HomeMy WebLinkAbout2015-1055-19-15 8,((, IMPROVEMENT OF THE INTERSECTION OF SR 60 & 43RD AVENUE °� DSS " f PROFESSIONAL CIVIL ENGINEERING & STRUCTURAL ENGINEERING SERVICES AMENDMENT NO. 7 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES AGREEMENT BETWEEN ARCADIS US, Inc. (fka ARCADIS G&M, Inc.), Inc. AND INDIAN RIVER COUNTY, FLORIDA. This is an amendment to the existing Engineering Services Agreement (AGREEMENT) dated September 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project Limits and Description", "Section III - Scope of Services", and "Section V - Compensation". Amendment Description This Amendment includes the following: "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: Consultant services are required for the preparation of road design plans; bridge plans; permit applications and utility relocations associated with the construction of SR 60 / 43rd Avenue Intersection Improvements. ARCADIS US, Inc., was contracted to design the widening of 43rd Avenue from 26th Street to 18th Street. The project was designed at the same time as the widening of 43rd Avenue from 18th Street south to 8th Street, designed by Carter Associates, Inc. Both designs assumed that construction would happen concurrently, so design of a transition from the new four lane configuration to the existing two lane configuration was not necessary for either plan. In addition, part of the stormwater drainage system for the ARCADIS design was to be directed south and treated in the Carter design. It has been determined that the roadway widening and drainage system south of 18th street (the Carter design) will not be constructed at this time and the plans should be revised to provide for a transition from four lanes to two lanes. In addition, a new drainage system design to accommodate the portion of the ARCADIS project that was directed south into the Carter project is necessary. The design will consist of inlets and pipes to convey runoff from 43rd Avenue to a new stormwater drainage pond. Hydraulic calculation will be performed to size the pipe system and the stormwater drainage pond. The roadway plans and profile sheets will be revised to show required improvements. The FDOT has reviewed the previously submitted plans and has provided comments to the COUNTY and ENGINEER. ENGINEER will revise the plans to address the FDOT's comments and to update the plans to the current FDOT design standards. The following plan sheets will be modified: Page 1 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc • Cover Sheet • Typical Sections • Quantities and General Notes • Details • Intersection Plateau Grading Plan • Construction Plans • Profiles • Cross Sections • Stormwater Pollution Prevention Plans • Signing and Pavement Marking Plans • Signalization Plans • Bridge Plans The work included in Amendment No. 7 is in accordance with the existing AGREEMENT dated November 6, 2005 between ARCADIS US, Inc. (ENGINEER) and Indian River County (COUNTY). "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: 30% and 60%, and 90% plans have been submitted to the County. Engineer will prepare revised 90%, and 100% plans. The plan modifications will consist of the following: The Roadway set of plans shall consist of the following: Page 2 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc 30% 60% 90% 100% Cover Sheet X X Typical Sections X X Summary of Quantities and