Amendment to the Professional Services Agreement
TO : (Owner's Representative) Amendment Number : 2
In accordance with the Agreement dated : � =
May 13, 2003
Between the Owner:
Board of County Commissioners, Indian River County, Florida
and the Architect :
Donadio & Associates, Architects of Vero Beach, Florida
For the Project :
Indian River County New Administration Complex to be generally located on approximately 13 acres north of
26th) Street. east of 20th Avenue . south of Aviation Boulevard and west of Lateral " E " Canal in Vero Beach .
Florida . This Project shall also include but not be limited to other such improvements as the Extension of 20th
Avenue to the North and Construction of a Bridge across the Main Relief Canal connecting 20th Avenue with
Aviation Boulevard .
AMENDMENT NUMBER 2 :
Authorization is Granted
(X) to proceed with Additional Services or a Change in Services
(X) to incur Reimbursable Expenses
As Follows :
The subject of this requested Amendment Number Two (2) is the design of a third facility (second facility to be
located on 43 `d Ave . ) to be located on 43rd Avenue (Jackson Tract) . This building will accommodate the
Emergency Services Department including the Emergency Operations Center which, because of the role of this
building as a critical central hub of operations during emergency conditions it will be specially designed to
operate under the most adverse conditions possible in accordance with the following criteria :
Basis of Design : The Architect and Owner acknowledge and agree that the following design criteria as required
by the State of Florida, Division of Emergency Management shall be the basis for the design of this Emergency
Operations Center facility :
A. The EOC shall meet the hurricane hazard safety criteria established in Standards for Hurricane Evacuation
Shelter Selection (ARC 4496) .
B . The EOC and essential ancillary structures and equipment shall be designed to resist the effects of a major
hurricane . The wind design load requirements shall be ill accordance with the American Society of Civil
Engineers (ASCE) Standard 7 , Minimum Design Loads for Buildings and Other Structures. The minimum wind
design criteria shall include :
Design Wind Speed = 200 miles per hour (3 second gust)
Wind Importance Factor, 1 = 1 . 00
Exposure Category == C
Directionality Factor, Kd = 1 . 00
Internal Pressure Coefficient = +/- 0 . 18
Pagel of 3
All components and cladding assemblies necessary to maintain a structurally enclosed condition and prevent
rainwhter intrusion shall be designed to meet the wind design criteria . Roof cover waterproofing barriers shall
meet the wind design criteria . Loose aggregate roof ballast shall not be used on the roof cover. Rooftop
equipment shall be designed and installed to meet the wind design criteria .
C . The EOC and essential ancillary structures and equipment shall resist penetration by windborne debris impact
At a minimum, all exterior enclosure claddings and assemblies (i . e . , walls , roofs , louvers , outside
doors ,
windows, etc . ) located within 60 feet in height above finish grade shall meet the hurricane windborne debris
impact criteria specified in the Department of Energy's (DOE) Standard, Natural Phenomena Hazards Design
and Evaluation Criteria, DOE-STD - 1020-2002 . That is , the building enclosure must resist penetration by a
nominal 2 " x4 " lumber plank weighing 15 pounds propelled at 50 miles per hour striking end-on and normal to
the assembly surface . As applicable, impact test procedures shall be consistent with recognized state and
national standards ; such as , SBCCI Test Standard for Determining Impact Resistance from Windborne Debris
SSTD 12 , American Society of Testing and Materials (ASTM) Standards ASTM E 1886 and ASTM E 1996, and
Florida Building Code Testing Protocols TAS 201 , TAS 202 and TAS 203 .
D . The minimum design elevation of the lowest floor for the EOC and essential ancillary structures
and
equipment shall be located outside of or elevated above : Category 5 storm surge elevation, the 500 year flood
plain (if determined) , or the base flood elevation plus two feet, whichever is greater.
E . The following information shall be shown on the construction drawings : 1 . wind design per ASCE 7 with
applicable year of revision, 2 . design wind speed, 3 . wind importance factor, 4 . design wind exposure, 5 . design
internal pressure coefficient, 6 . design wind pressures in terms of pounds per square foot (psf) to be used for the
design of exterior component and cladding materials not specifically designed by the principal licensed design
professional , 7 . windborne debris impact performance criteria, and 8 . finish floor elevation with comparison
reference to the Category 5 storm surge elevation, 500 year flood elevation (if determined) , and the base flood
elevation .
