HomeMy WebLinkAbout2008-092UNDERGROUND DISTRIBUTION FACILITIES INSTALLATION AGREEMENT 3I( WR # 2715424 a )' - a 902 This Agreement, made this day of 2008, by and between INDIAN RIVER COUNTY BOARD OF COUNTY COMMISIONERS (hereinafter called the Customer) and FLORIDA POWER & LIGHT COMPANY, a corporation organized and existing under the laws of the State of Florida (hereinafter called FPL). WITNESSETH: Whereas, the Customer has applied to FPL for underground distribution facilities to be installed on Customer's property known as SPOONBILL MARSH - BRINE MITIGATION PROJECT located in VERO BEACH - INDIAN RIVER COUNTY, Ronda. (City/County) That for and in consideration of the covenants and agreements herein set forth, the parties hereto covenant and agree as follows: 1. The Customer shall pay FPL a Contribution in Aid of Construction of $52.345.50 (the Contribution) to cover the differential cost between an underground and an overhead system. This is based on the currently effective tariff fled with the Florida Public Service Commission by FPL and is more particularly described on Exhibit A attached hereto. 2. That a credit of $12,820.30 shall be provided to the Customer for trenching, backfilling, installation of Company provided conduit and other work, as shown on Exhibit A, if applicable, and approved by FPL. existing overhead or underground facilities to serve the property identified above. 3. The contribution and credit are subject to adjustment when FPL's tariff is revised by the Florida Public Service Commission and the Customer has requested FPL to delay FPL's scheduled date of installation. Any additional costs caused by a Customer's change in the Customers plans submitted to FPL on which the contribution was based shall be paid for by the Customer. The contribution does not include the cost of conversion of any existing overhead lines to underground or the relocation of any existing overhead or underground facilities to serve the property identified above. 4. That the Contribution provides for 277/480 volt, THREE phase (1201240 volt, single phase for URD Subdivisions) underground electrical service with facilities located on private property in easements as required by FPL. The contribution is based on employment of rapid production techniques and cooperation to eliminate conflicts with other utilities. Underground service, secondary, and primary conductors are to be of standard FPL design, in conduit, and with above -grade appurtenances. 5. That the payment of the Contribution does not waive any provisions of FPUs Electric Tariff. If the property is subject to an underground ordinance, FPL shall notify the appropriate governmental agency that satisfactory arrangements have been made with the Customer as specified by FPL. legal description, and exact Customers construction site, Title to and ownership of the facilities installed as a result of this agreement shall at all times remain the property of FPL. 6. That good and sufficient easements, including legal descriptions and survey work to produce such easements, and mortgage subordinations required by FPL for the installation and maintenance of its electric distribution facilities must be granted or obtained, and recorded, at no cost to FPL, prior to trenching, installation and/or construction of FPL facilities. FPL may require mortgage subordinations when the Customers property, on which FPL will install its facilities, is mortgaged and (1) there are no provisions in the mortgage that the lien of the mortgage will be subordinate to utility easements, (2) FPL's easement has not been recorded prior to the recordation of the mortgage, (3) FPL's facilities are or will be used to serve other parcels of property, or (4) other circumstances exist which FPL determines would make such a subordination necessary. a) The Customer shall furnish FPL a copy of the deed or other suitable document, which contains a full legal description, and exact Customers construction site, name of the legal owner to be used when an easement is prepared, as required by FPL. b) The Customer shall furnish drawings, satisfactory to FPL, showing the location of existing and proposed structures on the Customers construction site, as required by FPL. c) Should for any reason, except for the sole error of FPL, FPL's facilities not be constructed within the easement, FPL may require the customer to grant new easements and obtain any necessary