General Notes X X Details X X Plan and Profile Sheets (40 scale) X X Cross Sections at 100 ft interval X X Signage & Pavement Marking Plans (40 scale) X X Signalization Plans X X Bridge Plans X X Intersection Plan & Details X X Page 2 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc Stormwater Pollution Prevention Plans (SWPPP) X X Computation Book X Construction Cost Estimate and Quantities X X "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: 1. Project shall be completed as follows: a. The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of Probable Construction Cost for the project shall be three (3) months from the date of execution of this ADDENDUM. Once permits are received, 100% design drawings shall be completed two (2) weeks thereafter. 2. Deliverables -The ENGINEER shall provide the COUNTY: a. Three (3) 11" x 17" paper signed and sealed of the 90% plans. Also, a pdf format set of the plans on a cd. b. FINAL five (5) 24" x 36" paper signed and sealed "hardcopy", AutoCad drawing file and PDF formats on CD. c. Work Product shall be prepared and supplied in State Plane geometry (NAD83 2007 adjustment if applicable); digital versions are to be prepared and submitted so that the COUNTY or other consultants can readily use it for the design and analysis of the area, as defined. It shall contain all information necessary for third -party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of Indian River COUNTY and will be available for use by the public at large. "SECTION V — COMPENSATION" is being modified to incorporate the following: The COUNTY agrees to pay and the ENGINEER or agrees to accept for services rendered pursuant to this Agreement fees in accordance with the following: A. Professional Services Fee 1. The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows: Page 3 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc The following is a summary of costs: Charge Associated with This Amendment Roadway Design Geotechnical Services (Tierra) $5,447.50 New Total Compensation $35,487.50 Engineering $49,152.50 $312,797.03 (ARCADIS) Signal Plans $2,668.41 $31,488.41 (SIMMONS & WHITE Inc.) Stormwater Pollution Prevention Plans $0.00 (ARCADIS) $9, 022.92 Permitting $11,760.00 $33,090.00 (ARCADIS) Surveying Design Survey $1,089.20 $63,690.40 (ARCADIS) Right of Way Survey and Map $0.00 $20,386.40 (ARCADIS) Structural Design Structural Design for SR 60 over Main Relief Canal bridge $0.00 $76,060.00 (Bridge Design Associates, Inc.) Structural Design for 43rd Avenue over Main Relief Canal bridge $9,224.00 $67,604.00 (Bridge Design Associates, Inc.) Landscape & Lighting Plans Landscape Architectural Services (Roy -Fisher Associates, Inc.) Lighting Plans (Techno Engineering) $4,000.00 $10, 750.00 $31,486.00 $39,835.00 Page 4 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc Public Involvement Public Workshop Meeting Contamination Screening Evaluation Report Conceptual Commercial Area Improvement Plan $0.00 $6,180.00 $0.00 $9,750.00 $0.00 $11, 700.00 TOTAL LUMP SUM FEE $94,091.61 $748,577.66 ALLOWANCES Sketch and Legal Descriptions $0.00 $50,000.00 (ARCADIS) Soft Dig for Utility Locations $0.00 $20,000.00 Appraisal $0.00 $121,500.00 (Callaway & Price) (For 27 parcels) Land Planner (Moyle, Flanigan, Katz, Raymond & Sheehan) (Hourly not to exceed at $175.00/hour) Market Analysis (Realmark Research) (Hourly not to exceed at $110.00/hour) Eminent Domain Business Damage Assessment (Gerson, Preston,Robinson & Company)(Hourly not to exceed at $165.00/hour for Principal, $125.00/hour for Manager, and $90.00/hour for Staff) Cure Plans (ARCADIS) (Allowance for 14 parcels at $4,000.00 per parcel $0.00 $20,000.00 $0.00 $20,000.00 Landscape plans for Cure Plans (Roy -Fisher) (Allowance for 14 parcels @ $1,200.00 per parcel) Boundary Surveying $0.00 $0.00 $40,000.00 $0.00 $56,000.00 $0.00 $16,800.00 $10,000.00 TOTAL ALLOWANCES (Hourly Not To Exceed) $0.00 $354,300.00 Page 5 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This Amendment No. 7 to the AGREEMENT regardless of where executed, shall be governed by and constructed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this 19th day of , 2015. Ma ARCADIS 2081 Vis, West Pa By: WITNESSED BY: 1. County Attorney Approved as to Form and Legal Sufficiency seph A. Baird, unty Administrator INDIAN RIVER COUNTY, FLOR cam,: BY(/ Board of County Commissioners'` M1SSI' f' s•. Approved by BCC May 19, 2015 Attest: Jeffrey R. Smith, Cler of Circuit Cort By: Deputy Clerk Page 6 of 6 G:\LNR Support\Proposals\WPB\2015\SR 60 - 43rd Avenue\SR60 - 43RD AVE AMENDMENT 7 3-24-15.doc z W W z z w rel OZ w Oc W, t' W Yo �0 rt LL 0 W H N W Amendment ACTIVITY TOTAL MAN HOURS o ACTIVITY TOTAL MAN HOURS 0 0 478.0 u . 0 of a0 0 o N 626.0 SURVEY CAD TECH. HOURLY RATE $ 58.80 SR. CADD OPERATOR J IX O x W g_ $ 75.00 $ 75.00 1 $ j 75.00 $ 75.00 $ 75.00 MAN HOURS O (V MAN 0 O x O V 10 m N i 6.0 ha T N PROF. SURVEYOR HOURLY RATE $ 75.60 1 PROJECT ENGINEER HOURLY RATE O0 Nh us} 0 /9 0 0 ,- IA $ 115.00 $ 115.00 MAN O MAN HOURS 14.0 O h W • 28.0 10.0 O 0 3 MAN FIELD CREW MAN HOURLY HOURS RALE 0 0 N 69 1 PROJECT MANAGER HOURLY J F g $ 140.00 $ 140.00 0 0 ov f9 0 0 ,_ 0 140.00 1 SURVEY _ 8.0 x 2O CO re 2 q ''r o 0 o Obi , o t0 0MI a CO ALTERNATIVES ANALYSIS J DRAINAGE DESIGN & ANALYSIS 1 ROADWAY PLANS SIGNALIZATION PLANS 1 PERMITTING SIGNING & PAVEMENT MARKING PLANS 0 0) 0 O 0 0 To 0 0 O 0 O 69 O N 10 0 O O 10 N 0 1 O O 10 H O 10 1- 69 O O 0 F9 O h N 19 69 M O 9 0 69 O h 0 N N 63 O 0 6) 69 N9 O O N 49 to 19 100 O 100 6, K 0 0 00) 0 w 0 0 to 0 69 0 0 0) M 69 0 0 6) ocT 69 O 0 co 0 O CD N 61-0 N > 0) 17- >- z zQ wQ ROADWAY PLANS SIGNALIZATION PLANS H z > Qa a0 Fez Y ZQ 2 0 0) N -J 0 H Average per hour J uj 0 CC 0) 0) N O h 00) O 0 N cO O 0 () O H O~ 6 5 M F Q 0 N 0 w 0 O 0 CO 19 O N csi c0 19 69 0 O m /9 0 O oo N 69 0 1 0 N /0 w 0 m F 0 0 o 0 0 0 O 0 O (0 10 DRAINAGE ANALYSIS ROADWAY PLANS (0 W 17- 7.1 D 0 z F uJ W a ILI CO W Q i 0 Qa CL a6 Z 0 Z zQ 0) Q 1- 0 F SR 60 8 43RD AVE Amendment 7 4-8-15 Ale HIGHWAY PAGE 1 OF 7 HIGHWAY TASK LIST ACTIVITY: A. ROADWAY PLANS PACKAGE REMARKS Pond Site on 43rd Avenue SR. GADD 2.0 N PROJECT SURVEYOR O FIELD CREW 8.0 O TOTAL HOURS O 0) O N O o o O O O m- NO. OF SHEETS HOURS/UNIT a) N NO. OF UNITS BASIS OF ESTIMATE IX Z HR W i rt S Ce 2 re 2 TASK 0 c 0 m 2. Location Survey 3. Elevation Survey 4. Drawings 5. QA/QC 6. Final t co ai o SUBTOTAL THIS SHEET SR 60 & 43RD AVE Amendment 7 4-8-15 .xls HIGHWAY PAGE 5 OF 7 HIGHWAY TASK LIST ACTIVITY: A. ROADWAY PLANS PACKAGE C0 Q W w CC Required by FDOT Required by FDOT SR. CADD O co 30.0 60.0 98.0 282.5 1 PROJECT ENGINEER 4.0 O O 24.0 38.0 r` Oa PROJECT MANAGER O mi 8.0 20.0 O M N T TOTAL HOURS m O 48 104 O O 168 LL N O W Z = 0 N (O HOURS/UNIT CO CO N NO. OF UNITS O N 0 BASIS OF ESTIMATE Each