F . The EOC and essential ancillary structures and equipment shall be designed for a minimum of 72 hours of
continuous operation and shall not be solely reliant upon off-site utilities (e . g. , water, natural
gas fuel ,
electricity, telecommunication and information technologies, etc . ) The design shall ensure that the EOC is
equipped with survivable communications to receive and distribute warnings , and ensure connectivity with other
EOGs , the State Warning Point, adjacent jurisdictions , and key response and recovery agencies and
organizations .
G . Force protection and security measures shall be consistent with the guidance published in Florida's Homeland
Security Comprehensive Assessment Model(HLSCAM), United States Air Force Installation Force Protection
Guide, or other federal or state recognized best-practices guides as approved by the Department .
Authorization
Authorization is granted to proceed with Additional Services as described herein and in accordance with
approvals given at a regular meeting of the Indian River County Board of County Commissioners on Tuesday,
August 2 , 2005 .
The following adjustment shall be made to compensation .
Compensation:
Add : $375,700. 00 (Three Hundred Seventy-Five Thousand, Seven Hundred Dollars and No Cents)
Reimbursables shall not exceed $ 30 , 000 . 00
Time : of design services : 10 (ten) months; to run concurrently with and independently of the Primary Contract.
Page 2 of 3
By its execution, this Amendment Number 2 is hereby incorporated into the Standard Form of Agreement
Between the Owner and Architect, AIA Document B141 - 1997 , as modified, that was entered into by the parties
as of May 13 , 2003 on this 13 'h day of September, 2005
� .
OWNER, Thomas S . Lowther AR T , Anthony Donadio
Chairman. Board of County Commissioners, Indian Donadio Associates, Architects of Vero
Rivcr County, Florida Beach, P .A .
Approved by BCC ; September 13 , 2005 Witnessed by:
Attest:
Jeffrearton C, 6,ik if Circuit Court
• 1 1
ALL
Depui Clerk
• h
t
Approved as to Form land Leal Sufficiency
i Com40; Atto ey
Approved :
Jo h A . 13aird, County Administrator
Indian River County Approved Date
Administration
Legal
Budget
Department / 7
Risk Management we
Page 3 of 3
Exhibit A
AE Contract Amendment Number Two to the
Standard Form of Agreement between Owner and Architect
AIA Document 111414997 and General Conditions
of the Contract for Construction, 1997 edition of
AIA Document A201 as modified.
Between
Owner : Indian River County Board of County Commissioners
and
Architect : Donadio & Associates, Architects of Vero Beach, Florida
Executed May 13 , 2003
For the following Project :
Indian River County New Administration Complex to be generally located on approximately 13 acres north
of 26`h Street. east of 20th Avenue . south of Aviation Boulevard and west of Lateral " E" Canal in Vero
Beach. Florida . This Project shall also include but not be limited to other such improvements as the
Extension of 20th Avenue to the North and construction of a Bridge across the Main Relief Canal connecting
20th Avenue with Aviation Boulevard .
THIS CONTRACT SHALL HEREINAFTER BE KNOWN AS THE "PRIMARY CONTRACT"
OTHER AMENDMENTS
Authorization was previously granted for Amendment No . 1 on Tuesday, March 23 , 2004
AMENDMENT NO . 1 :
The subject of amendment No . 1 is the design of a third building to be located on 43rd Avenue (Jackson
Tract) which will accommodate other departments which, by virtue of their roles in County government, are
more suited to that site . The off-campus building will provide the storage, staging area, and loading dock and
administration space needed by the Supervisor of Elections who has agreed to this relocation of her main
office . Also in the 43 `d Avenue building will be Buildings and Grounds and Animal Control facilities .
Authorization was granted to proceed with the following Additional Services in accordance with approvals
given at a regular meeting of the Indian River County Board of County Commissioners on Tuesday, June 22 ,
2004 wherein:
REQUESTED AMENDMENT NO. 20
The subject of this amendment is the design of a third facility (second facility to be located on 43 `d Ave . ) to
be located on 43rd Avenue (Jackson Tract) which will accommodate the Emergency Services Department
including the Emergency Operations Center which, because of its role as a critical central hub of operations
during emergency conditions will be specially designed to operate under the most adverse conditions
possible .
Page 1 of 5
THE REQUESTED AMENDMENT ( AMENDMENT NO. 2) MODIFIES THE SCOPE OF WORK
AS FOLLOWS .
