Loading...
HomeMy WebLinkAbout2015-184Indian River County Department of Utilities LABOR COST ESTIMATE FROM CONTRACTOR'S BID ITEM LIST BLUE GOOSE CONSTRUCTION Project : VISTA ROYALE GALVANIZED WATER MAIN AND SERVICESREPLACEMENT Date: 9/3/2015; UCP 4120; WI.P 47123536-044699-15514 Blue Goose LABOR COST MATERIAL COST Bid Item No. Bid Item Description _ Estimated Quantity Unit of Measure Labor Unit Price Total Labor Price 4aterial UnTotal Price Material Price 71 Mobilization, Demobilization, MOT 1.0 % 0.10 $5,181.90 07a30 Install 2" HDPE Blue Stripe Directional Drill (DRIincluding fusion of pipe and fittings Water 300.0 LF $33.35 510,005.00 54.87 51,461.00 O1 bInstall 4" Blue PVC Water Main 100.0 LF 55.50 $550.00 $2.81 5281.00 07a(DR11) Install 4" HDPE Blue Stripe Directional Drill including fusion of pipe and fittings 700.0 LF $33.35 $23,345.00 54.87 53,409.00 09 Install Mechanical Restrained Joint DI Fittings 0.5 TON $4,100.00 $2,050.00 $3,500.00 51,750.00 16a Install 3" Wet Tap w/gate valve 2.0 EA 5900.00 $1,800.00 51,200.00 52,400.00 19a Install 4" GV&B 2.0 EA. $85.00 5170.00 5295.74 5591.48 23 Test Holes / Potholes 20.0 EA. 5250.00 55,000.00 29a Fill, pressure test, chlorinate and flush water main 1,100.0 LF $1.50 51,650.00 $100.00 5100.00 30c Take Bacterial Sample/Deliver to Lab 10.0 EA $150.00 51,500.00 65 Sawcut, Remove and Dispose of Asphalt Pavement 1.0 TON $30.00 $30.00 66a Install Asphalt Cement Type S-1 Over Compacted Base 1.0 TON 560.00 560.00 570.00 570.00 67b Remove, Dispose of and Replace Rock Base Course 1.0 TON $20.00 $20.00 $8.00 58.00 67cSubgrade Remove, Dispose eland Replace Stabilized 1.0 TON $14.00 514.00 $8.00 58.00 86a Lawn Restoration (Topsoil and Sod) 2500 SY $2.25 $5,625.00 51.50 $3,750.00 Subtotal Subtotal Water System Labor and Materials 551,819.00 $13,828.48 70 Record Drawings per IRCDUS Standards 1 LS $3,000.00 Subtotal Subtotal Water System Labor, Mob., Demob., Materials, & Permitting 560,000.90 513,828.48 Force Account IRCDUS Contingency Account 1 EA 56,000.09 51,382.85 S u bTota I 566,000.99 515,211.33 **TOTAL 581,212.32 ATTACHMENT 1 WORK AUTHORIZATION DIRECTIVE No. 201.5402 IRC — REPLACE GALVANIZED WATER MAIN AND GALVANIZED WATER SERVICES IN VISTA ROYAL BLUE GOOSE CONSTRUCTION DATE OF ISSUANCE: October 2015 EFFECTIVE DATE: October 2015 OWNER. Indian River County CONTRACTOR: Blue Goose Construction CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS L.AI3OR CONTRACT, BID NO. 2015001. AWARDED September 9. 2014 PROJECT: Construct 1100' of 4" and 2" 1 IDPE Dir. Bores to replace galvanized water. pipe COUNTY UTILITY PROJECT NO.: UCP #4120 CONTRACTOR'S PROJECT NO.: I.; A COUNTY WIT', No. 47123536:24.402-15,514 You are directed to proceed promptly with the following work; Description: Replace the corroded 3" galvanized water main and corroded 2" water services on Pine Arbor Lane. Attachments: (List documents supporting work) Method of determining Contract Price: El Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of County Commissioners on September 9, 2014 to Blue Goose Construction, Ise Q Lump Sum Cost of the Work The Cost of _Labor, Contingency and Con net Time Is sumrr_arizeti below: Estimated Labor Cost (rounded) _ $66,000.99 Estimated Contract Time: 60 days •-1 i Estimated Labor Cost (rounded) $66,009.99 .. ACCEPTED: 11:ECOMMENDED. Blue Goose Construction Labor Contractor Date: Cordon E. Sparks, P.E. Environmental Engineer Date: -_ y-/6' — /s APPROVED; COUNTY, CHAIRMAN Wesley S. Davis DM:September 72, ?015 Attest: Jeffrey R. Smith, Clerk of . ��t top of rn e n t 2 'Circuit Court and Comptroller ; �o.• :,, rF9N• •. • Deputy Clerk; :' ��.. Off• • Z' CAUscralsbusli\AppDatAl_ocalNieresgfllWindowslTentpanry lnteroet Film\CoJugnt,UutlooW LTR4YV\A3 • WA 041,j}tziAlgrilNlo 2015- 002:.doc