CHANGE ORDER
No. 3
PROJECT Indian River North County Water Treatment Plant Expansion
DATEOFISSUANCE January 22, 2008 EFFECTIVEDATEJanuary 22, 2008
OWNER Indian River County Department of Utility Services
OWN ER's Contract No, 200612
CDM Project No. 6706-43025-155
CONTRACTOR Poole and Kent Company of Florida Inc.ENGINEER Camo Dresser &McKee Inc
You are directed to make the following changes in the Contract Documents:
Description: Various changes and additional work summarized in the attached sheet
Reason for change order: Additional work at the owners request to improve plant.
Attachments: List documents supporting chane See Chan e Ord 3 S
CHANGE IN CONTRACT PRICE
er ummary Attached.
CHANGE IN CONTRACT TIME
Original Contract Price
Original Contract Times
S 21,080,300 00
Substantial Completion: September 3, 2008
Ready for final payment: January 1, 2009
Net changes from previous Change Orders
Das or dates
Net change from previous Change Orders
No. 1 to No. 2
No.1 to No. 2
$ ($515,808.00)
105
days
Contract Price prior to this Change Order
Contract Time prior to this Change Order
20,564,492 00
Substantial Completion: December 17, 2008
Ready for final payment: January 1, 2009
Increase (decrease) in this Change Order
Da s or dates
Net Increase in this Change Order
200,527.00
0
[Net
da s
ontract Price with all approved Change Orders
Contract Time with all approved Change Orders
20,765.019 00
Substantial Completion: December 17 2008
Ready for final payment: January 1, 2009
Da s or dates
APPROVED:
Engine (Autho 'zed Signature) erAuthorized Signature) gnature) Contractor (Authorized Signature) J
Sand L. L. Bowden, Chairman r�
Date: s' o Date: January 22 2008 Late: 7/3
EJCDC No. C-700 (2002 Edition) S fj ; F CF FLORIDA
SAN RIVER COUNTY
Prepared by the Engineers Joint Contract Documents Committee and endorsed by Ni � 1V Un FYTHATTHiS IS
General Contractors of America. RRECTCOPYOF
*;= ORIGINALON FILE IN THIS
G FICE
IEFFREYK.BARTON, E
6706-43015-155\2/2/07 Conformed 00800-21 co F_WMED
Change
order
22 L;nemicai meicnny „r
M
32 Fiberglass chemical room
37 Upgrade Scrubber Walkw
38 Future well conduits to nc
39 Irrigatiori Allowance and I
40 Credit for Hypochlorite in
., Rclnc7tinn of Panel for E
System
chlorite pump skids, which makes for
rpump and _component-change•out at- — -
:eS request. Chemical metering system
adds pressure relief valves for greater
=Actual
to integrate with county wide
Actual contract amount was inet line item in contract
security system integration
iced by two independentt best rice.
ier requested upgrade to replace corroded
al drip edge while doing construction project
is an owner requested upgrade of the
iting doors to the chemical rooms to be
aced with corrosion resistant fiberglass
odor control scrubber walkways from
I steel to aluminum for more chemical
conduit to north for additional well power
control, owners request because of new
point ($5,473.00) Shortens tllned sodium ncenpoinfrom between ground storage
tanks to after transfer um s.
on Clearwell $21,040.00 Relobecause of clearance conflict n of instrumentation with blowoe panel
housin .
ig Pond $11,355.00 Excavation of sediment from infiltration pond
after dewatering effort transported undesirable
Total Amount Change Order No. 3
Original Contract Price
Change Order Number 1
Change Order Number 2
Change Order Number 3
$2009527.00
Revised Contrail Price
$21,080,300
($804,632.00) $20,275,668.00
$288,824.00 $20,564,492.00
$200,527.00 $209765,019.00