Loading...
HomeMy WebLinkAbout2003-178A i FPL UNDERGROUND CONDUIT INSTALLATION AGREEMENT FPL WR# 526272 This Agreement, made this 22nd day of Jul Y , 201by and between INDIAN RIVER COUNTY BOARD OF COUNTY COMMISSIONERS ( hereinafter called the Customer) and Florida Power & Light Company, a corporation organized and existing under the laws of the State of Florida (hereinafter called FPL) . WHEREAS ; the Customer has requested the pre-approval of the location and installation of underground distribution facilities to be located in a described FPL easement provided by the Customer. WITNESSETH That , for and in consideration of the covenants and agreements herein set forth , the parties hereto covenant and agree as follows - 1 . The customer shall : a ) install conduit, cable markers and associated materials provided by FPL in accordance with the instructions and specifications attached to this Agreement ; b ) be solely responsible for the installation of conduit at the correct location and the correct depth pursuant to the FPL construction drawing and specifications ; c) provide reasonable notification of the conduit installation dates ; d ) at the discretion of FPL , either correct any discrepancies , within two (2 ) working days , found in the installation that are inconsistent with the instructions and specifications attached to this agreement or pay the associated cost to correct the installation within thirty (30 ) days of receiving the associated bill , and in either case , reimburse FPL for costs associated with lost crew time due to such discrepancies ; e ) provide survey points for FPL to stake the cable route ; f) notify FPL when the conduit installation is complete ; g ) provide "as built' prints within two (2 ) weeks of final installation ; h ) provide for pick-up of materials ; i ) assume liability for materials lost , stolen or damaged once the customer receives material ; j ) assume liability for any delays and/or additional costs to FPL caused by a conduit installation that is not consistent with the instructions and specifications attached to this agreement . 2 . FPL shall : a ) provide written instructions and specifications for the installation of FPL provided conduit; b ) provide required material to the Customer for the installation of underground facilities within the specified cable route ; c) provide staking for the Customer along the specified cable route ; 1 of 2 d ) apply a credit in the amount of $246 . 40 , in the event that the customer has made or has agreed to make a Contribution in Aid of Construction for the underground distribution facilities associated with this Agreement (if the credit exceeds the contribution , or if no contribution is required , a payment shall be made to the customer) ; e ) assume no liability for materials lost , stolen or damaged once received by the customer; f) furnish any additional material at the current cost plus applicable loading and delivery charges ; g ) assume no liability for delays caused by material delivery deficiency, including insufficient , lost , stolen or damaged material ; h ) assume no liability for delays because of misunderstanding of installation drawings or specifications ; i ) assume no liability for delays or additional cost caused by an inadequacy of the conduit system installation ; j ) assume no liability for special incidental or consequential damages of any nature . 3 . This agreement is subject to FPL's General Rules and Regulations for Electric Service and the Rules of the Florida Public Service Commission . 4 . Customer agrees to protect, defend , indemnify and hold FPL , its officers , directors , employees , and agents ( FPL Entities ) free and unharmed from and against any and all claims , liabilities , loss , costs , or damages whatsoever, related to any claim made by tenants , invites , licensees , quests , any other or third parties , including court costs and attorney's fees , whether or not due to or caused in whole or part by the negligence of FPL Entities , resulting from or in connection with the performance of this Agreement by either party hereto IN WITNESS WHEREOF the parties hereto have caused this Agreement to be duly executed to be effective