AMENDMENT NUMBER 1 TO WORK ORDER NUMBER 1
This Amendment Number 1 to work Order Number 1 ("Amendment") is entered into as
of this day of 2005 ("Effective Date") pursuant to that certain Continuing
Contract Agreement for Professional Services dated entered into as of
N,10 \/ elm- bo- v^ 16, 2. 084- ("Agreement"), by and between Indian River County, a political
subdivision of the State of Florida ("COUNTY") AND Ecotech Consultants, Inc .
("CONSULTANT") .
1 . The COUNTY has selected the Consultant to perform the professional services set
forth in Work Order Number 1 dated N o \1 e y" b E r 1 �, 2 0 Q 4,
2 . The COUNTY and the Consultant desire to amend Work Order Number 1 as set forth
in Exhibit 1 attached to this Amendment and made a part hereof by this reference, all in
accordance with the terms and provisions set forth in the Agreement.
3 . From and after the Effective Date of this Amendment, Work Order Number 1 is
amended as set forth in this Amendment. Pursuant to paragraph 1 . 4 of the Agreement, nothing
contained in any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth
herein.
IN WITNESS WHEREOF , the parties hereto have executed this Amendment as of the
Effective Date first written above .
BOARD OF COUNTY COMMISSIONERS
ECOTECH CON U TANTS , INC . Of INDIAN RIVER COUNTY
By L . By
C . E . Sikindell , Jr. Thomas S lv mother, Chhin i an
BCC App`rbvbd August ?. `;2005
Title : President
4
Attest : J . K. B 'atrr; 1ezkiCouft �
BjZ
Deputy Clerk
Approved :
Aso
J s ph A. acrd, County Administrator
; ve to form and legal sufficiency :
rilan L : 'Fell , ist f oun Attorney
(amendment # 1 /moo# 1)
l
EXHIBIT 1
ATTACHMENT 1
60 ACRE WETLAND BRINE DISPOSAL FOR
NORTH COUNTY WATER TREATMENT FACILITY
SCOPE OF SERVICES
Change Order No . 1 modifies the scope of work in Work Order No. 1 as issued to Ecotech Consultants,
Inc . for assisting the County with the design and permitting of a 60-acre wetland site for disposal of 3 . 0
MGD of brine water discharged form the North County Water Treatment Facility. The project site is
contiguous with the Indian River and is located just north of the North Relief Canal . The project site
will be developed into an emergent salt march community for the purpose of dispersing the brine water
across the project site . The brine water will be mixed with water from the Indian River prior to
discharge to the project site . This work is being proposed in response to Florida Department of
Environmental Protection permitting conditions that require the County to cease direct discharge to the
Indian River. The proposed wetland site will provide the County with a long term disposal option for
the brine water that also supplements the existing brine reuse project currently under construction.
Change Order No . 1 is being implemented at this time to provide professional engineering services by
Masteller & Moler, Inc . associated with the project described above. The additional work to be
performed as part of this change order will generally included preparation of plans for proposed site
grading, the general layout of the boardwalk with sufficient detail for permitting purposes, the design for
permitting purposes of the pumping scheme for providing dilution water from the Indian River to be
blended on-site with the brine flow from the North County Water Treatment Facility, and the design of
the on-site pipeline/distribution system.
A brief description of the scope of services for Change Order No . I is provided below :
TASK A — CONSTRUCTION PLANS
Masteller & Moler, Inc. will analyze and use the boundary and topo survey plans (prepared by others
and furnished to us) and prepare and design construction plans for a system of four (4) ponds, wetland
marshes, ditches, boardwalk, fishing pier, dilution pump(s), dilution piping with flowmeter,
brine/dilution water distribution piping system with static mixer, and construction details. Our design of
the brine disposal system at the Spoonbill Marsh is based on the "Plan View" prepared by Indian River
County drawn by Art dated 6/ 17/05 , Sheet 1 of 2 and "Volume of Material to be Removed Plan View"
drawn by Art dated 6/30/05, Sheet 2 of 2 .
The proposed boardwalk will be 6 ' wide and constructed of pressure treated lumber and wood piles with
handrails. Our plans will show the boardwalk routing and fishing pier with basic design information
sufficient for a contractor to use for final design by his structural engineer and construction . Our
services do not include structural design of the boardwalk and/or fishing pier.
Page I of 2
ATTACHMENT 1
TASK B - PERMITTING
The Masteller & Moler, Inc . services include Florida Department of Environmental (FDEP) permitting
(application submittal w/attachments) for the dilution pump and on-site pipeline system and the pipeline
brine/dilution water distribution system on the disposal site . Also, we will provide plans and data to
assist EcoTech with submittal of the FDEP permitting application for the fishing pier and wetlands brine
disposal project . We will also prepare a Minor Site Plan Application and supporting plans and
information for submittal to the Indian River County Planning Department . Included is meeting
attendance and Request for Additional Information (RAI) responses to Indian River County Planning
Staff.
TASK C — CONSTRUCTION SERVICES
Masteller & Moler, Inc . will provide periodic inspection of the wetland brine disposal project
construction on an as-needed basis to observe that the elements are being constructed in reasonable
compliance with the Construction Plans and permits . We will also attend meetings, review shop
drawings and monthly pay estimates from the contractor.
Page 2 of 2
ATTACHMENT 2
60 ACRE WETLAND BRINE DISPOSAL FOR
NORTH COUNTY WATER TREATMENT FACILITY
PROJECT BUDGET
The Ecotech Consultants, Inc. Team proposes to complete the Scope of Services described in Change
Order No . 1 , Attachment 1 for the lump sum amount of $ 118 , 560 . 00 . This increases the overall cost of
Work Order No . 1 from $88, 020 . 00 to $206, 580 . 00 . An approximate breakdown of this lump sum
amount, by task, is presented below .
Budget
Task Original Work Change Order Revised Work
Order No . 1 No . 1 Order No . 1
Task A — Construction Plans 0 779000 77, 000
Task B — Permitting 847220 32, 940 1171160
Task C — Construction Services 3 , 800 81620 12,420
Total $ 883020 $ 1187560 $2067580
ATTACHMENT 3
60 ACRE WETLAND BRINE DISPOSAL FOR
NORTH COUNTY WATER TREATMENT FACILITY
PROJECT IMPLEMENTATION SCHEDULE
The Utility Department is under pressure by the Florida Department of Environmental Protection to
prepare the permit application and plans covered by the existing Work Order No . 1 and this Change
Order No . 1 and make a submittal by September 6, 2005 . In order to meet this date, Masteller & Moler,
Inc. is proceeding with design and preparation of Construction Plans in anticipation that Change Order
No . 1 will be approved as soon as possible. Therefore, the implementation schedule is as follows :
MILESTONE COMPLETION DATE
Notice To Proceed August 2, 2005
Submittal to FDEP September 6, 2005
EHM/cab
file #0544LA
(Change Order Exhibits.doc)