HomeMy WebLinkAbout2015-174Board of County Commissioners
180127th Street
Vero Beach, Florida 32960
Telep/zone: (772) 567-8000
FAX: (772) 778-9391
RENEWAL OF ANNUAL
PROFESSIONAL SURVEYING & MAPPING/GIS SERVICES AGREEMENT
This shall serve as mutual consent to extend the Agreement between Indian River County
and Southeastern Surveying & Mapping Corporation for Professional Surveying & Mapping
Services from October 1, 2015 to September 30, 2016.
All provisions of the original agreement, approved October 1, 2013 and as amended
October 7, 2014 shall remain in full force and effect. The attached fee schedule (Exhibit "A")
shall remain in effect from October 1, 2015 to September 30, 2016.
SOUTHEASTERN SURVEYING &_
MAPPING CORPORATION
`2 :0
TITLE: Gary B. dk, PresicEri
•
Witness „ris: :"o
James L. Petersen, PSM / Sr. Vice President
INDIAN RIVER COUNTY, FLORIDA
Approved by BCC: Se
Attest: b
f+z: j fie R. mith,
And Comptroller
tether 15;.,
1
Clerk of the irc it Court
c(c,,Dylan Reingold, County Attorney
�- C •
C (tg2tx.D 1{401. -•
d
oseph ABaird, County Administrator
C\Users\rbess\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\F6M25TFZ\05-15-2015 Southeastern Surveying
Mapping Corp Inc Renewal 2015-2016.doc
Steven L. Anderson, Jr., PSM, PLS
Charles M. Arnett, PSM
Russell G. Daly, PSM, PLS
Michael L. Dougherty, PSM
Bruce C. Ducker, PSM
James M. Dunn, II, PSM
Mark J Efird, PSM
Thomas F Ferguson, PSM
Ronnie A. Figueroa, PSM, GISP
Tate B. Flowers, PLS
Robert W Gardner, PSM
Brian R. Garvey, PE
Daniel J. Henry, PSM, PLS
Mathew G. Jennings, RLS
Gary B. Krick, PSM
Brad J. Lashley, PSM, PLS
Myron F Lucas, PSM
James E. Mazurak, PSM
Land Surveying & Mapping Services • Sub -Surface Utility Designation & Location Services • Geographic Information Sys
////iia i ti u\AL
rS_Ol�th as terll\--i
�i
*/ \�
t \®
Southeastern Surveying and Mapping Corporation
Serving the Southeast Since 1972
www.southeasternsurveying.com
info@southeastemsurveying.com
Thomas K. Mead, PSM, PLS
Timothy 0 Mosby, PSM
James L. Petersen, PSM
William C Rowe, PSM
Tony G. Syfrett, PSM, PLS
John S. Thomas, PSM
Edward W Wackerman, PLS (FL)
Brad Stroppel, El, GISP
Kirk R. Hall, El, GISP
Catherine E. Galgano, GISP
Cheryl A. Isenberg, GISP
Patrick J. Phillips, GISP
Thomas P Young, Jr , SIT, GISP
Donna L. Canney, CST IV
Frank B. Henry, CST IV
David M. Rentfrow, CST IV
Steve D Smith, CST IV
Celeste B. van Gelder, CST IV
terns • GPS Asset Inventories
October 1 — September 30, 2016 Fee Schedule
Surveying & Mapping Services
Personnel Classification
Professional Surveyor &
Mapper/PSM
Expert Witness
Senior Technician
CAD Technician
Survey Division
1 Man Field Crew
2 Man Field Crew
3 Man Field Crew
4 Man Field Crew
GIS Mapping Services
Personnel Classification
Professional Engineer
GIS Analyst
GIS Technician
2 Man GPS Crew
1 Man GPS
Plat Review Services (if required)
Initial Review includes Second Review
Plat (initial and second review)
Typical Work Tasks
Project Management, Project Surveyor
Quality Control/Quality Assurance Reviews
If required
Project Calculations
Preparation of Descriptions
Drafting of Projects,
Preparation of Sketches for Descriptions
Completes field data collection and inventory.
Performs reconnaissance activities for
completion of survey related tasks.
