HomeMy WebLinkAbout2008-343o to g
AMENDMENT NO.9 TO THE PROFESSIONAL
ENGINEERING SERVICES AGREEMENT
66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS
BETWEEN SR 60 AND 4TH STREET
IRC PROJECT NO. 9810
THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17, 1998, including
AMENDMENTS NUMBER 1 through 8, between CARTER ASSOCIATES, INC. (ENGINEER) and
INDIAN RIVER COUNTY (COUNTY). The proposed scope of work includes adding an 8 -foot wide
concrete sidewalk, a traffic signal at the 16th Street/College Lane intersection with 66th Avenue, plan
revisions for a tie-in at College Lane, utility coordination and modification to address Right of Way
acquisition conditions. All provisions of the original Professional Engineering Services Agreement including
Amendment Nos. 1 through 8 shall remain in full force and effect, unless otherwise specifically modified.
This amendment addresses changes in "TIME OF COMPLETION" of the AGREEMENT.
SCOPE OF SERVICES
See attached letter from Carter Associates, Inc. dated October 10, 2008, which specifies changes in the
"SCOPE OF SERVICES" and "COMPENSATION" and "TIME FOR COMPLETION."
COMPENSATION
This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in
response to the Scope modifications set out herein. The charges associated with this AMENDMENT NO. 9
are as follows:
Fees for Engineering Services: Lump Sum Amount $40,480.00
Not to Exceed Amount $600.00
TOTAL Amendment No. 9 $41,080.00
The charges associated with the AGREEMENT (which include changes from Amendments I through 8 and
these additional services included in proposed Amendment 9), shall be increased from $441,605.00 to
$4821685.00.
FAEngineering\Capital Projects\9810-66th Ave, 4th St to SR 60\9810 Amendment 9 10-14-08.doc
I
a
The AGREEMENT is hereby amended as specifically set forth herein. All sections of the
AGREEMENT shall remain in full force and effect, and are incorporated herein. This Amendment No. 9 to
the AGREEMENT, regardless of where executed, shall be governed by and construed by the laws of the
State of Florida.
TIME OF COMPLETION
Carter Associates, Inc. shall have 90 calendar days from their receipt of a written Notice to Proceed to
submit revised plans for review and 30 calendar days additional to submit final plans.
In WITNESS whereof the parties have executed the Amendment this 21st Day of
Oct. , 2000.
CADTER SSOCIATES, C.
(Name and Title of Signatory)
Williams G. Collins, II County Attorney
r ' Approved as to Form and Legal Sufficiency
F..
�h
INDIAN RIVER CO TY, FLORIDA
if AA P ]CAP
00% 96aa P P dMAL'o-
anra L. Bowden, Chaiinian ;
Board of County CoJimissiopers
v^
Approved by BCC Octob6> 1211,',X08
Attest:
Jeffrey K. Barton, Clerk of Circuit Court
By:
J ph A. Baird, County Administrator
R\Engineering\Capital Projects\9810-66th Ave, 4th St to SR 60\9810 Amendment 9 10-14-08.doc
2
CARTER ASSOCIATES, INC.
CONSULTING ENGINEERS AND LAND SURVEYORS
1708 21st STREET • VERO BEACH, FLORIDA 32960-3472 • 772.562.4191 • 772-562-7180 (FAX)
JOHN H. BLUM, P.E., PRINCIPAL
DAVID E. LUETHJE, P.S.M., PRINCIPAL
GEORGE A. SIMONS P.E., PRINCIPAL
PATRICK S. WALTHER, P.E., PRINCIPAL
MARVIN E. CARTER P.S.M., Consultant to the Firm
DEAN F. LUETHJE P.E., FL&Nc) Consultant to the Firm
October 10, 2008
Mr. Christopher J. Kafer, Jr., P.E., County Engineer
Indian River County Engineering Division
180127"' Street
Vero Beach, FL 32960
Re:
1=1
We are pleased to present this proposed amendment for..,
construction plans for the above referenced project. We shed
along the west side of 66`x' Ave from 16`h street to south of S]
bridge over the Lateral "A" Canal for College Lane, add a ma;
Lane intersection with 66 b Ave, re -new utility coordination,
agreement, and address post -100% comments from our meeting
All provisions of the original Professional Engineering Services
including Amendment Nos. 1 through 8, shall remain in full force
modified herein. A man-hour fee estimate is attached as Exhibit ".
describes our proposed scope of services and terms of agreement bet
and Indian River County (County):
Plan Revisions for Sidewalk:
In general, the project plans will be modified to re-insert the previously i
sidewalk along the west side of 66"' Ave from 16"' Street to south of SR -60, as
• Revise 66b Avenue Phase 1 Summary of Quantities, Typical Section,
Sections, and Signing & Pavement Marking sheets.
