HomeMy WebLinkAbout2015-195WORK ORDER NO. 1
43RD AVENUE BRIDGE OVER IRFWCD SOUTH RELIEF CANAL RAILING REPAIR
IRC NO. 1523
This Work Order Number 1 is entered into as of this 6th day of Ortnher , 2015,
pursuant to that certain Continuing Contract Agreement for Professional Services, dated November 15,
2011, and that certain Extension and Amendment of Continuing Contract Agreement for Professional
Services entered into as of the 4th day of November, 2014 (collectively referred to as the "Agreement"), by
and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and
Wantman Group, Inc. ("Consultant") (fka Bridge Design Associates, Inc.).
The COUNTY has selected the Consultant to perform the professional services set forth on
Exhibit "A" (Scope of Work), attached to this Work Order and made part hereof by this reference.
The professional services will be performed by the Consultant for the fee schedule set forth in
Exhibit "A" (Fee Schedule), -attached to this Work Order and made a part hereof by_ this reference.
The Consultant will perform the professional services within the timeframe more particularly set
forth in Exhibit "A" (Time Schedule), attached to this Work Order and made a part hereof by this
reference all in accordance with the terms and provisions set forth in the Agreement. Pursuant to
paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the
terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in
each individual Work Order as if fully set forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order No. 1 as of the
date first written above.
CONSULTANT:
WANTMAN GR
By:
P, INC.
Title: Structures Project
Principal
BOARD OF COUNTY COMMISSIONF, • ��, !K?"1.14,�,
OF INDIAN RIVER COUNTY f°*=
r
BCC Approved Date: October 6, 2015
Attest: Jeffrey R. Smith, •' erk of Court an • Comptroller
_dill‘le: _ __...011....--....V
1
•r ► i 1 1 IBIS . II
By:
Approved:
y Clerk
oseph A. Baird, County Administrator
Approved as to form and legal sufficiency:
lan T. Rei gold, County Attorney
oar
September 11, 2015
Indian River County
1801 27th Street
Vero Beach, Florida 32960
Attention: Richard B. Szpyrka, P.E.
Project: 43`d Avenue Bridge over South Relief Canal Bridge Railing Repair
Indian River County No. 1523
Dear Rich:
Pursuant to the County's request, Wantman Group Inc. (WGI) can provide the necessary
engineering services for the proposed repairs to the damaged railing.
Based on our discussions with staff, we will review modifying the current post and beam traffic
railing by utilizing a retrofit guardrail system as shown in FDOT Index 470's or by modifying to a
crash tested barrier system.
In order to provide the necessary design and detailing we will obtain field measurements of the
existing bridge and obtain a site topographical survey of the bridge site and canal banks on all four
corners of the bridge within the existing roadway rights-of-way.
Our team will also submit to Indian River Farms Water Control District for a permit to modify the
current guardrails inside their right-of-way.
Our services will include plans and specifications and details necessary to bid the project.
Indian River County will provide the necessary survey.
Our design will be based on current FDOT and Indian River County Standards.
We will provide 5 signed and sealed sets of completed plans as well as an electronic version for
your use.
The attached Exhibit "A" is an approximate hourly breakdown by task for our services based on our
approved hourly rates under our Continual Contract Agreement.
Permit fees are not included in our proposal.
WGI proposed to complete the work 60 days following notice to proceed.
If you have any questions, please give me a call.
Respe Ily,
B ' an C. Rheault, P.E., #38797
S:\2015-Jobs\_Proposals\43rd over S Relief Canal railing\01 Admin\Proposals\proposal 09-11-15.docx
1402 Royal Palm Beach Blvd , Bldg 200, Royal Palm Beach. FL 33411 t: 561 686 3660 1: 561.791 1995 www wantmangroup.com
BRIDGE DESIGN ASSOCIATES, INC.
43RD AVENUE OVER SOUTH RELIEF CANAL
BRIDGE RAILING REPAIR
September 11, 2015
HOURLY BREAKDOWN OF SERVICES
EXHIBIT "A"
ACTMTY
PROJECT
MANAGER
PROJECT
ENGINEER
FIELD REP
E.I.
CAD
TECHNICIAN
TOTAL
HOURS
BY
ACTMTY
LABOR
COST
BY
ACTMTY
1185.00
192.00
880.00
193.00
Coordination Meetings
4.0
4.0
1740.00
Site Visit
5.0
5.0
10.0
8880.00
Design & Detailing
2.0
8.0
6.0
24.0
38.0
83,634.00
Plans & Details
4.0
8.0
12.0
51,476.00
Pemiitting Application
2.0
4.0
4.0
6.0
16.0
$1.616.00
TOTAL MANHOURS
12.0
23.0
15.0
30.0
80.0
DIRECT LABOR COST
82,220.00
12,116.00
51,200.00
82,790.00
88,326.00
88,326.00
S12015-JobsLProposatM43rd over S Relief Canal ra6np101 Admlr ProposaIMExt tbh A 09.11-15.x5