The Project :
New Indian River County Emergency Management and Emergency Operations Center Facility containing
approximately 16 ,000 square feet to be generally located on approximately 12 acres approximately one
quarter mile north of 41st Street . west of 43rd Avenue . in Vero Beach . Florida This Project shall also
include but not be limited to other such improvements as site design parking and stormwater facilities
The Owner and Architect agree as follows :
To design Emergency Services administrative offices and Emergency Operations Center to be located in one
facility to meet the needs and responsibilities of the Director of Emergency Services In doing so the EOC
and essential ancillary structures and equipment shall be designed to resist the effects of a major hurricane It
shall be designed for a minimum of 72 hours of continuous operation and shall not be solely reliant upon off-
site utilities (e . g . , water, natural gas fuel , electricity, telecommunication and information technologies etc.)
The form of design should result in a strong and durable operational type structure The design shall meet
recommended minimum operational standards as prescribed by the Florida Department of Emer ency
Management .
The Owner ' s Program is ,
Adequate area to support the identified users based on programming previously completed as part of the PRIMARY
CONTRACT for the New County Administration Complex. and in accordance with standards prescribed by the Florida
Department of Emergency Management for facilities of this type
The financial parameters are as follows :
. 1 Amount of the Owner's overall budget for the entire Project, including the
Architect's compensation, is : $ 5,926,200.00
.2 Amount of the Owner's budget for the Cost of the Work, excluding the
Architect's compensation, is : $5,284,450.00
. 3 The estimated Construction Budget for the building alone is $ 4,800,000 .00
1 . 1 .2 .6 The time parameters are :
Proposed Design Schedule is based on the following duration of activities :
1 . Programming and Program Validation 1 . 0 month
2 . County Review
3 . Schematic Design Documents 1 . 5 months * *
4 . County Review
5 , Design Development Documents 1 . 5 months
6 . County Review
7 . 100 % . Completion of Construction Documents 3 . 0 months
8 . County Review
* Review time is estimated to be 2 to 4 weeks .
* * Schematic Design Time Frame may increase due to Site Plan Approval
Page 2 of 5
1 . 1 . 2 . 7 The proposed procurement or delivery method for the Project is :
Construction Manager at Risk, licensed. insured and bonded in the State of Florida.
1 . 1 . 2 . 8 Other parameters are :
All elements or combination of elements of the design shall conform to Applicable Re ug_latory requirements
of Agencies having iurisdiction over the Project as a whole or in part
1 . 1 .3 PROJECT TEAM
The Owner's Designated Representative is :
Steve Blum - Project Manager
1840 25th Street
Vero Beach . Florida 32960
The persons or entities , in addition to the Owner ' s Designated Representative if any who are required by the
Owner to review the Architect ' s submittal ' s to the Owner are :
Lynn Williams , Superintendent of Buildings and Grounds Division
1840 25h Street
Vero Beach, Florida 32960
3 . 3 The Owner's other consultants and contractors, if anv, are : Contractor - Turner Construction
Company, Construction Manager at Risk.
ARTICLE 1 . 5 COMPENSATION
1 . 5 . 1 For the Architect's services as described under Article 1 .4 , or elsewhere herein. compensation shall be
computed as follows :
Add : Three Hundred Seventy-Five Thousand, Seven Hundred Dollars and 00 Cents ($ 375 , 700 . 00)
Reimbursables shall not exceed $ 30 , 000 . 00
Progress Pavments shall be billed monthly based on the following_
Program Validation 5 %
Schematic Design 15 %
Design Development 20%
Construction Documents 35 %
Bidding/Negotiations 5 %
Construction Administration 20%
TOTAL 100 %
ARTICLE 2 .3 EVALUATION AND PLANNING SERVICES
2 .3 . 1 The Architect shall provide a written preliminary evaluation of the information furnished by the Owner under this
Agreement, including the Owner's program and schedule requirements and budget for the Cost of the Work, each in
terms of the other. The Architect shall review such information to ascertain that it is consistent with the requirements of
the Project and shall notify the Owner of any other information or consultant services that may be reasonably needed for
the Project.
Page 3 of 5
ARTICLE 2 .4 DESIGN SERVICES
2 .4 . 1 The Architect's design services shall include normal civil, structural, mechanical and electrical engineering and
other such professional design services described herein as required to provide construction documents for a complete
and usable facility.