Typical Work Tasks
Project Management
Quality Control/Quality Assurance Project Reviews
Database Design, Programming/
Quality Control/Quality Assurance
Data Entry, Data Editing
Field Asset Inventory (sub -meter)
Field Asset Inventory (sub -meter)
Third or Additional Review Same Plat
Plat (third or additional reviews of same plat)
Hourly Billing Rate
$124.00 / per hour
$237.00 / per hour
$88.00 / per hour
$77.00 / per hour
$88 00 / per hour
$115.00 / per hour
$149.00 / per hour
$170.00 / per hour
Hourly Billing Rate
$118.00 / per hour
$88.00 / per hour
$77.00 / per hour
$118.00 / per hour
$67.00 / per hour
$618.00 / per Plat (all Plats
regardless of size)
$257 00
6500 All American Blvd
Orlando, FL 32810
407.292.8580
407.292.0141 Fax
1130 Highway 90
Chipley, FL 32428
850 638.0790
850.638.8069 Fax
Cypress Business Center
8301 Cypress Plaza Drive,
Suite 104,
Jacksonville, FL. 32256
904 737 5990
904.737.5995 Fax
119 West Main Street
Tavares, FL, 32778
352.343.4880
352.343.4914 Fax
10 East Lake Street
Kissimmee, FL 34744
407 944.4880
407.944.0424 Fax
University Corporate Park
10770 North 46a' Street,
Suite C300
Tampa, FL 33617
813-898-2711
813-898-2712
Licenses: PSM/PLS: Florida Professional Surveyor & Mapper • PLS: Alabama Professional Land Surveyor • RLS: Georgia Registered Land Surveyor • PE. Professional Engineer
Certifications: El: Engineering Intern • GISP Geographic Information Systems Professional • CST Certified Survey Technician
Page 2
Subsurface Utility Engineering Services
Designating Services
Project Manager
Senior Technician
2 man crew
3 man crew
Vacuum Excavation
Test Holes
1 Test Hole/Dirt
1 Test Hole/Asphalt/Concrete
2 - 19 Test Holes/Dirt
2 - 19 Test Holes/Asphalt/Concrete
20 - 49 Test Holes/dirt
20 - 49 Test Holes/asphalt/concrete
50 - 99 Test Holes/dirt
50 - 99 Test Holes/asphalt/concrete
100 or more Test Holes/dirt
100 or more Test Holes/asphalt/concrete
GPR Bore Route
Vacuum Excavation for Environmental Services
Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand
10 feet prior to drilling. (3"-4" in diameter, 8' to 10' deep, concrete/asphalt removed if necessary)
1 - 9 Monitoring Wells/Soil Samples
10 - 19 Monitoring Wells/Soil Samples
20 - 49 Monitoring Wells/Soil Samples
Utility Clearing - Using Ground Penetrating Radar
as well as Conventional Electronic Line Locators
$118.00 / per hour
$88 00 / per hour
$191.00 / per hour
$2221.00 / per hour
$422.00
$525.00
$361.00 / each
$412.00 / each
$330.00 / each
$371.00 / each
$283.00 / each
$330.00 / each
$252.00 / each
$288 00 / each
$515.00 / each
digging down 8 feet to
An hourly rate of $294.00 will be used for all exploratory excavation projects.
Larger excavation projects which require specialized equipment (shoring, de -watering, etc.) will b
task basis.
Utility Coordination Services
Senior Utility Coordinator
Utility Coordinator
CAD Technician
Survey Services for Utility Projects
Project Manager/Professional Surveyor and Mapper
Two Person Survey Field Team
Three Person Survey Field Team
Clerical
Concrete Radar Mapping/Imaging
(concrete assessment/inspection, grid scans, density & debris assessment)
1 Man Crew
Closed Circuit Televising (CCTV) Services
Maintenance of Traffic (MOT)
If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of
same
SSMC MOT Lane Closures Per Lane Closure
$258.00 / each
$206.00 / each
$155.00 / each
$118.00 / per hour
e quoted on a task by
$118.00 / per hour
$88.00 / per hour
$77.00 / per hour
$118.00 / per hour
$118.00 / per hour
$149 00 / per hour
$52.00 / per hour
$118.00 / per hour
$118.00 / per hour
Gary B Krick, PSM / President
Per Lane Closure
May 19, 2015
Date
$361.00 / per day
$515.00 / per night