mortgage subordinations to cover FPL's installed facilities, at no cost to FPL, and FPL will release the existing easement. Mortgage subordinations will be necessary in this context when 1) the Customers property on which FPL will install its facilities is mortgaged, 2) there are no provisions in the mortgage for subordination of the lien of the mortgage to utility easements, or 3) FPL's facilities are or will be used to serve other parcels of property. WR # 2715424 Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the following: a) Paving, grading, and drainage plans showing all surface and sub -surface drainage satisfactory to FPL, b) A construction schedule, c) An estimate of when electric service will be required, and d) Copies of the Customers final construction plans as well as other constmction drawings (plot, site, sewage, electrical, etc.) requested by FPL plats provided by the Customer must be either recorded by the circuit clerk or other recording officer or prepared and certified as meeting the requirements for recording (except approval by the governing body) by a registered land surveyor. Prior to FPL construction pursuant to this agreement, the Customer shall: a) Clear the FPL easement on the Customers property of tree stumps, all trees, and other obstructions that conflict with construction, including the drainage of all flooded areas. The Customer shall be responsible for Gearing, compacting, boulder and large rock removal, stump removal, paving and addressing other special conditions. The easement shall be graded to within six inches of final grade with soil stabilized. b) Provide property line and corner stakes, designated by a licensed surveyor, to establish a reference for locating the underground cable trench route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes identifying the location, depth, size and type facility of all non -FPL underground facilities within or near the easement where FPL distribution facilities will be installed. The Customer shall maintain these stakes, and if any of these stakes are lost, destroyed or moved and FPL requires their use, the Customer shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent, employee, contractor or subcontractor of FPL, in which case FPL will pay the Customer the cost of replacing the stakes. c) It is further understood and agreed that subsequent relocation or repair of the FPL system, once installed, will be paid by the Customer if said relocation or repair is a result of a change in the grading by the Customer or any of the Customers contractors or subcontractors from the time the underground facilities were installed; and, that subsequent repair to FPL's system, once installed, will be paid by the Customer if said repair is a result of damage caused by the Customer or any of the Customers contractors or subcontractors. d) Provide sufficient and timely advance notice (40 days) as required by FPL, for FPL to install its underground distribution facilities prior to the installation of paving, landscaping, sodding, sprinkler systems, or other surface obstructions. In the absence of sufficient coordination, as determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none of the costs of restoring paving, landscaping, grass, sprinkler systems and all other surface obstructions to their original condition, should they be installed prior to FP2s facilities, shall be borne by FPL. e) Pay for all additional costs incurred by FPL which may include, but are not limited to, engineering design, administration and relocation expenses, due to changes made subsequent to this agreement on the subdivision or development layout or grade. f) Provide applicable trenching, backfilling, installation of Company provided conduit and other work in accordance with FPL specifications more particularly described on Exhibit B attached hereto. At the discretion of FPL, either correct any discrepancies, within two (2) working days, found in the installation that are inconsistent with the instructions and specifications attached to this agreement or pay the associated cost to correct the installation within thirty (30) days of receiving the associated bill, and in either case, reimburse FPL for costs associated with lost crew time due to such discrepancies. g) Provide a meter enclosure, downpipe and ell which meet all applicable codes and FPL specifications and which will accommodate FPL's service cable size and design. These items must be confirmed with FPL prior to purchase. FPL will not be responsible for costs involved in modifying or replacing items which do not meet the above criteria. 