HomeMy WebLinkAbout2006-363 / ,) a � AMENDMENT NO. 3 TO / q. 43`d AVENUE ROADWAY AND DRAINAGE IMPROVEMENTS o� CO PROFESSIONAL ENGINEERING SERVICES AGREEMENT This AMENDMENT, entered into this lath day of nrtnhor 2006, by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida, hereinafter referred to as the COUNTY, and CARTER ASSOCIATES , INC . , Vero Beach, Florida, hereinafter referred to as the ENGINEER. This AMENDMENT modifies the terms and conditions of the existing Professional Engineering Services Agreement dated October 7 , 2003 , Amendment No. 1 to that AGREEMENT, dated March 29, 2005 , and Amendment No.2 to that AGREEMENT, dated May 2 , 2006, between the ENGINEER the COUNTY. This AMENDMENT stipulates changes in "Section I — Project Limits and Description", "Section II — County Obligations", " Section III - Scope of Services" , "Section IV — Time for Completion", " Section V - Compensation" , "Section VIII — Extra Work", and "Section XVI — Duration of Agreement." SECTION I - PROJECT LIMITS AND DESCRIPTION Consultant services are required to revise the plans previously produced by the ENGINEER to provide center medians and dual travel lanes in each direction from 8th Street to 181h Street with right turn and left turn lanes at 8th, 12th, and 16th Streets, to redesign the roadway drainage system with mainline pies on both sides of the roadway, redesign the signalization plans to provide mast arm signals at 8t , 12th, and 161h Street/43rd Avenue intersections, and provide irrigation and landscaping in the medians . Services include incorporating these scope changes into the project plans, and modifying the necessary permits. SECTION II — COUNTY OBLIGATIONS The COUNTY will acquire (in a timely manner) the necessary Right-of-Way for the added turn lanes and U-turn bump-out areas. SECTION III - SCOPE OF SERVICES The ENGINEER agrees to perform professional roadway design and related services in connection with the project as required and set forth in the following: A. General 1 . The ENGINEER will endeavor not to duplicate any previous work done on the project. After issuance of written authorization to proceed, the ENGINEER shall consult with the COUNTY to clarify and define the COUNTY ' S requirements for the project and review all available data. 2 . The ENGINEER will revise the previously prepared design drawings and permit applications to meet the COUNTY ' S new design criteria. Amendment No. 3 to 43`d Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement 3 . The ENGINEER will prepare parcel sketches and legal descriptions as an optional service, as requested by the COUNTY, under a unit price allowance. B . Preliminary (60% Design) Plans The ENGINEER will prepare and submit preliminary (60% design) plans to the COUNTY for review and comment. The COUNTY will provide review comments in writing to the ENGINEER. The ENGINEER will meet with the COUNTY to discuss the COUNTY' S review comments (if required) and the ENGINEER will provide written responses to the COUNTY ' S comments. The ENGINEER will incorporate the COUNTY ' S review comments into the design drawings, where applicable. Preliminary plans shall be prepared to include : 1 . Typical Sections : The ENGINEER will revise the previous typical pavement section for 43`d Avenue to provide double 11 -foot wide travel lanes in each direction, a center median, one-foot wide paved shoulders, two-foot wide buffer strips, and four-foot wide sidewalks on both sides, as per the Board approved "Option IA" for constrained right-of-way. 2 . Plan and Profile Views : The ENGINEER will revise the previously prepared plan and profile sheets from 8`h to 18`h Streets to provide left tum lanes and U-turn bump-outs at 9`h Place/ 10t1, Street and 13 `h Place/14t ' Street, and left and right tum lanes and U-turn bump-outs at the 8`h, 12`1,, and 16°i Street intersections. Plan views will show the geometric roadway layout, including side streets, driveways, and sidewalks. The profiles will include the existing and proposed centerline elevations of the pavement, east and west limits of the existing pavement, the existing and proposed utility lines, and the existing and proposed drainage pipes and structures . 