HomeMy WebLinkAbout2007-047 2o0T 041
AMENDMENT NUMBER 3 TO WORK ORDER NUMBER 1
This Amendment Number 3 to work Order Number 1 ("Amendment') is entered into as
of this 6thday of February 2007 X1966 ("Effective Date") pursuant to that certain Continuing
Contract Agreement for Professional Services dated entered into as of
Consulting Services ("Agreement'), by and between Indian River County, a political
subdivision of the State of Florida ("COUNTY") AND Ecotech Consultants, Inc .
("CONSULTANT") .
1 . The COUNTY has selected the Consultant to perform the professional services set
forth in Work Order Number 1 dated November 16. 2004 .
2 . The COUNTY and the Consultant desire to amend Work Order Number 1 as set forth
in Exhibit 1 attached to this Amendment and made a part hereof by this reference, all in
accordance with the terms and provisions set forth in the Agreement.
3 . From and after the Effective Date of this Amendment, Work Order Number 1 is
amended as set forth in this Amendment. Pursuant to paragraph 1 .4 of the Agreement, nothing
contained in any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth
herein.
IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the
Effective Date first written above .
BOARD OF COUNTY COMMISSIONERS
ECOTECH CONSULTANTS , INC. OF INDIAN RIVER COUNTY
By By
C. E . Swindell, Jr. G C. Wheeler, ,Chainnhn
Title : President
Attest: J. K. Barton, Clerk of Court
By
Deputy Clerk
proved:
J s p ai d, County Administrator
A e t rm and leg iency:
Marian E. Fell, Assistant ounty Attorney
EXHIBIT 1
ATTACHMENT
INDIAN RIVER UTILITIES DEPARTMENT
NORTH COUNTY BRINE DISPOSAL
SCOPE OF SERVICES
Amendment No . 3 modifies the scope of work in Work Order No. 1 as issued to Ecotech
Consultants, Inc. for assisting the County with permitting, design, and construction management
services . Negotiations with FDEP has made it necessary to revise the original design and contract
plans of the brine disposal system. Seven (7) acres are being added to the western boundary of the
site and this causes a major change in our previous design and significant revisions to our contract
plans .
Amendment No . 3 is being implemented at this time to provide professional environmental and
engineering services by Ecotech Consultants, Inc. and Masteller & Moler, Inc. associated with the
project described above. The additional work to be performed as part of this Amendment will
generally included the preliminary redesign of the site plan (to include the additional seven acres on
the west side of the site) for permitting purposes, preparation of construction plans and
specifications, and meetings with the County and permitting agencies .
A brief description of the scope of services for Amendment No. 3 is provided below :
Task 1 . Preliminary Site Plan Redesign to Include New t7.0 Acre Site
Ecotech Consultants, Inc . (ETC) will assist the County with redesigning the site plan to include an
additional t7 .2 acres located along the western boundary of the project site.
The deliverables for this task will include two copies of the revised site plan.
Task 2 . Preparation of Construction Plans & Specifications
ETC and Masteller & Moler, Inc . will prepare plans and specifications for the permitted site design.
The deliverables for this task will include two copies of the draft plans and specifications for review
by the County. ETC will modify the draft plans and specifications as appropriate in response to
comments received from the County, after the County completes their review of the draft application.
Two copies of the final plans and specifications will be provided to the County.
Page 1 of 4
Task 3. Permitting/Meetings
ETC will assist the County with modifying the permits to include the additional seven acres of land
located on the west side of the project site. ETC also will meet with FDEP and the County on an as
needed basis to discuss the Spoonbill project.
There are no planned deliverables for this task.
Page 2 of 4
EXHIBIT 1
ATTACHMENT 2
INDIAN RIVER UTILITIES DEPARTMENT
NORTH COUNTY BRINE DISPOSAL
PROJECT BUDGET
The Ecotech Consultants, Inc . Team proposes to complete the Scope of Services described in
Amendment No. 3 , Attachment 1 for the lump sum amount of $99,475 .00 . This increases the overall
cost of Work Order No . 1 from $242 ,2200. 00 to $341 ,695 . 00. An approximate breakdown of this
lump sum amount, by task, is presented below.
Construction Permitting Construction Total
Plans Services
Original WO No . 1 $0 $84,220 $3 , 800 $ 885020
Amendment 1 $77,000 $325940 $8 ,620 $ 118 ,560
Amendment 2 $0 $35 ,640 $0 $355640
Amendment 3 $675560 $319915 $0 $99,475
Ecotech Consultants, Inc. proposes to complete the Scope of Services described in Attachment 1 for
the amount of $995475 . 00 . A breakdown of the costs for each task is shown below.
Task Budget
Preliminary Site Plan Redesign $ 19,935 .00
Preparation of Construction Plans & Specifications $47,625 .00
Permitting/Meetings $315915 . 00
ADDITIONAL SERVICES
The cost to complete work not included in the Scope of Services as described in Attachment 1 will
be billed at the hourly rates shown below. Direct charges for additional services will be billed to the
County at their actual value.
Principal Engineer $ 155 . 00/hour
Principal Scientist $ 105 . 00/hour
Senior Engineer $95 . 00/hour
Senior Scientist $85 . 00/hour
CAD Designer $ 80.00/hour
GIS $75 .00/hour
Page 3 of 4
EXHIBIT 1
ATTACHMENT 3
INDIAN RIVER UTILITIES DEPARTMENT
NORTH COUNTY BRINE DISPOSAL
PROJECT SCHEDULE
An estimated schedule for completion for the scope of services contained in Amendment 3 is shown
below. The time needed to complete each of the tasks described in Attachment 1 by Ecotech
Consultants, Inc. and the County can be reasonably estimated as shown below with the limitation
that neither the County nor Ecotech Consultants, Inc . can control the phase of the permitting process
controlled by the Florida Department of Environmental Protection, the St. Johns River Water
Management District, or the U. S . Army Corps of Engineers.
Milestone Estimated Completion Date
Preliminary Site Plan Redesign 31 January 2007
Preparation of Construction Plans & Specifications 28 February 2007
Permitting/Meetings 28 February 2007