HomeMy WebLinkAbout2006-341 to O3 0 (v AGREEMENT FOR THE ESCROW OF COSTS '7 T FOR CHANGE ORDER #4 TO CR 512, PHASE III , CR 510 ROAD PROJECT (LEFT TURN LANE AND RIGHT TURN LANE FOR THE SHOPPES OF SEBASTIAN II DEVELOPMENT) q00 THIS AGREEMENT, made and entered into this 3rd day of October d 2006 by and between BLUE RIBBON SEBASTIAN , LLC, a Georgia limited liability company, hereinafter referred to as "Developer" , and INDIAN RIVER COUNTY, a political subdivision of the State of Florida , hereinafter referred to as "County" . WITNESSETH : 1 . Developer has commenced construction of a commercial project within the City of Sebastian referred to as the Shoppes of Sebastian II . 2 . As a condition of its County right-of-way permit, Developer is required to construct both a left turn lane and a right turn lane for its project. 3 . Currently County is under contract with J .W . Cheatham , LLC to widen CR 512 from Roseland Road to the Sebastian River Middle School ( Project #9611 and 0001 - CR 512 , Phase III , CR 510 ). 4 . Developer has agreed to provide cash funds to pay for all costs for a change order (#4), copy attached , to the CR 512, Phase III , CR 510 road project currently under construction by County in order to accommodate for both a left turn lane and a right turn lane for Developer's project, thus eliminating unnecessary road and pavement marking re-work resulting in a uniform and economical product. 5. It is agreed between the parties that in consideration of the escrowed sum of $215,507.25, by Developer to Indian River County, County acknowledges that Developer has met a condition of the right-of-way permit as outlined in paragraph 2 above . IN WITNESS WHEREOF , the parties hereunto set their hands and seals this 3rd day of October , 2006 . BLUE ON SEBASTIAN , L , a Borgia limit mil tl ' y compo y J . t cox, III , Managing Me er J j " DEVELOPER" , DIAN RIVER COUNT FLO , A By , . '. rthur R . Nqube , hairma ATTEST: J . K. Barton , Clerk Board of Ccp rsty'Gommission` a "COUNTY" Deputy Clerk BCC approved: _" 06tolher 3 , 2006 APPROVED AS TO PORN AND LAQALiYPHIDt BYE WILLIAM G. COLLINS N COUNTYATTOORM F:\Attorney\Nancy\DOCS\PLAN\shoppes of seb escrow agreement.doc NDII. NT RIVER COUN .FY, FLORIDA MEMORANDUM TO : Joseph A. Baird, County Administrator T�IROUGH : And W. Davis, P ., Public Works Director Christopher J. Kaf r, Jr., P .E. , County Engin FROM: Michael D . Nixon, PE . , Design Professional Engineer SUBJECT : CR 512, Phase III, CR 510 - Project #9611 & 0001 Bid Number 2006065 Change Order 4 Date: August 23 , 2006 CONSENT AGENDA DESCRIPTION AND CONDITIONS The Bid for County Road 512, Phase III and County Road 510 Road Improvements was recently awarded to T. W. Cheatham, LLC. The current contract amount is $ 13 ,406 ,823 .38 . The project will consist of the widening of CR 512 from Roseland Road to the Sebastian River Middle School. Also , tum lanes will be constructed along the west side of CR 510 between CR 512 and the Sebastian River High School The Developer ofthe SHOPPES OF SEBASTLAN E a commercial site development, has agreed to provide funds to be included in the CR 512, Phase III, CR510 Road project currently under. construction. The work will include a modification to the CR 510 widening to accommodate a left turn lane and a right tum lane for the SHOPPES OF SEBASTI_AN H. Development. Combining the two projects will result in a uniform and economical product. The Developer of the SHOPPES OF SEBASTIAN II will Day all costs for the additional work. F:Mngineering\0aph;a1 Projects'961 i -CR 512 Widening DCC Agenda-Change Order H4 09-15-06doc.doc PAGE TWO BCC Agenda Item from Michael D . Nixon, P.E. CR512, Phase Ill. CR510 — Project 9611 & 0001_ — Change Orde- Ne . 