3 . Signing and Marking Plans : The ENGINEER will revise the previously prepared signing and marking sheets from 8t" to 18`h Streets, as appropriate to accommodate the revised roadway design, and to add StreetPrint (simulated pavers stamped in asphalt) in the left turn lanes at intersections and median openings, and stamped concrete on the median nosings . 4 . Signalization Plans : The ENGINEER (through a sub-consultant) will revise the previously prepared signalization plans at the 81h, 12`h, and 16`h Street/43`d Avenue intersections to provide mast-arm signals in lieu of the current span- wire designs. 5 . Stormwater Management System : The ENGINEER will revise the previously prepared stormwater management system design to provide main- line piping on both sides of the roadway from 12`h to 16`h Streets, to convey the runoff to two new stormwater ponds (one on each side of 43`d Ave) with traditional control structures and outfall pipes to the 1RFWCD canals. The ENGINEER will preserve the existing stormwater management system Page 2 of 8 Amendment No. 3 to 43`d Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement design from 8`h to 121h Streets utilizing the Unity Church pond, and from 16`h to 18`h Streets utilizing the Carolina Trace Townhomes pond, as per the existing developer' s agreements with those two property owners . The ENGINEER will revise the stormwater management calculations and report to properly describe the revised scope of the stormwater management system. 6. Landscaping: The ENGINEER (through a sub-consultant) will revise the previously prepared landscape plans to add landscaping with canopy trees and shrubs in mulched beds (no sod) and a new irrigation system in the median. The ENGINEER will preserve the previously designed road-side landscaping from 8th to 18`h Streets. C. Final ( 100% Design) Plans The ENGINEER will prepare and submit final (100% design) plans to the COUNTY for review and comment. The COUNTY will provide review comments in writing to the ENGINEER. The ENGINEER will meet with the COUNTY to discuss the COUNTY' S review comments (if required) and the ENGINEER will provide written responses to the COUNTY' S comments. The ENGINEER will incorporate the COUNTY' S review comments into the design drawings, where applicable. The final plans will be prepared to include: 1 . Cross-Sections : The ENGINEER will revise the previously prepared cross- sections every 100 feet of the project length. Cut and fill calculations will be based on the new typical section. 2. Maintenance of Traffic / Construction Phasing: The ENGINEER will provide general notes to describe the general requirements for the contractor' s maintenance of traffic operations. The contractor will be required to submit construction phasing / maintenance of traffic plans to the COUNTY for approval . 3 . Sedimentation & Erosion Control Plans : The ENGINEER will provide sedimentation and erosion control plans and a Stormwater Pollution Prevention Plan, as required for NPDES permitting by the contractor. 4. Computation Notes : The ENGINEER will provide computation notes for quantities of major elements of the construction (e. g. asphalt, base, sod, turn - outs) from station to station to assist the COUNTY in verifying the contractor' s applications for payment during the construction of the project. 5 . Miscellaneous Sheets : In addition to the drawings already mentioned above, the ENGINEER will provide the following miscellaneous drawings : a. Cover Sheet b . Horizontal Survey Control and Overall Profile C . Drainage Basin Map Page 3 of 8 Amendment No. 3 to 43`d Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement d. Drainage Basin Data C. Summary of Quantities f. Summary of Drainage Structures g. Intersection Profiles It. Miscellaneous Details i . Cut and Fill Estimates D . Permitting The ENGINEER will prepare and submit applications for permit modifications with the Indian River Farms Water Control District and the St. Johns River Water Management District for construction of the proposed project. The ENGINEER will prepare the applications for signature by the COUNTY and will provide the necessary exhibits, including permit sketches, construction drawings and calculations as required for the permit modification applications. The COUNTY will provide the application fees as required for the permit modification application submittals . E. Cost Estimates The ENGINEER will provide an