N 0N co r L.S. L W o 0 e 0 TASK 14 Detention Area Plan & Details 15 Optional Pipe Material Tabulation 16 Traffic Control Plans ( Typical sections only) 17 Driveway Profiles 18 Supervision 01 L .0) N M m SUBTOTAL THIS SHEET TOTALI SR 60 & 43RD AVE Amendment 7 4-5-15 xis HIGHWAY PAGE 6 OF 7 HIGHWAY TASK LIST SUBACTIVITY: 5 - ENV. SERVICES / PERMITS WAY PLANS PACKAGE ACTIVITY: A. RO CO Y Cr W IX Revise Drainage Report and Resubmit to SJRWMD 216 comments SR. CADD 0 PROJECT ENGINEER 8.0 0 O N N PROJECT MANAGER 8.0 17.0 O N 16.0 t0 TOTAL HOURS O 0 0 0 0 CD 0- 40 CD 0 0 N Of 03 NO. OF SHEETS HOURS/UNIT (D 0.08 O (D NO. OF UNITS 216 BASIS OF ESTIMATE L.S. (15 J L.S. Cli _1 C/5 j L.S. cti j cii J L.S. L.S. L.S. TASK 1. Preliminary Field Review 2. Agency Coordination (Pre App Meeting) 3. Establish Wetland Jurisdictional Lines 4. Agency Field Review Prepare Wetland Resouce / Dredge & Fill Permit 5. Application 6. Modify SJRWMD Permit 7. Address FDOT ERC Comments 8. FDOT coordination 9. Utility coordination 10. Health Department 11 Mitigation Coordination and Meetings SUBTOTAL THIS SHEET SR 60 & 43RD AVE Amendment 7 4-8-15 As HIGHWAY PAGE 7 OF 7 HIGHWAY TASK LIST SUBACTIVITY: NONE ACTIVITY: B. SIGNING & PAVEMENT MARKINGS REMARKS Transition on 43rd Avenue SR. CADD CO m PROJECT ENGINEER CO a o PROJECT MANAGER N N V TOTAL HOURS 0 0 CO 12 0 0 0 0 0 0 o 0 20 NO. OF SHEETS HOURS/UNIT CO C NO. OF UNITS C,) BASIS OF ESTIMATE Sheet Sheet L t EA EA EA Sheet EA W L.S. L.S. Yal 1 m Z d m L V) w d m Y 0 N O m H c N L m n. i V W N N N m ur 0 2 0 0 l() c0 m co N 0 rn _ C C) U a) co O To a rn a) v) in 1� W O) m d a) c) a to o E m T 19 m c = C cn a uj W c 0 v SUBTOTAL SR 60 8 43RD AVE Amendment 7 4-8-15 .xls BRIDGE DESIGN ASSOCIATES, INC. March 13, 2015 CONSULTING ENGINEERS Arcadis US, Inc. 2081 Vista Parkway West Palm Beach, Florida 33411 Attention: Hank Deibel, P.E. Regarding: 43"' Avenue Bridge over Main Relief Canal Project No.: 05-609B Dear Hank: BRIAN C. RHEAULT, RE. President Based on our discussions, Bridge Design Associates, Inc. can provide the necessary structural engineering services to modify the current plans to meet current AASHTO Standards and applicable F.D.O.T. Standards. Our services do not include modifying the plans to meet F.D.O.T. LAP Funding criteria. Our fee to update the plans is outlined in the attached Exhibit "A". If you have any questions, please give me a call. Respectfully, BRIDG % SIGN ASSOCIATES, INC. Brian C. Rheault, P.E., #38797 President BCR:kedS:\2005-Jobs\05-6098 43rd Avenue at Main Relief Canal12015\01 Admin\Proposals\proposal 03-13-15.wpd 1402 Royal Palm Beach Boulevard + Building 200 • Royal Palm Beach, Florida 33411 (561) 686-3660 * Fax: (561) 791-1995 BRIDGE DESIGN ASSOCIATES, INC. 43RD AVENUE BRIDGE OVER MAIN REUEF CANAL March 13, 2015 BDA PROJECT NO.: 05-509B HOURLY BREAKDOWN OF SERVICES EXHIBIT "A" ACTIVITY CHIEF ENGINEER PROJECT MANAGER PROJECT ENGINEER ENGINEER INTERN FIELO REPTECHNICUW ,, I CAO . TOTAL. HOURS BY ACTIVITY LABOR COST BY ACTIVITY 5195.00 5165.00 �., 992.00 �..�,.�..�,,..