THIS AGREEMENT, dated the 13th day of May in the year 2003 by and
between Indian River County, a political subdivision of the State of Florida ( hereinafter called
OWNER) and Tr _as tr Coast Contracting Inc . ( hereinafter called CONTRACTOR) .
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth ,
agree as follows :
ARTICLE 1 . WORK
CONTRACTOR shall complete all work as specified or indicated in the Contract Documents . The
work is generally described as follows :
Construction of approximately 8 , 000 LF of 4" PVC water main , 6 , 000 If OF 6 " PVC water
main , 500 LF of 6 " Directional Drill water main , 2 , 500 LF of 12 " PVC water main , 10 Fire
Hydrant Assemblies , 120 single water services and 40 double water services in the
Florida Ridge Subdivision south of Vero Beach , Indian River County, FL . Construction
consists of, but is not limited to , utilities exploration , coordination with any permitting
agencies , trenching , dewatering , installation of pipe with fittings and all appurtenances ,
restrainers and soil compaction , disinfection , testing ( includes providing temporary
jumper or another approved method for disinfection and flushing) irrigation repair,
private property replacement or repair, franchise utility repair and traffic control . PVC
pipe shall be C -900 and/ or C -909 and Directional Drill pipe shall be C906 per Indian River
County Utility Standards and Specifications .
CONTRACTOR , as an independent contractor and not as an employee , shall furnish , for the sum
amount of $493 , 018 . 90, all of the necessary labor, material , and equipment to perform the work
described above in accordance with the Contract Documents .
ARTICLE 2 . ENGINEER
The project has been designed by Indian River County Utilities Department, hereinafter called
ENGINEER , and who is to act as OWNER'S representative , assume all duties and responsibilities
and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the work in accordance with the Contract Documents .
00530- 1
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 (Bid No. 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor. doc
• ARTICLE 3 . CONTRACT TIME ,
3 . 1 The work will be completed in accordance with the following time frame .
(a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor
shall complete the following tasks :
1 . Obtain all necessary permits .
2 . Receive approved shop drawings for all materials and equipment to be
utilized in the job .
3 . Perform all photographic recording and documentation of conditions prior
to construction .
4 . Locate all existing utilities in the area of work .
5 . Mobilize all labor, equipment , and materials .
6 . Deliver and store all equipment and materials to the job site .
7 . Notify all utilities and other affected parties prior to initiating construction .
( b ) From JL calendar days to JLQ calendar days from the effective date of Notice to
Proceed , the CONTRACTOR shall complete the following tasks :
1 . Install all pipe and appurtenant items .
2 . Perform all testing .
3 . Restore all disturbed areas to their pre-construction condition .
4 . Correct all deficiencies noted by Engineer.
Completion of all tasks outlined above ( i . e . , Subparagraphs a and b ) constitute
Substantial Completion .
( b ) From JJU calendar days to 1$Q calendar days from the effective date of Notice
to Proceed , the CONTRACTOR shall complete the following tasks :
1 . Clean up project area .
2 . Remove all equipment and material from project site .
3 . Perform contract close-out procedures .
Completion of all tasks outlined above ( i . e . , Subparagraphs a , b , and c) constitute Final
Completion .
3 . 2 Liquidated Damages . OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the work is not
completed within the times specified in Paragraph 3 . 1 above , plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions . They also recognize the
delays , expense and difficulties involved in proving in a legal proceeding the actual loss
suffered by OWNER if the work is not completed on time . Accordingly , instead of
requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages
for delay ( but not as a penalty) CONTRACTOR shall pay OWNER four-hundred and fifty
00530-2
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 (Bid No. 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor. doc
dollars ( $450 . 00 ) for each day that expires after the time specified in Paragraph 3 . 1 for
Substantial Completion , if CONTRACTOR shall neglect, refuse or fail to complete the
remaining work within the Contract Time or any proper extension thereof granted by
OWNER , CONTRACTOR shall pay OWNER four- hundred and fifty dollars ($450 . 00 ) for
each day that expires after the time specified in Paragraph 3 . 1 for completion and
readiness for final payment .
ARTICLE 4. CONTRACT PRICE .
4 . 1 OWNER shall pay CONTRACTOR for completion of the work in accordance with the
Contract Documents in current funds in the amount of $40 018 . 90
ARTICLE 5. PAYMENT PROCEDURES .
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions . Applications for Payment will be processed by ENGINEER as
provided in the General Conditions .
5 . 1 Progress Payments . OWNER shall make progress payments on account of the
Contract Price on the basis of CONTRACTOR'S Applications for Payment as
recommended by ENGINEER , on or about the 30th day of each month during
construction as provided below. The OWNER shall retain ten ( 10 ) percent of the
payment amounts due to the CONTRACTOR until final completion and
acceptance of all Work to be performed by the CONTRACTOR under the Contract
Documents . Each request for a partial payment shall be submitted on an
Application for Payment Form , which shall be accompanied by a executed copy of
the Certification of Contractor. The OWNER WILL provide the forms . All progress
payments will be on the basis of the progress of the work measured by the
schedule of values established in Paragraph 2 . 9 of the General Conditions (and in
the case of Unit Price Work based on the number of units completed ) , or, in the
event there is no schedule of values , as provided in the General Requirements .