opinion of probable construction costs with the 60% plan submittal, and will update that estimate with the 100% plan submittal . F. Contract Documents The ENGINEER will prepare and submit contract documents (plans and technical specifications) to the COUNTY for inclusion with the County' s bid documents. The COUNTY will assemble the "front ends", advertise, receive bids, and award the contract for construction. G. Construction Phase Assistance The ENGINEER will provide construction phase assistance services as follows : 1 . Pre-Bid : Attend a pre-bid meeting and respond to potential bidders questions during the bidding period with clarifications. 2 . Bid Evaluation : Assist the COUNTY in evaluating the bids receive and provide a recommendation for award based on the engineering considerations. 3 . Meetings : Attend a pre-construction meeting and periodic job progress meetings to answer questions and share/request information as a member of the project "team" (40 meetings total based on 18 months of active construction). 4. Site Visits : Conduct periodic visits to the site as necessary to observe the progress of the work to determine in general if the executed work is proceeding in accordance with the Contract Documents and permit conditions, for the purpose of providing final certifications upon completion Page 4 of 8 Amendment No. 3 to 43rd Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement of the project. Site visits are in addition to the job progress meetings and will be made at an average frequency of twice per week (80 site visits total based on l8`h months of active construction) . 5 . Submittals : Review samples, catalog data, schedules, shop drawings, laboratory, shop and mill tests of materials and equipment and other data the contractor submits in accordance with the Contract Documents. 6 . Payment Applications : Review the Contractor' s applications for payment and make a recommendation to the COUNTY for payment. 7 . Interpretations : Furnish consultation regarding interpretations of the project plans, technical specifications, and permit conditions. 8 . Changes : Review proposal requests, supplemental drawings and information, and change order requests. 9. Utility Coordination : Coordinate with utilities regarding conflict resolution, relocation, and/or abandonment of existing facilities. 10. Punch List: Conduct final inspection of the project for compliance with the Contract Documents, prepare final "punch list" of deficiencies, and conduct a verification inspection to ensure that deficiencies are corrected. H. Final Certifications 1 . As-Built Survey : The ENGINEER will conduct an "as-built" survey of the constructed improvements, including inverts of storm sewer piping at structures. The survey shall be the minimum required for final certifications . 2 . Record Drawings : The ENGINEER will prepare "record" drawings based on the "as-built" survey, "marked-up" drawings and other information provided by the Contractor and the COUNTY. 3 . Final Certifications : The Engineer will provide final certifications to the Indian River Farms Water Control District and the St. Johns River Water Management District. SECTION IV - TIME FOR COMPLETION The time for completion of the preliminary (60% design) plans shall be twenty (20) weeks. After COUNTY review, the time for completion of the final ( 100% design) plans, shall be twenty (20) weeks. After COUNTY review, the time for completion of the permit applications shall be six (6) weeks. After receipt of permits, the time for completion of the contract documents (plans and specifications) shall be six (6) weeks . Page 5 of 8 Amendment No . 3 to 43rd Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement SECTION V - COMPENSATION The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this AMENDMENT, fees in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows : The following is a summary of costs: Preliminary (60 % design) Plans Engineering (CAI). . . . . . . .. ... . .. . . . . . . . . . . . . . . . . . . . .. . . . .........mm. .. . ... . . . . ..... .. $64, 840. 00 Landscape Plans (Brad Smith Associates) .............. ... . . . . . . ... . . $18, 635. 00 Signalization Plans (McMahon Associates) . .......... . .. .. . . . . ... . . $30,400. 00 Electrical Plans (Kamm Consulting), $2, 000. 