HomeMy WebLinkAbout2005-110 AMENDMENT NUMBER 1 TO WORK ORDER 2 29tTihis Amendment Number 1 to Work Order 2 ( "Amendment" ) is entered into as of this day of March , 200 5 ( " Effective Date" ) pursuant to that certin Continuing Contract Agreement for Professional Services entered into as of 8pril 6 2004 ( "Agreement" ) , by and between Indian River County , a political subdivision f the State of Florida ( "COUNTY" ) and Kimley- Horn and Associates Inc . ( "CONSULTANT " i . 1 . The COUNTY has selected the Consultant to perform th professional services set forth in Work Order Number 1 dated April 13 , 2004 . 2 , The COUNTY and the Consultant desire to amend Work Order Number 1 as set forth in Attachments 1 and 2 attached to this Amendment and made a part hereof by this reference , all in accordance with the terms and provisions set forth in the Agreement . 3 . From and after the Effective Date of this Amendment , Work Order Number 1 is amended as set forth in this Amendment . Pursuant to paragraph 1 . 4 oft a Agreement , nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individL al Work Order as if fully set forth herein . IN WITNESS WHEREOF , the parties hereto have executed this Amendment as of the Effective Date first written above . CONSULTANT BOARD OF COUNTY COMMISSIONERS Kimley- Horn and Assoc tes Inc . OF INDIAN RIVER COUNTY B .+ - J Y BY Title : �4— V Thomas S . Lowther, Chairman � 1 Attest : J . K . Barton , Clerk of Court k By Deputy Clerk Approved : Lau J si6ph A, Baird , County Administrator 4anro d s to form and legal sufficiency : an E . 4zk,��A4sigft6t e6ullry A orney HA044572006\Scope , fees , and job start\Amendment Form . doc Attachment 1 To Amendment 1 To Work Order Number 2 Proiect Description and Understanding This Amendment Number 1 modifies the scope of work in Work Order #2 for the survey, design , and construction tasks of the new Northwest Regional wastewater pump station . The original scope included the design of a conventional pump station which included a wetwell , submersible pumps , and odor control system. Through discussions with staff, there is a desire to construct an in-line pump station with building in lieu of a conventional pump station in order to eliminate odors and reduce maintenance typically associated with conventional pump stations . Therefore , the following amendment includes scope modifications to provide additional survey for an alternate site , design for a building to house the pumps , piping, electrical , generator, and electrical room, and provide construction phase services for the building and structure . SCOPE OF SERVICES The following tasks are included : Task 1 — Survey KHA will provide survey for an alternate site located adjacent to the playground on the Northwest corner of the school on the County common area . The site survey will include a boundary survey , topo , and other above ground information in that area . Additional survey for an alternate route fort e forcemains to the west of the site will also be included . Task 2 - Design The design of a CBS structure to house the pumps , piping, generator, electrical , and controls will be included . The approximate size will be 500 sq ft footprint with architectural treatments, ar d include an access road (shellrock equivalent) to the facility from 64tb Ave . All other design requirements as stipulated in the original work order #2 will be included . Task 3 —Construction Phase Services Consultant will provide additional construction phase services for the construction of the b jilding, including bidding and contract administration, shop drawing review, coordination and mee Ling attendance, construction observation , start-up services , preparation of record drawings , inc uding electronic format in AutoCadd R14 version in real world coordinates on CD, mylars, and f nal certification of completion of the project. It is anticipated that the duration of construction phase (notice to proceed to final completion) will be five to six (5 -6) months and that on-site construction observations will be as appropriate with the level of construction activity. Consultant will answer contractor questions and prepare addendums, as needed which will be distributed to all the contract document holders . Consultant will attend a pre-bid meeting at the project site or main office . Consultant will sell project manuals from our office , including drawings, specifications , and generation of all addendums . H :\044572006\Scope, fees, and job start\64th & CR 510 Master Pump Station Proposal-Amendment Ldoc IY Shop drawing submittals will be reviewed for conformance with the contract documents , hop drawings will be submitted directly to Engineer. Consultant will review the submittals and return copies to the contractor and Indian River County Utilities . Consultant will provide coordination of project status meetings and observation of construction for the duration of the project . Consultant will also review pay requests and provide recommenda ions for payment to Indian River County Utilities for the progress of the work. Construction observation will be provided by a field inspector . Total observation time will be approximately 100 hours . The field inspector will observe construction in order to determine if the project is being constructed in accordance with the contract documents . Work that Consultant believes does not comply with the contract documents will be brought to the attention of Indian RiN er County Utilities and the contractor. Start-up of the new pumps will be facilitated by the pump manufacture ' s representative and by the Contractor. Consultant will observe start-up of the new pumps once the installation is completed . All other construction phase observations as stipulated in the original work order #2 will be included. FEES : Consultant will provide these Services as described herein on a lump sum basis for the foll wing fees : Task Fee $ 1 . Survey $ 400 2 . Design $ 5 ,400 3 . Construction Phase Services $ 3 ,400 Total $ 13 ,400 H :\044572006\Scope, fees , and job start\64th & CR 510 Master Pump Station Proposal-Amendment Ldoc