Loading...
HomeMy WebLinkAbout2015-202Indian River County Emergency Services District Board of Commissioners 4225 43rd Avenue Vero Beach, Florida 32960 Telephone: (772) 226-3900 FAX: 772-567-9323 Project: Fire Station 1, 1500 Old Dixie Site Work, Preparation and Improvements Emergency Services District WORK ORDER NO. 2 FOR DESIGN/BUILD AGREEMENT PHASE IV WITH Barth Construction, Inc. This Work Order No. 2 adds additional scope of work to Work Order No. 1 -dated December 16, 2014, is in accordance with the existing DESIGN/BUILD AGREEMENT PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian River County (County) Work Order No. 2 agreement is as follows SECTION I — PROJECT LIMITS -4 This Work Order No 2 includes tasks and services for the Design/Builder to perform in connection with demolition and construction of the existing building. SECTION II - SCOPE OF SERVICES As agreed upon between Design/Builder and County, that the Design/Builder shall provide all engineering, architectural and construction services to complete all tasks as outlined in Work Order No. 2 specifically detailed in the attached proposal. The additional services include, • Demolition of existing interior finishes on both the living and working sides of the station building • Minor structural enhancements to bring the structure into compliance with current building codes. • Two new storefront entrance doors and one new exterior window. • Three new HVAC systems including new metal ductwork. • New interior partitions, walls, floor and ceiling finishes • New interior layout, finishes and equipment will generally match those provided and installed at the recently completed Station 13 1 IRCESD Work Order No 2 Barth Construction, Inc Fire Station 1 October 6, 2015 Page 2 of 3 • Removal of the planter walls and fill adjacent to exterior walls, patch stucco as required and new paint on the exterior of the building. • New roof on both the flat and sloped roof SECTION III — TIME. FOR COMPLETION & DELIVERABLES/WORK PRODUCT 1 The Design/Builder shall provide the County: a. Work Product and digital versions are to prepared and submitted so that the County or other consultants can readily use it for the design and analysis of the area, as defined It shall contain all information necessary for third -party surveyor to independently recreate and/or utilize the survey work. It is acknowledged all final products become property of the County 2 The services shall be completed by the Design/Builder and delivered to the county within 180 days for notice to commence SECTION IV — COMPENSATION The County agrees to pay, and the Design/Builder agrees to accept, for the above described services rendered as identified in Sections I, II, and III of this Amended. Work Order No. 1, for a total amount of $1,307,892 00 Any additional services not described hereon shall be pre -approved by the County All invoicing shall include itemized costs and materials expended to complete the Work. Payments shall be in accordance with the original Agreement dated December 6, 2012. The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein 2 IRCESD Work Order No 2 Barth Construction, Inc Fire Station 1 October 6, 2015 Page 3 of 3 IN WITNESS WHEREOF the parties hereto have executed these presents this 13th day of October, 2015 OWNER: BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORl9.A ••y ...„ ......1..3 S/p^✓F L.„.....---...------ ic•): jn) .* : (Signature) s,.(4- `, oma; .(Si nature) i Wesley S Davis, Chairman `; 09�.... -�.: �A � lis R/iR CO��� .. Jason Fyk s DESIGN/BUILDER: BARTH CONSTRUCTION, INC Approved by BCC October 13. 2015 ATTEST: Jeffrey R. Smith, Comptroller and Clerk of Circuit Court Deputy Jerk Approved as to Form and Legal S,afficiency: William K. DeBraal Deputy County Attorney ,* •�.tJ� Josep A. Bair County Add ministraor 3 Project Manager Witnessed by: (Signature) (Printed name)