� 580.00 573.00 :93.00 . Update Notes and Design Standards 4.0 8.0 4.0 18 0 51.846 00 AASHTO Girder Analysis 4.0 18.0 8.0 28 0 52,956 00 Bridge Load Rating 4.0 40.0 440 54,42000 0.0 SO 00 0.0 50 CO ..F TOTAL MANHOURS 0.0 12.0 84.0 0.0 0.0 12.0 86.0 oiRECT LABOR COST 50.00 92,220.00 55888.00 50.00 90.00 51,116.00 59,224.00 ENGINEERING FEES S 12005JOD11054i098 43rd Avenue et Mein Rebef Cana92O15101 AdmintPmposaislproposal 03.1315,x15 59.224.00 SIMMONS( SITE ENGINEERING 1 PLANNING 1 CONSULTING 1 SINCE 1982 PROFESSIONAL SERVICES AGREEMENT ADDENDUM This Professional Services Agreement Addendum made and entered into this 30th day of March, 2015, authorizes changes to the Professional Services Agreement made and by and between: CONSULTANT: Simmons & White, Inc. CLIENT: ARCADIS US, Inc. for PROJECT: SR 60 at 43rd Avenue Signalization L CHANGES TO SCOPE OF SERVICES AND DELIVERABLES: CONSULTANT shall perform the following task: To update signalization plans to meet current FDOT and Indian River County signalization criteria, including re -analysis of existing and proposed mast arms with MastArm v5.03 and a site visit to verify existing conditions from original design are still valid. II. CHANGES TO SCHEDULE: N/A III. CHANGES TO COMPENSATION: Lump Sum = $2,268.41 IV. TERMS AND CONDITIONS: Except as specifically stated herein, all other Terms and Conditions of our existing Professional Services Agreement dated May 4, 2011 will remain in full force and effect. Simmons & White, Inc 2581 Metrocentre Boulevard Suite 3 West Palm Beach Florida 33407 T: 561.478.7848 F: 561.478.3738 www.simmonsandwhite.com Certificate of Authorization Number 3452 Mr. Hank Deibel, P.E. March 30, 2015 — Page 2 V. ACCEPTANCE: As to CLIENT As to CONSULTANT ARCADIS US, Inc. Simmons & Whit Mr. Hank Deibel, P.E. sa x:/docs/miscttr/Rennebaum/15002.deibelsr60signal R• • Rennebaum, P.E. resident HIGHWAY PAGE 1 OF 4 HIGHWAY TASK LIST 4 a COMMENTS 0 E. C i to be done by Client a 8c co E updated Mast Arm version I Signalization Analysis Technical Subtotal I 10 TOTAL HOURS 0 0 0 0 — 0 0 0o 0 — 0 0 KN >Z oo 2D 0 0 0 0 -- 0 0 0 0 0 0 CO 0Z Zz 0 0 0 0 4- e- 0 .- a o a CO ZCO 7 �- co J d W W co co co TASK Traffic Data Collection Intersection Field Data Collection 3 Ei E E m LL C 0, a c 0 a g co IS .. m a 8 Eo 0 Reference and Master Interconnect Communication Deakin File oeu o E Z 0`°co 0 f Pole Elevation/Structural Analysis c 'S 47.0 73 y '+ P m le E W so a 1 - NC O 1- Z — N of a 10 CD ti CO CO .— r. .n- HIGHWAY PAGE 2OF4_ HIGHWAY TASK LIST CO IV IV 2 i 0 U Design Field reviews Meetings with IRC/FDOT Permit submitted by ARCADIS, our role is to answer comments and coordinate with FOOT TOTAL HOURS r o .- 0 a.-ko CC t Signetization Analysis Nontechnical Subtotal Slgnalization Analysis Total R Z N O •- O 2 LL 0 t 0 Z r O .- 0 Z h Zco co J co co J D Y 'Field Reviews Quality Assurance/Ouality Control Independent Peer Review Supervision Coordination/FOOT/Permitting N a H cc gm 2 It E S F Y I- Z m co HIGHWAY TASK LIST ICOMMENTS insert ARCADIS design I 1— g TOTAL HOURS O 0 r r f 0 O 0 r 0 r 0 0 NO. OF SHEETS O O - - N 0 0 0 - 0 N 0 SUBTOTAL THIS SHEET i.13 0 r ,...,=Z n S 0 v •- r N 0 0 0 r 0 O LL co O F 2? r 0 r r N 0 0 r r 0 r0 j y 0 8 y 0 yWQ 0 W d d TASK Key Sheet 61 E r co Ix V Z•• CO E 0) Tabulation of Quantities General Notes/Pay Item Notes m m ti c a Interconnect Plans Traffic Monitoring Site Guide Sign Work Sheet Special Details ,Special Service Point Details Mast Arm Details Sheet Strain Pole Schedule Y Q9r H NP v v) c0 h c0 0) Or r r u.0 O a HIGHWAY TASK LIST H co co 6 a 2 0 ICOMMENTS TOTAL HOURS o o 0 o o ..