HomeMy WebLinkAbout2008-028Zr�o3-C'73 CHANGE ORDER No. 3 PROJECT Indian River North County Water Treatment Plant Expansion DATEOFISSUANCE January 22, 2008 EFFECTIVEDATEJanuary 22, 2008 OWNER Indian River County Department of Utility Services OWN ER's Contract No, 200612 CDM Project No. 6706-43025-155 CONTRACTOR Poole and Kent Company of Florida Inc.ENGINEER Camo Dresser &McKee Inc You are directed to make the following changes in the Contract Documents: Description: Various changes and additional work summarized in the attached sheet Reason for change order: Additional work at the owners request to improve plant. Attachments: List documents supporting chane See Chan e Ord 3 S CHANGE IN CONTRACT PRICE er ummary Attached. CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times S 21,080,300 00 Substantial Completion: September 3, 2008 Ready for final payment: January 1, 2009 Net changes from previous Change Orders Das or dates Net change from previous Change Orders No. 1 to No. 2 No.1 to No. 2 $ ($515,808.00) 105 days Contract Price prior to this Change Order Contract Time prior to this Change Order 20,564,492 00 Substantial Completion: December 17, 2008 Ready for final payment: January 1, 2009 Increase (decrease) in this Change Order Da s or dates Net Increase in this Change Order 200,527.00 0 [Net da s ontract Price with all approved Change Orders Contract Time with all approved Change Orders 20,765.019 00 Substantial Completion: December 17 2008 Ready for final payment: January 1, 2009 Da s or dates APPROVED: Engine (Autho 'zed Signature) erAuthorized Signature) gnature) Contractor (Authorized Signature) J Sand L. L. Bowden, Chairman r� Date: s' o Date: January 22 2008 Late: 7/3 EJCDC No. C-700 (2002 Edition) S fj ; F CF FLORIDA SAN RIVER COUNTY Prepared by the Engineers Joint Contract Documents Committee and endorsed by Ni � 1V Un FYTHATTHiS IS General Contractors of America. RRECTCOPYOF *;= ORIGINALON FILE IN THIS G FICE IEFFREYK.BARTON, E 6706-43015-155\2/2/07 Conformed 00800-21 co F_WMED Change order 22 L;nemicai meicnny „r M 32 Fiberglass chemical room 37 Upgrade Scrubber Walkw 38 Future well conduits to nc 39 Irrigatiori Allowance and I 40 Credit for Hypochlorite in ., Rclnc7tinn of Panel for E System chlorite pump skids, which makes for rpump and _component-change•out at- — - :eS request. Chemical metering system adds pressure relief valves for greater =Actual to integrate with county wide Actual contract amount was inet line item in contract security system integration iced by two independentt best rice. ier requested upgrade to replace corroded al drip edge while doing construction project is an owner requested upgrade of the iting doors to the chemical rooms to be aced with corrosion resistant fiberglass odor control scrubber walkways from I steel to aluminum for more chemical conduit to north for additional well power control, owners request because of new point ($5,473.00) Shortens tllned sodium ncenpoinfrom between ground storage tanks to after transfer um s. on Clearwell $21,040.00 Relobecause of clearance conflict n of instrumentation with blowoe panel housin . ig Pond $11,355.00 Excavation of sediment from infiltration pond after dewatering effort transported undesirable Total Amount Change Order No. 3 Original Contract Price Change Order Number 1 Change Order Number 2 Change Order Number 3 $2009527.00 Revised Contrail Price $21,080,300 ($804,632.00) $20,275,668.00 $288,824.00 $20,564,492.00 $200,527.00 $209765,019.00