5 . 1 . 1 Prior to Substantial Completion , progress payments will be made in an
amount equal to the percentage indicated below, but, in each case , less
the aggregate of payments previously made and less such amounts as
ENGINEER shall determine , or OWNER may withhold , in accordance with
Paragraph 14 . 7 of the General Conditions .
50 % of materials and equipment not incorporated in the work ( but
delivered , suitably stored and accompanied by documentation satisfactory
to OWNER as provided in Paragraph 14 . 2 of the General Conditions ) ,
5 . 2 Final payment. Upon final completion and acceptance of the work in accordance
with Paragraph 14 . 13 of the General Conditions , OWNER shall pay the remainder
of the Contract Price as recommended by ENGINEER as provided in said
Paragraph 14 . 13 .
00530-3
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 (Bid No . 5046 )\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor.doc
ARTICLE 6. INTEREST.
Not Applicable .
ARTICLE 7. CONTRACTOR'S REPRESENTATIONS .
In order to induce OWNER to enter into this Agreement , CONTRACTOR makes the following
representations :
7 . 1 CONTRACTOR has familiarized itself with the nature and extent of the Contract
Documents , work , site , locality, and all local conditions and laws and regulations
that in any manner may affect cost, progress , performance or furnishing of the
work .
7 . 2 CONTRACTOR has studied carefully all reports of explorations and tests of
subsurface conditions and drawings of physical conditions which are identified in
the Supplementary Conditions as provided in Paragraph 4 . 2 of the General
Conditions , and accepts the determination set forth in Paragraph SC-4 . 2 of the
Supplementary Conditions of the extent of the technical data contained in such
reports and drawings upon which CONTRACTOR is entitled to rely .
7 . 3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying ) all such examinations , investigations ,
explorations , tests , reports and studies (in addition to or to supplement those
referred to in Paragraph 7 . 2 above ) which pertain to the subsurface or physical
conditions at or contiguous to the site or otherwise may affect the cost , progress ,
performance or furnishing of the work as CONTRACTOR considers necessary for
the performance of furnishing of the work at the Contract Price , within the Contract
Time and in accordance with the other terms and conditions of the Contract
Documents , including specifically the provisions of Paragraph 4 . 2 of the General
Conditions ; and no additional examinations , investigations , explorations , tests ,
reports , studies or similar information or data are or will be required by
CONTRACTOR for such purposes .
7 . 4 CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing underground facilities
at or contiguous to the site and assumes responsibility for the accurate location of
said underground facilities . No additional examinations , investigations ,
explorations , tests , reports , studies or similar information or data in respect of said
underground facilities are or will be required by CONTRACTOR in order to perform
and furnish the work at the Contract Price , within the Contract Time and in
accordance with the other terms and conditions of the Contract Documents ,
including specifically the provisions of Paragraph 4 . 3 of the General Conditions .
00530-4
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 (Bid No. 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor.doc
7 . 5 CONTRACTOR has correlated the results of all such observations , examinations ,
investigations , explorations , tests , reports and studies with the terms and
conditions of the Contract Documents .
7 . 6 CONTRACTOR has given ENGINEER written notice of all conflicts , errors or
discrepancies that he has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR .
ARTICLE 8 . CONTRACT DOCUMENTS .
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the work consist of the following :
8 . 1 This Agreement ( Section 00530 ) .
8 . 2 Performance and other bonds (Sections 00610 and 00620 ) .
8 . 3 Notice of Award and Notice to Proceed .
8 . 4 General Conditions (Section 00700) .
8 . 5 Supplementary Conditions (Section 00800) .
8 . 6 Specifications bearing the title IRCUITS Water and Wastewater ITtilit Standards,
January,_ 1997 or latest v rsion
8 . 7 Drawings , inclusive with each sheet bearing the following general title title
" FLORIDA RID BDIVI ASSFSSMFNT PRO I C'T"
8 . 8 Addenda numbers 1 to 1 _, inclusive .
8 . 9 Indian River County Water and Wastewater Utility Standards .
8 . 10 The following , which may be delivered or issued after the effective date of the
Agreement and are not attached hereto : All written amendments and other
documents amending , modifying , or supplementing the Contract Documents
pursuant to Paragraphs 3 . 4 and 3 . 5 of the General Conditions .
There are no Contract Documents other than those listed above in this Article 8 . The Contract
Documents may only be amended , modified or supplemented as provided in Paragraphs 3 . 4 and
3 . 5 of the General Conditions .