9. FPL shall: a) Provide the Customer with a plan showing the location of all FPL underground facilities, point of delivery, and transformer locations and specifications required by FPL and to be adhered to by the Customer. b) Install, own, and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted. c) Request the Customer to participate in a pre -construction conference with the Customers contractors, the FPL representatives and other utilities within six (6) weeks of the start of construction. At the pre -construction conference, FPL shall provide the Customer with an estimate of the date when service may be provided. 10. This Agreement is subject to FPL's Electric Tariff, including but not limited to the General Rules and Regulations for�Electhd Service and the Rules of the Florida Public Service Commission, as they are now written, or as they may be revised, amendeor supplemented. _ 11. This agreement shall inure to the benefit of, and be binding upon, the successors and assigns of the C,gstorn—erand.FPL The Customer and FPL will coordinate closely in fulfilling obligations in order to avoid delays in providing- permanent'elebtric service'at the Time of the Customers receipt of a certificate of occupancy.- ted: Aocepte " For FPL (Date) Sandra . Bowden 121i� Customer APPROVED AS TO FORM AND LEGAL SUFFICIENCY witness (Date) f gYwitness (Date) WILLIAM K. DEBRML DEPUTY COUNTY ATTORNEY UCD TARIFF ESTIMATE(UCD Tariff Effective: 1010912001 WRR DATE: InV2006 PROJECT E- LOCATION DESIGNER OFdtren fOF UNITS CHARGES CREOIis (1]3-03.4,) Primary ceed150feet fimm vs and tsfactf rlocip rat), pad mounted innslormerantl trench with cabletincontluil not to exceed 150 feet for ntluls and 300 feet for IoaPa. I33A2A) HaMhales and Padmounbtl Secondary Junction Boxes, excluding connections (131A2.tl4) Handholes (13.2.12tllA) Small 24'handhole Fmm Overhead Termination Point (13.2.12.a.1) Single Phase Radial $9".87 X city (132.12.a1) Two Phase Radial 62,29].]] X of (132.12.a.3) Three Phase Radial -150KVA $1,183.51 X qty (13.2.12.a.4) Three Phase Radial -300 KVA 3366.01 X qty (13.2.12.a.5) Single Phase loop 82,294.39 X qty (13.2.12.a.6) Two Phase Loop $4,]6].24 X qty (13.1.12.a.7) Three Phase Loop -150 KVA $5,761.59 X qty 113.2.12.a.71 Three Phase Loop -300 KVA $4,376.69 X qty 13.2A2.b) Secondary riser and latent, excluding hantlhole or junction box, with connection W Applicant's service cables no greater than 20 fast from Company deer pole. (13112b.1) Small Single Phase" TPX or smaller 3453.38 Xperuser per It. (13212.61) LargeSngle Phase largerthan 410 TPX $"3.18 X Por neer (13212.6.3) Small Three Phase" OPXm orsaller $641 .W X peruser (13.2.11b.4) Large Three Phase larger than 410 OPX $1,261." % Per riser (13.2.12.[) Small UG commercial services ISO Amp IM 1125 Amp 120 UW per SPO 21010.4) (13212eta)2who (120V) service an accessible wood pole SSM.93 Xperstrvm:e (13.2.12.0.1a) 3 w n (120CAOV) semice on accessible wood pole 1551." Xrgiperservice Per service (13212cta12wire (120V) service on Inaccessible wood pole 3609.88 XPer servi ce (13 212 [ 2.b) 3 wire (120I24OV) service on Inaccessible wood pole 5623.32 Xper service(13 212 c 3.q 2 wire (120V) semce on accessible concrete polo 1554.07 XPer •ervke (13212c3.b)3wine (I20124OV) service on accessible conchae Pole $576.41 X I33A2A) HaMhales and Padmounbtl Secondary Junction Boxes, excluding connections (131A2.tl4) Handholes (13.2.12tllA) Small 24'handhole $168.98 Xper HH 113.2.13 d 1 b) Intermedate 30 hantlhole $197.50 X Per HH 113.2.12 d l.e) L No" hantlhole $685.83 X , per HH it 3.2.12tl2I Pad Mounted Junction Box (PM T%Dummy $1,525.31 X per hox Cabinet MSS 1116140000-7) _ 4 ;perbox (IMA2..3.a) Pad Mounted Junction Cabinet 122 pori $10,993.11 X Per cabinet 3 phase cabinet MSS #161401004) (I3.2.12A.3.bl Tapping conducmre(B more than 12 sets) $57.88 XOPar set (13.2.12.e) Primary Splice Box including splices and cable pulling ut-um From Existing Underground NIA Use LeoP Price % NIA Use Loop Pru x NIA Use LooPPnca % NW Use Loop Price X $1,499.59 X $3,047.69 X ",160.1¢ X $2.775.09 X Termination Point j-. qty qty _, - qty '; try qty qry ! qty S i� qry % j box - $ s f $ S 2,A5." 