are operational and can
communicate with I/O and the HMI. Configuration will include rescheduling the
ControlNet Network Update Time (NUT) if necessary and establish the CLXA in
control of the system.
Consultant will coordinate the purchase of four EN2T modules, any extra cabling
and miscellaneous hardware to incorporate the modifications to be purchases by
IRCU.
Consultant will establish control of the system with CLXB. In the CLXA rack
remove the SRM and ENBT modules and replace them with two EN2T modules.
Reschedule the ControlNet NUT,configure the modules are operational and
communicating with I/O and the HMI and turn control back over to CLXA. CLXB
will stay as a warm backup throughout the rest of the conversion to Ethernet RIO.
Once the conversion is complete,Consultant will remove CNET module from both
CLXA and CLXB racks.
K:\WPB Civi11f144572031 IRCU SCADA Study\Scope!IRCU Water Plant SCADA Report-Modified.docx Page 2
ric COPY
` iCtTh)N ON LAST PAGE
5Iv 1TH C'_E',K
Consultant will review and modify the CLXA PLC program to the extent possible
to prepare for each new RIO panel to be added via Ethernet making tagging
upgrades to standardize the program.
TASK 3-DESIGN AND IMPLEMENT CLEARWELL AND CHLORINE PANEL
(NORTH PLANT)
Consultant will design new remote input/output (I/O) panels for the clearwell
(post-treatment) area and chlorine room which have shown severe corrosion and
experience frequent failures. The existing panels will be converted to J-boxes and
conduit/wire will be extended for new hardwired inputs/outputs. Consultant will
utilize existing panel shop drawings as a basis for design.
Consultant will prepare bid documents consisting of site plan depicting
improvements which are needed for present and future phasing,and panel
drawings and specifications for replacement and installation of new panels. It is
assumed that no more than three (3)qualified panel system suppliers will be
specified. Drawings will consist of control panel details, subplate layout, dead front
layout, wiring diagrams, and specified PLC and I/O equipment.
Consultant will provide coordination with purchasing department in procurement
of the new panels and a panel system supplier. Consultant will review quotes/bids
from the qualified panel suppliers.
Consultant will provide a list showing the I/O in these panels,assist with the
finalization of the specification and drawings required for the bid process and
submittal review of the subsequent panel design by the hardware integrator.
After the RIO panel submittal from lowest qualified panel supplier has been
selected/awarded,Consultant will review submittals and begin necessary
modifications to the existing main PLC program to incorporate this I/O.
Consultant will remove the RIO from DH+, reschedule the ControlNet Network
Update Time and verify the rest of the system is still operational and
communicating. Consultant will establish operation and communications with this
RIO Panel via the Ethernet connection.
Consultant will relocate existing I/O interface to Ethernet systematically,
maintaining operations to the extent possible. Consultant will review each block of
logic and establish operation as it did previously or better as it is migrated,before
continuing.
K.:\WP$_Civtl\044512031 [RCU SCADA Study\Scope\tR.CU Water Plant SCADA Report.Modified.docx Page 3
I rise COPY
;E L'F!cATONONL STPAGE
•r'
Consultant will update PLC code and tagging to bring existing SCADA system up
to standards created for the upgrade, update HMI database tags and screen
connections relative to this RIO panel,and update historical data collection and
reporting relative to this RIO panel.
SCHEDULE
In general,the following schedule is anticipated and consultant will work as
expeditiously as possible to meet it:
Task 1 6-8 weeks from Notice to Proceed (NTP)
Task 2 4-8 weeks after Task 1 (partially started along with
Task 1
Task 3 4--6 months after Task 2 (dependent on Panel
Supplier)
ADDITIONAL SERVICES
The following services are not included in the Scope of Services for this project,but
may be required depending on circumstances that may arise during the execution
of this project. Additional services include,but may not be limited to the following:
« HMI programming of any water plant operations
ITEMS FURNISHED BY OWNER
The following items will be furnished by the Owner and are necessary for
completion of the tasks described herein.
• The purchase of four EN2T modules, any extra cabling and miscellaneous
hardware to incorporate the modifications Ladder Task 1 will be provided by
IRCU.
• Record panel drawings of existing chlorine room panel and clearwell (post-
treatment) panel.
K;\WPB Civit\Q4457203I [RCU SCADA Study\ScopeURCU Water Plant SCADA Report•Modifietl.docx Page 4
EXHIBIT B-FEE SCHEDULE
We will provide these services in accordance with our Continuing Services Contract
Agreement for Professional Services dated November 15,2011,with Indian River
County,expiring November 161h, 2017.
The Consultant will provide professional services for Task 1 through Task 3 on a
lump sum fee basis as follows:
Task No. Task Task Fee
TASK 1 REMEDIATION AND ASSESSMENT $43,500
(North and South WTI') _
TASK 2 EVALUATE AND CONFIGURE PLC $13,400
PANEL (North WTP)
TASK 3 DESIGN&IMPLEMENT CLEARWELL $62,750
AND CHLORINE PANEL (North. WTP)
TOTAL $119,650
STATE OF FLORIDA
NRIAN RIVER COUNTY
PHIS IS TO CER IFY THAT •.�,,,,` '1`.. `• ''
A TRUE AND '1-RECT C• •` •F . ' ``•
... „
• T,E •' el. . ON FILE I� ••N.• 4
JEE4 REY R. ;� c
-/ _, e o: /.,tiltIii,(
GATE / Lt I .. �31 �C,
'••.!AN R 1\10 .,'
K:\WPB Civic\044572031 IRCU SCA DA Study\SaopeURCU Water Plant SCADA Report-iviodified.docx Page 5