- NO. OF SHEETS a 0 0 0 SIgnalizataon Plans Tachnlcal Subtotal 0 0 o CO =Z O> X 0 0 0 LL CO 0 p Z Z 0 0 O 0 h Z a y X Q TCP Signal (Temporary) Temporary Detection Sheet Utility Conflict Sheets Interim Standards Quality Assurance/Quality Control Supervision Y H erb TECHNO ENGINEERING, INC. 1207 General Pointe Trace Palm Beach Gardens, FL 33418 DESIGN FEE PROPOSAL April 8, 2015 Henry Deibel, PE Associate Vice President ARCADIS U.S., Inc. 2081 Vista Parkway, Suite 305 I West Palm Beach, FL 33411 T: 561 697 7075 Office: (561) 627-8112 Mobile: (561) 459-7406 techno_inc@bellsouth.net PE# 46666 SUBJECT: State Road 60 & 43rd Avenue SCOPE OF WORK: Update ROADWAY LIGHTING PLANS FOR SR 60 & 43 RD AVENUE dated 1/2011 to conform to the current FDOT design standards and to revise the plans for 43rd Avenue south of SR 60 to match new roadway width. Provide PDF files of electrical engineering design documents. Provide complete signed and sealed contract documents for permitting. EXCLUSIONS: Construction Administration Services such as Site Inspections, Certification of Project Lighting and As -Built Drawings. These services will be available for additional fees at the rate of $125.00/Hr. We propose that our design services be provided for a lump sum of $10,750.00 payable as follows: 1) 90% payment is due when 100% Design Documents are issued for permit. 2) The balance of payment shall be made completion of project. You can mail or scan and email a signed copy of this proposal to our office for us to proceed with project. Sincerely, TECHNO ENGINEERING, INC. David, Moslemian, P.E., V.P. Project Engineer This proposal has been approved and accepted by: Name: ARCADIS U.S., Inc. Title: Date: Page 1 of 1 Mr. Hank Deibel, PE Arcadis U.S. Inc 2081 Vista Parkway, Suite 305 West Palm Beach, FL 33411 April 8, 2015 Dear Hank: Thank you for the opportunity to provide additional services for State Road 60 and 43rd Avenue. This proposal includes the following services: • Site visit to verify existing trees indicated on plans for removal and revision of plans to reflect current conditions. • Update landscape plans according to latest FDOT standards and reformat plant list to FDOT schedule. • Review landscape plans to reflect current FDOT practices. Our fee for the above will be $4,000.00 Best regards, g,J A4,,,/ Connie Roy -Fisher P.O. Box 420 • Jupiter, FL 33468 • Phone: 561.747.3462 • Fax: 561.747.0281 • www.studio-sprout.com uerra tirt t R l D A tuorfoQaWI KisR% *IMAM TESTING MSPIL110.4 5E11%.35 April 10, 2015 ARCADIS 2081 Vista Parkway, Suite 200 West Palm Beach, FL 33411 Attn: Mr. Hank Deibel, Jr. P.E. Re: Proposal for Geotechnical Services Proposed Pond at 43rd Avenue Vero Beach, Florida TSF Proposal No.: 1504-164 Dear Hank: As requested, TIERRA SOUTH FLORIDA, INC. (TSF) is pleased to submit this proposal for the above -referenced project. The proposal is based on an email dated April 7, 2015. This proposal includes an outline of our proposed scope of work, an estimate of the total fees, and our anticipated schedule for completion of the work. PROPOSED SCOPE OF WORK We understand the proposed pond will measure about 1.3 acres, and will be excavated to a depth of about 10 feet below existing grades. We propose to drill five (5) Standard Penetration Test (SPT) borings to a depth of 25 feet below existing grade. Boring locations will be approximately located in the field by our personnel by measuring distances with a tape from known reference points. Elevations at boring locations can be interpreted from