4 AuGusT 23 . 2006 REC0 YRNDFTIONS Staff recommends approval of Change Order 41 increasing the contract amount by $215, 507 .25 . The new contract amount will now be $ 13 ,622,330. 63 . ATTACHMENT Change Order #4 DISTRIBUTION 1 . James W. Davis, P .E., Public Works Director 2 . Christopher J. Kafer, Jr., P .E.; County Engineer 3 . Jerry Davis, Manager; Purchasing Division 4 . Gordon Sparks, P .E., Utilities Engineering 5 . J. W. Cheatham. LLC 6. Donald Keith, Senior Engineering Inspector - xPPROVED AGENDA ITEM FOR: September 5, 2006 BY: Indian River Approved Date County Admn]Mtratior, / Bud et Legal +'V z0z 1 Risk Management � I r . Puhlic Works Engineering FAEnginemng\Capnt1 Projeors1961 3 -CR 512 WideaingWC Agenda-Change Order 44 OS-15-06doc.doc Sep 14 06 t78 : 46a J W Cheatham 5614718348 P . 2 'SECTION 00942 . Change Order Form No . 4 DATE OF ISSUANCE : 08! 15106 EFFECTIVE DAT = : 08;22 !06 OWNER: Indian River County CONTRACTOR J . W _ CHEATHAM , LLC Contract : 9611 Project: CPS12 , PHASE III and CR 51D Roadway I'moroveme ^ts 96 ^ , A 8� 0^01 OWNER 'S Contract No. ENGINEER 's Contract No. r /A ENGINEER INDIAN RIVER COUNTY ENGINEERING DIVISION You are directed to make the following changes in the Contract Documents, Description : Modify the widening of CR 510 to accommodate a right turn lane for the SHOPP ES OF SEBASTIAN PHASE 11 site development. The work will include additional road k ase , stabilization , asphalt and drainage structures . Reason for Change Order: The Developer of the SHOPPES OF SEBASTIAN PHASE 11 , a commercial site development, has agreed to provide funds for this change order. J . W. Cheather r, LLC will complete the turn lane and widening of CR 510 at one time eliminating unneces: any road and pavement marking re-work resulting in a uniform and economical product. Attachments : Description of Itemized Bid Schedule Change . Drawings titled SHOPPES OF SEBASTIAN PHASE It , PROPOSED 7 URN LANE , by M . E. Construction , Inc „ Project #30427 , dated 6114106 , and 11 sheets I CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIP. ES �Dcscription Amount Description Time Origlnal Contract Price S14 , g08 , 2g7, 3e, Original Contract Time: (days or dates- ) Substantial Complt tion : 420 t1ar ID t. � � Final Com ie tion : 450 auostanttal uon iE lion: 'u ' Final ComNIE tion: C Contract Price prior to this Change r $ 1 3 ,406, 1323 . 38 Contract Time prior to this Order: Chane Order, Change ( days or dates ) Substantial ComplE tion: 42.0 Final Com k tion : 450 Net increase of this Change Order: 5215 , 56725 Net increase this Change Ord :r: (days or dates) �! Substantial ComplE lion : 21 Final ComplE :ion : 21 Contract Price with all approved Change $ 1367.2 . 330 . 