00530-5
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 ( Bid No. 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion) Agreement between Owner and Contractor.doc
ARTICLE 9 . MISCELLANEOUS
9 . 1 Terms used in this Agreement which are defined in Article 1 of the General
Conditions will have the meanings indicated in the General Conditions .
9 . 2 No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of
the party sought to be bound ; and specifically but without limitation moneys that
may become due and moneys that are due may not be assigned without such
consent (except to the extent that the effect of this restriction may be limited by
law) , and unless specifically stated to the contrary in any written consent to an
assignment , no assignment will release or discharge the assignor from any duty or
responsibility under the Contract Documents .
9 . 3 OWNER and CONTRACTOR each binds itself, its partners , successors , assigns
and legal representatives to the other party hereto , its partners , successors ,
assigns and legal representatives in respect of all covenants , agreements and
obligations contained in the Contract Documents .
9 .4 THE CONTRACTOR SHALL BE PROPERLY LICENSED TO PRACTICE
ITS TRADE OR TRADES WHICH ARE INVOLVED IN THE COMPLETION
OF THIS AGREEMENT AND THE WORK THEREUNDER .
9 . 5 This agreement shall be governed by the laws of the State of Florida .
Venue for any lawsuit brought by either party against the other party or
otherwise arising out of this agreement shall be in Indian River County,
Florida , or, in the event of federal jurisdiction , in the United States District
Court for the Southern District of Florida .
IN WITNESS WHEREOF , OWNER AND CONTRACTOR have signed this Agreement in
triplicate . One counterpart each has been delivered to OWNER , CONTRACTOR , and
ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER
and CONTRACTOR or by ENGINEER on their behalf.
This Agreement will be effective on May 13 , , 2003 .
OWNER CONTRACTOR
Indian River Counbv Trpqqi Ire Coast Contracting - Inc_
Board of County commission .rs
00530-6
F :\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 ( Bid No. 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor.doc
4PBY BY
Kennet, Macht , Chairman Lawrence J . yers , P dent
B C ApMay 13 , 2003 (C PORA SEP.L )
Attest: Attest :
J . K . Barto , of the Circuit Court
Deputy Cl r
Approved By: Appr ed as to Form and L Sufficiency:
Ja es E . Chandler, County Administrator my Attorney
Address for giving notices Address for giving notices
1840 25th Street 6290 Old Dixie Hwy-- P . 0 - Box 6 0 4
Vero Beach Florida 32960 VeroBeach ,, FL 32965
License No, - 0 7303
( If CON is a corporation , attach
ence ot aU orl
END OF SECTION
00530-7
F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\FLORIDA RIDGE - UCP#2164 (Bid No . 5046)\BID
DOCUMENTS\00530 EJCDC - REVISED (per Marion ) Agreement between Owner and Contractor. doc
Division of Corporations Pagel of 2
Florida Deparbuenf of State, Division of Corporations
� I F y • ti li., 1 % • S
�I �7rri �. sirrtHrz .nr �* Pubs hC I nquiry
Florida Profit
TREASURE COAST CONTRACTING, INC .
PRINCIPAL ADDRESS
6290 OLD DIXIE HWY
VERO BEACH FL 32967 US
Changed 03/ 10/ 1997
MAILING ADDRESS
POB 650249
VERO BEACH FL 32965
Document Number FEI Number Date Filed
P92000004324 650369820 11 /06/ 1992
State Status Effective Date
FL ACTIVE NONE
Registered Agent
Name & Address
MCHUGH, JOHN J JR
333 17TH ST
STE U
VERO BEACH FL 32960
Officer/Director Detail
Name & Address Title
MYERS, LAWRENCE J
4925 4TH ST.
D
VERO BEACH FL 32968
Annual Reports
Report Year Filed Date Intangible Tax
2001 01 /09n001
http : //ccfcorp . dos . state . fl .us/scripts/cordet. exe?al =DETFIL&n 1 =P92000004324&n2=NA . . . 6/23 /2003
Division of Corporations Page 2 of 2
2002 II 01 /21/2002 11
Previous Filing Return to List Next Filing
No Events
No Name History Information
Document Images
Listed below are the images available for this filing .
ANN REP/UNIFORM BUS REP
ANN REP/L NIFORM BUS REP
ANN REP/UNIFORM BUS REP
104/ 11 /27000ANN REP/LNIFORM BUS REP
03/ 16/ 1999 .- ANNUAL REPORT
05/05/ 1998 -- ANNUAL REPORT
03 / 10/ 1997 -- ANNUAL REPORT
02/23/ 1996 -- 1996 ANNUAL REPORT
THIS IS NOT OFFICIAL RECORD ; SEE DOCUMENTS IF QUESTION OR CONFLICT
Wf
. uX✓r.. Gs...y44'u�kp. , v 6n F. : > ��u. ,F � ' ��� ,. .
http : //ccfcorp . dos . state . flus/scripts/cordet, exe?a1 =DETFIL&n 1 =P92000004324&n2=NA . . . 6/23 /2003