FRANK S. CUCCURESE, P.S.M.
KENNETH M. GOOD, P.E.
ROGER A. HAGLER, P.S.M.
G. SEAN MCGUIRE, P.E.
STEVE D. SNOBERGER, P.E.
OCT 10 2008
re to revising the
concrete sidewalk
t tie-in at the new
16" Street/College
ROW acquisition
17, 1998),
specifically
ring further
Plan Revisions for Tie-in at College Lane.•
In general, the project plans will be modified to re -draft the previously designed paving,curbing, guardrail,
and pavement markings on the east leg of the 16th Street/66 b Ave intersection to match" the College Lane
design plans provided by Boyle Engineers, as follows:
• Revise 66"' Avenue Phase 1 Summary of Quantities, Plan and Profile sheets, Cross Sections, and
Signing & Pavement Marking sheets.
Traffic Signal Design:
A standard mast -arm signalization plan will be prepared for the 16`h Street/College Lane at 66`x' Ave
intersection. This plan shall be designed in accordance with the FDOT standard design criteria and Indian
River County requirements, as follows:
A IF Senring Florida
SA Since 1911
4
• The intersection design shall accommodate the four lanes currently being constructed on the east
approach for College Lane, the three lanes proposed on the west approach for 16"' street, and the
ultimate five lanes on the north and south approaches for 66th Avenue.
• Revise 66th Avenue Phase 1 Summary of Quantities, Plan and Profile sheets, Cross Sections, and
Signing & Pavement Marking sheets.
• Submit plans for review/comment/approval by the IRC Traffic engineering department and
revise/update plans as required.
• Provide mast arm foundation design by a structural engineering sub -consultant.
• Provide construction administration services for the traffic signal installation concurrent with the
roadway construction of the Phase 1 portion of the project. These services will be provided on a
time & materials basis utilizing the budget amount stipulated in Amendment No. 3.
Utility Coordination:
The Engineer shall prepare "marked -up" plans showing known existing utilities along 66th Ave and shall
attend a utility coordination meeting arranged by the County. These services are needed in order to renew
coordination with the utility owners as previous base contract utility coordination efforts were conducted
several years ago.
ROW Acquisition Agreements:
In general, the project plans will be modified to accommodate several specific requirements of ROW
acquisition agreements, as follows:
• Revise 66th Avenue Phase 2 Summary of Quantities, Plan and Profile and Cross Section sheets, and
create fencing details to add a 4 -board horse fence along the Graves property frontage on 66th Ave.
• Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert
replacement at the Knight property on 4th Street.
• Revise 66th Avenue Phase 2 Summary of Quantities, Summary of Drainage Structures, and Plan and
Profile sheets, to add a drainage swale and inlets at the Hefflebower property on 8th Street.
• Revise 66th Avenue Phase 2 Summary of Quantities and Plan and Profile sheets, to add a culvert
replacement at the Schacht property on 8th Street.
Plan Revisions for Post400% Comments:
In general, the project plans will be modified to address post -100% comments, as follows:
• Update the General Notes with current utility company contacts and current FDOT references.
• Import new topographic survey data of existing facilities on 4`h, 8th, and 12th Streets.
• Revise Summary of Quantities to add a bid item for removal of existing wells.
• Revise Phase 1 Plan and Profile sheets to show a recently installed 25 -pair AT&T buried cable.
• Revise water main design on Plan and Profile sheets to accommodate the proposed sidewalk
installation north of the Phase 1 project limits to SR -60.
• Revise IRFWCD permit application submittal to include the proposed construction along Lateral
Canal "A" north of the phase 1 project limits to SR -60.
• Re-evaluate the proposed stormwater drainage system design on the north side of 4th Street, east of
66th Avenue.
• Re-evaluate the proposed stormwater drainage system design on the north side of 8th Street, east of
66th Avenue.
• Revise 66th Avenue Phase 2 Summary of Quantities, Summary of Drainage Structures, and Plan and
Profile sheets, to substitute a ditch bottom inlet in lieu of drainage structure ME4 at the north-east
corner of the 4th Lane intersection.
• Re-evaluate the proposed side -street profiles at 656' Ave., 4th Place, 4th Lane, 5t'' Street, and 5th Place,
N:\PSW\98-23E\Agreements\Amendment 9 proposal(revised).doc
Serving Florida
Since 1911
Assumptions:
In developing this proposal, the following assumptions have been made and deviation from these
assumptions may require additional expenditures on behalf of the County to the Engineer.
• The County will provide any additional survey data that may be needed.