63 Contract Time with all approve d Orders : Change Orders: (day_- or dates) Substantial ComplE :ion : 441 ' Final Comnle :ion : 471 I ( ACCEPTED: ; RECOMMENDED : AP 0 ED ' jl By: S rt-1 y •• fL - �- ' g XZ , ,>' y' CONTRACTOR (Signature ) ENGI SE (Sigr tune) NER ( '_ na E ) Date : q / 1 h / " I Date: ! D 6 Date : / G 9611A & 0001-00942 - Change On or Form #4,doo 00942 • 1 F lEnameerinp' Cepl10' PNIec1f1991 )•OR 51: Wmanirgi tti.H5t:,PMA;[lll CmuuctDacsNM1to LGDS : .Droa; - Cnerp. Draer Form = We CR512, Phase III and CR510 Roadway Improvements CHANGE ORDER No. 4 Description of Itemized Bid Schedule Item No. Description of Chane Quanti Unk Unit Price Price Increase Pdcee `.Blossom :Ditch -Pi in - 101 -1 4 Mobilization 1 LS 8 ,500.00 8,500 .00 102-1 4 Maintenance of Traffic 1 LS 10.690.00 10.690.00 108-1 4 Layout & Asbuilts 1 LS 5,336.00 5,3 36.00 110-1 -1 4 Clearing1 LS 550000 120-1 4 Excavation & Shoulder Removal 1 LS 1023000 1120-6 (4) Embankment 1 ,900 CY 5.00 160-4-12 4 T B Stabiliution 12" 2,325 SY 5.50 285-7-06 4 8" Base Rock 2,240 SY 13.00 334-1 (4 SP 9.5 Su er ave - 1 " 2, 157 SY 4.55 l'i 334-2 4 SP 12.5 Su er ave - 1 1f2" 2 157 SY 6 .20 13 373.40 552-1 4 4" Concrete Sidewalk 3. 108 SF 4.00 12 432.00 HC 4 H7C Rams 4 EA 500.00 2.000.130 575-1 -1 4 Sod Bahia 2,200 SY 1 .75 3,850.00 425-1 -521 4 Type C Inlet 3 EA 2,016.00 6, 048.00 425-1-551 4 jyp2 E Inlet 1 EA 3,025.00 3,025.00 JI 4 5 x 12 J Inlet 1 EA 15,430.00 15 430.00 EW 85 4 Modified 84" Endwall i EA 30 500.00 30,500.00 430-17-320 4 12" RCP 124 LF 56.00 6,944.00 430-17-329 41 24" RCP 187 LF 65 .00 12, 155.00 430-17-330 4 30" RCP fib LF 79.00 5,372.00 430-34-084 4 84" RCP 5 LF 580.00 2,900.00 SUBTOTAL 215,507.25 0.00 NET CHANGE 215,507.25 <: J. W. ROAD BUILDI_NG & Cheatham, EART 3Iv OVING C'UN7R4CT ORS I ,LC August I ! , 2006 Indian River County 1840 25a' Street Vero Beach, Fl. 32960 Att: Mr, Michael D. Nixon, P .E. Ref: SHOPPES OF SEBASTLAN PHASE Il CR 510 Improvements Dear 1'vir. Nixon; AS per your request we submit the following for the. above referenced project. Mobilization (Supervision & Bond) LumpSum Maintenance of Traffic $ 8 ,500 . 00 Layout & Asbuilis rump Sum S 10, 690 . 00 Clearing Lump Sum $ 5 ,336. 00 Excavation & shoulder Removal Lump Sum $ 5 ,500 . 00 Embankment Lump Sum. . $ 10,230 . 00 1900 CY @ $ 5 . 00/CY S 9,500. 00 Type B Stabiiization 12 " 2825 SY 8 ""Base rock @ $ 5 .50/SY $ 12,787.50 Superpave 9, 82240 SY @ $ 13 . 00/SY $ 29 120 . 00 SP 12 . 5 SP 9 . 5 uperave 2157 SY @ $ 4.55/SY $ 14 .35 4 " Concrete Sidewalk 217 SY @ $ 6.20/SY $ 13 ,373 .40 3108 SF @ $ 4 .00/SF $ : 2,432 . 00 H/C Ramps 4 EA cz Sod Bahia @ 1S 50 . ODBA $ 2,000. 00 Type C Inlet 2200 SY @ $ 1 . 75/SY $ 3 ;850. 00 Type E Inlet 3 EA @ $ Z016 . 00/EA $ 6, 048 . 00 5 x 12 J Inlet 1 EA @ $ 3 ,025 . 00/EA $ 3 ,025 .00 1 EA @ $ 15 43'D . 00/EA $ 15 ,430 . 00 Modified 84 " u ndwall 1 EA @ $30,500 . 00/EA $30,500 . 00 Cheatliam, 12 " RCP 124 LF @ $ 56 . 00/LF $ 0944 . 00 24 " RCP 1n 7 LF @ $ 65 . 001LF $ 12, 155 . 00 68 LF @ $ 79. 00/LF $ 5 ,372 . 00 S" 'Cly 5 LF @ $ 580 . 00ILF $ 2,900. 00 Stop Sign (No Street Blades) 3 EA @ 5 270 . 00./EA $ 810. 00 Total $216,31. 7 .25 Additional Contract Time 21 Days Additional pavement markings to be paid per. contract unit prices at the time of installation. Please call me should you have any questions. Sincerely 7. W. Cheatham, LLC S - F", pi ? Moe Moussavi Vice President of Estimatmg Blue Ribbon $t� Pn;°LIC Comar�tgne Bank 3500 Piedmont Road 2080 Mt. Baran Road 64-9233 SUIt@:1p5 - Suko Q00 610 � '. Atlanta, GA 30305 Atlanta, Gq 3J)327-295 404-364-.9054 404-591 -4302 p DATE l ^� PAY Reference: 2iS.5oz 2s`_ . .; TO THE DOLLARS ORDER OF l : 0'6i09233210i10034 1e' 79 