00 . . . ....... ............. . .. . . . . . ... . . Final (100% design) Plans Engineering (CAI) .......... . . . . . .... . . . . . . . . . . . . . ...... ... . . .... ....... . ... . . . . .... . $65, 930. 00 Landscape Plans (Brad Smith Associates) . . . . . .. . .. ..... . ... . . . . .... . $18, 730. 00 Signalization Plans (McMahon Associates) . . . . . . . .. .... . .. . . . . . . .. . $26,200. 00 Electrical Plans (Kamm Consulting). . . . . . . . . . . . . . . . . . . . . . . ... . .... . . . . .. . $2, 000. 00 Permitting (CAI) ..... ... . . . . . . . . . . . . . . . . . . . ..... . . . ........... . . . . . . . . . . . . . . . . . . . . . . . .. . .... . . . . . .. $21, 780. 00 Construction Phase Assistance Carter Associates . . . . . . . . . . . . . . . . . . .... . . . . . ........ . . . . . . . . . . . . . . . . . . . . . . .. . .... . . . . .. $86,348. 00 Brad Smith Associates . . . . . . . . . .... . . . . . . . . ... ... . . . . . . . . . . . . . . . . . . . . . .. . .... . . . . .. $12, 120. 00 McMahon Associates . . . . . . . . . . . ... . . . . . . . . . ... ... . . . . . . . . . . . . . . . . . . . . . . .. . ... . . . . . . $5, 000. 00 Kamm Consulting.. ... .. . . . . . . . . . . . . . .. . . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . . . . . .. . .. . . . . . . $500. 00 TOTAL PROFESSIONAL SERVICES . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . ... . . . . $354,483. 00 The total professional services fee for Amendment No. 3 is $354,483 .00, lump sum. This fee, less the remaining balance of the current professional services fee of $ 140,554.05 , results in a total additional professional services fee of $213,928.95 . B . Unit Price Allowances The following optional services shall be provided by the ENGINEER on an "as requested" basis, and shall be paid for by the COUNTY at the ENGINEER ' S current hourly rates : ALLOWANCE FOR PREPARING PARCEL SKETCHES AND LEGAL DESCRIPTIONS (hourly not-to-exceed). . . . . . . . . . . . . . . . .... . . . . . . . . . . .. . . . m . .. . . . . $25, 000. 00 Page 6 of 8 Amendment No. 3 to 43`d Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement SECTION VIII — EXTRA WORK Extra work and optional services shall be completed in accordance with the ENGINEER' S AUGUST 2006 rate schedule, as follows: Engineer I (Principal) $ 140 .00/hr. Engineer I (Registered) $ 125 .00/hr. Engineer 11 (Registered) $ 110.00/hr. Engineer III - EIT $ 85 .00/hr. Engineer Technician (Senior) $ 85 . 00/hr. Surveyor I (Principal) $ 140. 00/hr. Surveyor I (Registered) 5135 .00/hr. Surveyor II (Registered) $ 125 .00/hr. Survey Crew (4 Men) $ 143 .00/hr. Survey Crew (3 Men) $ 130 .00/hr. Survey Crew (2 Men) $ 120 .00/hr. GPS RTK Survey Crew (3 Men) $ 150.00/hr. GPS RTK Survey Crew (2 Men/2 Units) $ 135 .00/hr. CADD Technician I $75 .00/hr. CADD Technician II $65 .00/hr. Secretary/Word Processor $40.00/hr. Inspector $57 .00/hr. SECTION XVI - DURATION OF AGREEMENT The AGREEMENT shall remain in full force and effect for a period of four years after the date of execution of this AMENDMENT or until completion of all project phases as specified by the Public Works Director, whichever occurs first, or unless otherwise terminated by mutual consent of the parties hereto or pursuant to Section XII of the AGREEMENT. Page 7 of 8 Amendment No . 3 to 43rd Avenue Roadway and Drainage Improvements Professional Engineering Services Agreement The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This AMENDMENT NO . 3 to the AGREEMENT regardless of where executed, shall be governed by and construed by the laws of the State of Florida. IN WITNESS WHEREOF the parties have executed this Amendment this 24th day of October 2006. CARTER ASSOCIATES, INC . INDIAN RIVER COUNTY, FLORIDA 17082 IT STREET BOARD OF COUNTY COMMISSIONERS VERO BEA CH, FLORIDA 32960 By: By: Patrick S . Walther, P.E Arthur R. Neubfiter, Cha Project Manager Board of County Commiss " �^ WITNESSED Approved by BCC Octot er ' 249 2006 By: Attest: � �� Jeffrey K. Barton, Clerk of IN it•Gourt<,_' c. By: Deputy Clerk William G. Collins, II, County Attorney Approved as to Form and Legal Sufficiency seph A. Baird, Purity Administrator Approved Date Administration /'la Budget {$ County Attorney iU ( a, Risk Mana ement Public Works Capital Projects V Page 8 of 8 N :\PS W\P\03 -93 E\AmendmentNo3 .doc