as of the day and year written above . APPLICANT : FPL : SIGNED SIGNED NAME Kenneth R . Macht NAME ��(Jj(�/5 car /x���(� TITLE Chairman TITLE APPROVED : roe Woe, APATANTCOUWNTiYATTORNEY S TO FORM ANY BY ASS 2ot2 UCD TARIFF ESTIMATE (UCD Tariff Effective: 05121120021 MNL DATE: 6/19/03 PROJECT: L_.. LOCATION: DESIGNER OF UNITS # OF UNITS CHARGES il CREDITS (13.2.12.a) Primary lateral riser ( if from overhead termination point), pad mounted transformer and trench with cable-lnconduit not to exceed 150 feet for radials and 300 feet for loops. From Overhead Termination Point From Existing Underground Termination Point (13.2.12.a.1 ) Single Phase Radial $561 X qty NIA Use Loop Price X qty $ (13.2.12.a.2) Two Phase Radial $1 ,121 X qty N/A Use Loop Price X qty (13.2.12.a.3) Three Phase Radial - 150KVA $737 X qty NIA Use Loop Price X qty _ (13.2.12.a.4) Three Phase Radial - 300 KVA $0 X (13.2.12.a.5) Single Phase loop $1 ,430 X - qty NIA Use Loop Price X qty 1 qty S910 X qty g (13.2.12.a.6) Two Phase Loop $2,434 X qty $1 ,667 X qty g (13.2.12.a,7) Three Phase Loop $1 ,239 X qty $574 X qty E (13.2.12.b) Secondary riser and lateral, excluding handhole orjunction box, with connection to Applicant's service cables no greater than 20 feet from Company riser pole. (13.2.12.b.1 ) Small Single Phase 410 TPX or smaller $406 X riser(s) (13.2.12.b.2) Large Single Phase larger than 410 TPX $581 X riser(s) (13.2.12.b.3) Snell Three Phase 410 qPX or smaller $508 X riser(s) S 508.00 (13.2.12.b.4) Large Three Phase larger than 410 qPX $844 X I,% ; ' riser(s) g (13.2.12.c) Handholes and Padmounted Secondary Junction Boxes, excluding connections. (13.2.12.c.1 ) Handholes (13.2.12.c.1 .a) Small 24" handhole $143 X1 hh(s) $ 143.00 (13.2.12.c.1 .b) Intermediate 30" handhole $214 X hh(s) g (13.2.12.c.2) Pad rat dJunctiohandhole $583 X hh(s) (13.2.12.c.2) Pad Mounted Junction Box (PM TX Dummy 51 ,489 X box(s) Cabinet M&S #16110000-7) (13.2.12.d) Primary Splice Box including splices and cable pulling set-up (13.2.12.d.1 ) Single Phase per box 1943 X : - . _ box(s) (13.2.12.d.2) Two Phase per box 1 ,302 X box(s) $ - (13.2.12.d.3) Three Phase per box 51 ,433 X box(s) $ (13.2.12.e) Additional installation charge for underground primary laterals including trench and cableinconduit which exceeds the limits set in 13.2.12.a to reach FPL designated point of delivery. (13.2.12.e.1) Single Phase per foot $1 .43 X ft. ( 3.2.12.e.2) Two Phase per foot $3.02 X k. (I3.2.12.8.3) Three Phase per foot $3.58 X 1, 1 �j ft. g (13.2.12.f) Additional installation charge for underground primary laterals including trench and cableanconduit extended beyond the FPL designated point of delivery. (13.2.12.f.1 ) Single Phase per foot $5.02 X k. (13.2.12.f.2) Two Phase per foot $7.63 X k. (13.2.12.f.3) Three Phase per foot $9.17 X k $ $ (13.2.12.g) UG Feeder (13.2.12.g) 1000 (not including switch package) $10.90 X ft. (13.2.12.g) Switchh packpackage (9/3 per package) $79,290 X ea. (13.2.12.g) Switch package (616 per package) 5191290 X e8, $ - E (13.2.13.a) Trench and backfilling credits (13.2.13.a.1 ) Credit perfoot of primary trench $1.80 X 110 ft. $ 198.00 (13.2.13.a.2) Credit per foot of secondary trench $1 .50 X <r: ,y '-+ k. $ (I 3.2.13.b) Pvt installation credits (13.2.13.b.1 ) Credit per foot of 2" pvc 80.32 X ft. (I 3.2.13.b.2) Credit per foot of 5" pvc $0.44 X S 48.40 (13.2.13.c) Handhole / primary splice box installation credits (13.2.13.c.1 ) Credit per large hh (greater than 30") / pri splice box $123 X hh(s) g (13.2.13.c.2) Credit per small I intermediate hh (30" or less) $32 X hh(s) (13.2.13.d) Transformer pad installation credits (13.2.13.d.) Credit per pad $19 X 0 pad(s) Feeder Splice Box Credit (FDR BOX-07-060) $466 X 1 ea. Padmount Switch Chamber Creditdit (FD(FDRSWPAD-07860) $298 X ea. g Additional Charges (e.g. non-rapid trenching, restoration, etc.) 0 TOTAL CONTRIBUTION: S 651 .00 LESS TOTAL CREDITS: $ 246.40 TOTAL CASH PAYMENT: 1 404.60 TOTAL CUSTOMER PAYMENT $ 651 .00 (CONTRIBUTION MAT + LABOR) S 246.40 (Miscellaneous Trench Purchase must be used if credits exceed total contribution amount. Inventory on work order see SPO 21450.2) S _ (CONTRIBUTION CASH) $ 404.60 6118/03 5:14 PM