topographic plans if furnished by others. Prior to drilling at the project site, TSF will notify the local utility companies and request that underground utilities be marked. Our experience, however, is that the utility companies will not mark privately owned utilities. Our proposal assumes that private utility lines will be located in the field by others prior to mobilization of the drill rig. Upon completion of the field exploration, laboratory testing will be performed on selected samples. A geotechnical engineer will evaluate the results of all drilling and laboratory testing. A report will be issued that contains the exploration data. 2765 VISTA PARKWAY, SUITE 10 • WEST PALM BEACH, FLORIDA 33411 (561) 687-8539 FAX (561) 687-8570 State of Fforido Professional Engineers License #28073 ARCADIS 2 TSF Proposal No. 1504-164 ESTIMATED FEES It is proposed that the fee for the performance of the services outlined above be determined on a unit price basis in accordance with the attached Fee Schedule and that the work be performed pursuant to TSF's General Conditions enclosed herewith and incorporated into this proposal. Our estimated fee will be $5,447.50. Our estimate covers the work needed to present our findings in a report. Not included are reviews of drawings, preparation of construction specifications, special conferences and any other work requested after submittal of our report. SCHEDULE AND AUTHORIZATION TSF will proceed with the work after receipt of a signed copy of this proposal. With our present schedule, we can commence work within several days of project approval (weather permitting and permit approval). The fieldwork will take about one to two days to complete. The report can be submitted about two weeks after completion of the field exploration, depending on the extent of the laboratory -testing program. We at TSF appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you should have any questions concerning our proposal, please contact our office. Resp • ctfully submitted, TI: ' ' SOUTH FLORIDA, INC. F ancois Th s as, P.E. P 'ncipal Eng eer Attachments: 1. Fee Estimate AUTHORIZED BY: INVOICE TO: Name: Firm: Title: Name: Date: Address: TIERRA SOUTH FLORIDA, INC. Unit # of Units Unit Price Total 1. FIELD INVESTIGATION Mobilization of Men and Equipment Truck -Mounted Equipment Trip 1 $ 350.00 $ 350.00 SPT Borings 0 - 50 ft depth L.F. 125 $ 12.00 $ 1,500.00 SPT Borings 50 - 100 ft depth L.F. 0 $ 14.00 $ 0.00 Grout Boreholes 0 - 50 ft depth L.F. 125 $ 5.50 $ 687.50 Grout Boreholes 50 - 100 ft depth L.F. 0 $ 6.50 $ 0.00 Casing Allowance 0 - 50 ft depth L.F. 125 $ 7.00 $ 875.00 Casing Allowance 50 -100 ft depth L.F. 0 $ 9.00 $ 0.00 Borehole Permeability Test Each 0 $ 275.00 $ 0.00 II. LABORATORY TESTING Visual Examination by Staff Engineer Hour 2 $ 85.00 $ 170.00 Natural Moisture Content Tests Test 4 $ 10.00 $ 40.00 Grain -Size Analysis - Full Gradation Test 2 $ 60.00 $ 120.00 Corrosion Test Test 0 $ 185.00 $ 0.00 Organic Content Tests Test 3 $ 45.00 $ 135.00 1I1. FIELD ENGINEERING AND TECHNICAL SERVICES Site Recon./Utility Coordination Sr. Engineering Technician Hour 6 $ 65.00 $ 390.00 IIIA. ENGINEERING AND TECHNICAL SERVICES Principal Engineer Hour 0 $ 145.00 $ 0.00 Senior Geotechnical Engineer Hour 2 $ 125.00 $ 250.00 Project Engineer Hour 6 $ 115.00 $ 690.00 Draftperson Hour 4 $ 60.00 $ 240.00 TOTAL FEE FOR GEOTECHNICAL SERVICES $ 5,447.50