311}$5.56 (13212e.1) Single Phase perbox $1,149.92 % :per box (13212e.2) Two Phase perbox 81,61423 X �Parbox 113212.e.3) Three Phase per box 311}$5.56 X _ 4 ;perbox 413.2.12.8 Additional installation charge for underground primary leMrals including trench and cabk'n-conduit which exceeds th limits set in 13.2.12.4, to reach FPL designated point of delivery. (1321211.1) Single Phase Per foot $1.97 X $per tt. (13212f.2) Two Phase Per foot 60.13 X ;perk (1321211) Three Phase Per foot 34.75 X 34115 ;perk (13212.9) Additional installation charge for underground Primary latemis including tench and cableJn-condult extended beryontl the FPL designated point of delivery. (13112g.1) Single Phase per foot $6.70 X per It. (13112.g1) Two Phase per foot $10.17 X perk (13112.g.3) Three phase per foot $12.10 X Patti. (131.12.h) UG Feeder (13.2.111h) 1000 KCMIL (not including switch package) (13 313 hl Switch Package (813 per Package) (13.212.h) Switch Package (Wit per Package) x' (13213.a) Trench and backfilling credits (13.2.13.a.1) Credit Par foot of primary trench (13.2.13.a1) Credit per foot of secondary tmnch 03.2.11b) Conduit installation credits (13 2.13.6.1) Credit per foot of 2- PVC (13.2.13.1c.2)Cretlilperfo0tof 5"PVC (13.2.13.[1 Handhole I Primary splice box installation credits (1 1213.[.1) Credit per large HH (greater than 30 I f PH Splice Bax (13.2.13.[.2) Credit per small) intermediate HH (30" of Mas) (13.2.13.4) TmnsfonnerI cap bank pad installation credits $15.37 X pertt. $21,837.67 Xeach f $21,03].6] X ,:I: each 3 - 3 - S 7,142.24 16 6 - S - S ,363.)5 s a226.7s S 21,"].6] 6 260 $ x k perf 873].00 $2.61 % perh. y $0.45 XPar ft. y $0.63 X Par ft E 2,359.35 $174.25 X �HH(s) f 697,00 $45.81 X HH(s) It (13.2.134.) Credit per Pad $26.95 X Oasis) Feeder Splice Box Credit(FDRSPLICESOX-07460) $661.08% h Pedmount Switch Chamber Credit(FDRSWPAD-07460) $423.05 % ash Additional Charges (e.g. non -rapid uenthin9, restoration, etc.) TOTAL CONTRIBUTION LESS TOTAL CREDITS TOTAL CASH PAYMENT TOTAL CUSTOMER PAYMENT (CONTRIBUTION MAT + LABOR) (Miscellaneous Trench Purchase must be used N credits exceed total contribution amount. Inventory on work request see SPO 21450.2) L1112M 10:48AM (CONTRIBUTION CASH) 3 0 f 52 34530 S 12,020.30 f 39,52510 S 6 s f S 3 - 3 - S 7,142.24 16 6 - S - S ,363.)5 s a226.7s S 21,"].6] 6 260 $ x k perf 873].00 $2.61 % perh. y $0.45 XPar ft. y $0.63 X Par ft E 2,359.35 $174.25 X �HH(s) f 697,00 $45.81 X HH(s) It (13.2.134.) Credit per Pad $26.95 X Oasis) Feeder Splice Box Credit(FDRSPLICESOX-07460) $661.08% h Pedmount Switch Chamber Credit(FDRSWPAD-07460) $423.05 % ash Additional Charges (e.g. non -rapid uenthin9, restoration, etc.) TOTAL CONTRIBUTION LESS TOTAL CREDITS TOTAL CASH PAYMENT TOTAL CUSTOMER PAYMENT (CONTRIBUTION MAT + LABOR) (Miscellaneous Trench Purchase must be used N credits exceed total contribution amount. Inventory on work request see SPO 21450.2) L1112M 10:48AM (CONTRIBUTION CASH) 3 0 f 52 34530 S 12,020.30 f 39,52510 Work Request Charges Quotation FPL -Power Systems To: MIKE HOTCHKISS Quote Number: TC27154241 IRC BOARD OF COUNTY COMMISSION Description: UNDERGROUND SERVICE TO SPOONBILL 3833-042-0482 MARSH - BRINE MITIGATION PROJECT BASED 1801 27TH ST, BLDG A ON THE UCD TARIFF - IRC UTILITY VERO BEACH, FL 32960 CONTRACTOR TO INSTALL PVC, SPLICE CUSTOMER 0#374907 BOXES AND PAD EAST OF PMDS # 11 Quotation Details Description Loop-3PH Frm Exst UG TM Source (300KVA) Primary Splice Box & Splices-3PH Add Charge Exceeding Limit-3PH (per ft) UG Feeder (per ft) Switch Package Primary -Trench & Inst > 2" PVC (per ft) Lg HH/Primary Splice Box ( > 30") Concrete Pad for Pad Mount TX Quote Date: 2/11/2008 Preferred Option: Yes No. Payments: Project: Charges Due Before Work Starts: Tax: Charges Due On Completion: Tax: 39,525.20 0.00 Subtotal: 39,525.20 0.00 0.00 Subtotal: 0.00 Total Charges: 39,525.20 Total Tax: 0.00 Total Including Tax: 39,525.20 Total Refundable: 0.00 Total Non -Refundable: 39,525.20 Due Unit Before Refundable? Cost Quantity Total Work Paid No 21775.09 1 21775.09 Y No 11785.56 4 72142.24 Y No 4.75 3445 16,363.75 Y No 15.37 275 41226.75 Y No 21,837.67 1 21,837.67 Y No -3.23 3745 -12,096.35 Y No -174.25 4 -697.00 Y No -26.95 1 -26.95 Y Charges Due Before Work Starts: Tax: Charges Due On Completion: Tax: 39,525.20 0.00 Subtotal: 39,525.20 0.00 0.00 Subtotal: 0.00 Total Charges: 39,525.20 Total Tax: 0.00 Total Including Tax: 39,525.20 Total Refundable: 0.00 Total Non -Refundable: 39,525.20