2 .4 . 2 SCHEMATIC DESIGN DOCUMENTS
2 .4 . 2 . 1 The Architect shall provide Schematic Design Documents based on the mutually agreed-upon program,
schedule, and budget for the Cost of the Work. The documents shall establish the conceptual design of the Project
illustrating the scale and relationship of the Project components . The Schematic Design Documents shall include a
conceptual site plan, if appropriate, and preliminary building plans, sections and elevations . At the Architect's option,
the Schematic Design Documents may include study models, perspective sketches, electronic modeling or combinations
of these media. Preliminary selections of major building systems and construction materials shall be noted on the
drawings or described in writing .
2 .4 . 3 DESIGN DEVELOPMENT DOCUMENTS
2 .4 . 3 . 1 The Architect shall-provide Design Development Documents based on the approved Schematic Design
Documents and updated budget for the Cost of the Work. The Design Development Documents shall illustrate and
describe the refinement of the design of the Project, establishing the scope, relationships, forms , size and appearance of
the Project by means of plans, sections and elevations , typical construction details, and equipment layouts . The Design
Development Documents shall include specifications that identify major materials and systems and establish in general
their quality levels .
2 .4 .4 CONSTRUCTION DOCUMENTS
2 .4 . 4 . 1 The Architect shall provide Construction Documents based on the approved Design Development Documents
and updated budget for the Cost of the Work. The Construction Documents shall set forth in detail the requirements for
construction of the Project. The Construction Documents shall include Drawings and Specifications that establish in
detail the quality levels of materials and systems required for the Project.
2 .4 .4 .2 During the development of the Construction Documents, and as requested by the Owner. the Architect shall
assist the Owner in the development and preparation of the Conditions of the Contract for Construction (General,
Supplementary and other Conditions) . The Architect also shall compile the Project Manual that includes the Conditions
of the Contract for Construction and Specifications and may include bidding requirements and sample forms .
ARTICLE 2 . 5 CONSTRUCTION PROCUREMENT SERVICES
None -- Project to be by means of Construction Manager at Risk
ARTICLE 2 .8 SCHEDULE OF SERVICES
2 .8. 1 Design and Contract Administration Services beyond the following limits shall be provided by the Architect as a
Change in Services in accordance with Paragraph 1 . 3 . 3 :
. 1 up to two (2) reviews of each Shop Drawing, Product Data item, sample and
similar submittal of the Contractor.
.2 up to Thirty-Two QQ visits to the site by the Architect over the duration of the Project during construction.
. 3 up to two (2) inspections for any portion of the Work to determine whether such portion of the Work is substantially
complete in accordance with the requirements of the Contract Documents .
.4 up to two (
2) inspections for any portion of the Work to determine final completion.
2 . 8 . 2 The following Design and Contract Administration Services shall be provided by the Architect as a Change in
Services in accordance with Paragraph 1 . 3 . 3 :
Services Responsibility
Page 4 of 5
. 1 Programming Architect
. 2 Land Survey Services Owner
. 3 Geotechnical Services Not Provided How about borings we already have?
.4 Space Schematics/Flow Diagrams Architect
. 5 Existing Facilities Surveys Not Provided
. 6 Economic Feasibility Studies Not Provided
. 7 Site Analysis and Selection Owner
. 8 Environmental Studies and Reports Owner
. 9 Owner-Supplied Data Coordination Architect
. 10 Schedule Development and Monitoring Architect
. 11 Civil Design Architect
. 12 Landscape Design Architect
. 13 Interior Design Not Provided
. 14 Special Bidding or Negotiation Not Provided
. 15 Value Analysis Architect
. 16 Detailed Cost Estimating Not Provided
. 17 On-Site Project Representation Owner
. 18 Construction Management Owner
. 19 Start-up Assistance Architect
. 20 Record Drawings Architect
. 21 Post-Contract Evaluation Architect
. 22 Tenant-Related Services Not Provided
. 23 Signage Architect
. 24 Fire Protection Not Provided
.25 Security System Owner
. 26 Indian River County Site Plan Architect
Approval Preparation
. 27 Demolition Documents Not Provided
. 28 Rezonine Owner
. 29 Information Technology System Backbone Architect
Additional information regarding the above enumerated items :
NONE
All terms and conditions shall remain the same as in the "PRIMARY CONTRACT" except as noted
herein.
Page 5 of 5