• The County will provide geotechnical engineering services to conduct borings at each mast arm
foundation location. The Engineer will coordinate the locations and extent of the sub -surface
explorations with the geotechnical engineering firm.
• No traffic study or timing analysis will be required. The IRC Traffic Engineering Department shall
provide the traffic signal phasing and timing desired for the proposed traffic signal.
Compensation*
Amendment No. 9 fees will be invoiced on a percent complete lump sum basis. The total amount to be billed
shall not exceed $41,080.00 unless authorized by an additional written agreement, as follows:
Plan Revisions for Sidewalk $2110.00
Plan Revisions for Tie-in at College Lane.."",,,,"., " &
MastArm Signal:......................................................................064$1,120.00
TRCWFoundadon Design ..................l4,000.00
CAI Signal Design .......
....................................................................... $14 890.00
Utility Coordination...$1, 670.00
...................................................................
Plan Revisions for ROW Acquisition Agreements'"'1111
.....................................................................11 111S.5,480a00
Post -100% Comments00.
Reimbursable Expenses................................................................................................................ $11,210.00
....................................TOTAL PROFS .............. 600.00
.............................
SSIONAL SERVICES = $41,080.00
Time for Completion:
The Engineer shall complete the plan revisions and preliminary signalization design within 90 days of receipt
of a written Notice to Proceed. The Engineer shall complete the final signalization design within 30 days
after receipt of review comments from the County Traffic Engineer.
Duration of Agreement:
The duration of the Agreement shall be extended to remain in full force and effect for a period of three years
after the date of execution of this Amendment.
Please call on me should you have any further questions or concerns regarding our proposed scope of work
or terms of agreement.
Sincerely,
Patrick S. Walther, P.E.
Project Principal
Attachments We Exhibit "A" (man-hour fee estimate)
Serwv Florida
N:\PSW\P\98-23E\Agreements\Amendment 9 proposal(revised).doc % �IN
`I, Since 191111
Indian River County
66th Avenue Roadway Improvements
IRC Project No, 9810
Addendum No. 9
Fee Estimate (rate schedule as per CAI continuing services agreement with IRC)
10/10/2008
Exhibit "A"
$140.00
$125.00
Steve
$110.00
Domenic
Trisha/Frank
$75.00
Re-insert sidewalk factual time billed)
540.00
Enc. t.Prin.
Fn c>_ I_
P
F111.
If
n P
r•e nr
2
20
GRAND TOTAL= $41,080.00
Sen7hgFlorida
Since 1911
Patrick
Steve
Sean
Domenic
Trisha/Frank
Re-insert sidewalk factual time billed)
1
2
2
20
1 2,110.00
snb-total —1
2,110.00
Re -draft tie-in at College Lane
2
12
15120.00
Add mast -arm traffic si nal
sub -total=
1,120.00
TRCW foundation design
Traffic signal plans, key sheet, notes, Quantities and details
S
4.000.00
Signing & Markin plan revisions
32
52
8,140.00
Plan/Profile revisions
8
12
1,780.00
Adjust quantities
4
8
1.040.00
Coordination/Meethtgs/Incidentals
6
1 450.008
4
16
4
3.080.00
sub -total =
18.890.00
Utility Coordination Meeting
4
6
G
1.670.00
sub -total =
1,670.00
ROW Acquisition A reements
Add Graves horse fence (66th Ave STA24+00)
Add Knight culvertr lacement (4th Street STA23+23)1
3
I Z
1.230.00
Add Hefflebower Swale and inlets 8th Street STA17+30 and STA 20+55
I
3
335.00
Add Schacht culvert replacement 8th Street STA21+80)
2
4
660.00
Coordmation/Meetings/Incidentals
I
3
335.D0
6
12
8
4
2,920.00
sub fatal =
51480.00
Plan &evisions Post-1001yo Submittal
Update phone numbers and MOT references
Import new survey150.00
data
150.00
Add pay item for "remove well"
] 2
Add AT&T 25 PR cable as shown on Arcadis plans
2
150.00
Modify watemtain and fire hydrants for sidewalk in Arcadis Portion of the
2
150.00
project
Draft IRFWCD Permit application to include Arcadis portion of the
6
450.00
pToject
Re-evaluate drainage on 4th Street east of 66th Ave
6
2
220.00
Re-evaluate drainage on 8th Street east of 66th Ave
6
12
12
3,060.00
Substitute inlet for ME -4 66th Ave STA15+73)
12
12
3.060.00
Revise side street profiles
2
1
3
335.00
7
IS
2.400.00
sub -total =
11.210.001
Reimbursable Expenses
600.00
sub -total =
600.00
GRAND TOTAL= $41,080.00