Loading...
HomeMy WebLinkAbout2007-027 % 1 INDIAN RIVER COUNTY, FLORIDA MEMORANDUM TO : Joseph A. Baird, County Administrator THROUGH: James W. Davis, P.E. , Public Works Direc FROM : Christopher J. Kafer, Jr. , P.E. , County Engine SUBJECT: Amendment No. 5 to the Professional Services Agreement with Carter Associates, Inc. for Roadway Improvements, 66th Avenue from 4th Street to SR 60 — IRC Project No. 9810 DATE: January 16, 2007 DESCRIPTION AND CONDITIONS Indian River County entered into a Professional Services Agreement with Carter Associates, Inc. on November 17, 1998 and approved Amendment No. 1 through Amendment No . 4 for additional service. Additional services are now required in order to accommodate the connection of College Lane at the alignment of 16th Street. The proposed bridge for College Lane over the I .R.F. W. C .D. Lateral A Canal will be required to be much higher than the existing bridge, which requires 66th Avenue to be much higher for proper tie-in. A summary of the proposed work for this Amendment is as follows : • Revise 16`h Street and 66th Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement Marking Plan sheets. • Revise drainage structures, drainage piping, and stormwater management report. • Revise Tabulation of Quantities and Summary of Drainage Structures. • Update engineer' s cost estimate . Breakdown summary of design costs for the project are as follows : Original Contract Price $ 66,000.00 Amendment No. 1 $ 95 ,000. 00 Amendment No. 2 $ 175820. 00 Amendment No . 3 $ 118 ,800 . 00 Amendment No. 4 $ 30,640.00 Proposed Amendment No . 5 $ 21 ,460. 00 NEW CONTRACT PRICE $ 349,720.00 FAEngineering\Capital Projects\9810-66th Ave, 4th St to SR 6019810 BCC Agn-Amend 5-01 - 16-07-cjk.doe PAGE TWO BCC Agenda Item from Christopher J. Kafer, Jr. , P.E. , County Engineer January 16, 2007 ALTERNATIVES AND ANALYSIS Alternative No. 1 - The Board of County Commissioners approve Amendment No. 5 to the Professional Services Agreement for 66'h Avenue Paving and Drainage Improvements with Carter Associates, Inc. for a lump sum fee of $21 ,460 . 00. Alternative No. 2 — The Board of County Commissioners does not approve Amendment No. 5 to the Professional Services Agreement for 66th Avenue Paving and Drainage Improvements with Carter Associates, Inc . RECOMMENDATIONS AND FUNDING Staff recommends approval of Alternative No. 1 , funding budgeted and available from Account No. 10215241 -066510-00009. ATTACHMENTS 1 . Amendment No. 5 to the Professional Engineering Services Agreement for 66th Avenue Paving and Drainage Improvements between 4th Street and SR 60 — IRC Project #9810 2 . Proposal from Carter Associates, Inc. dated January 4, 2007; Addendum No. 5 , Professional Services Agreement DISTRIBUTION 1 ) Jason Brown, Manager, Office of Management & Budget 2) Carter Associates, Inc . APPROVED AGENDA ITEM FOR Jan 2uarL 3 2007 Indian River County A rov Date BY Administration 0, t Budget f 17 Legal Risk Management Public Works 07 Engineering F9Engineering\Capital Projects19810-66th Ave, 4th St to SR 60\9810 BCC Agn-Amend 5-01- 16-07cjk.doc AMENDMENT NO. 5 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT 66TH AVENUE PAVING AND DRAINAGE IMPROVEMENTS BETWEEN SR 60 AND 4TH STREET IRC PROJECT NO. 9810 THIS is an amendment to the existing AGREEMENT dated NOVEMBER 17, 1998 , including AMENDMENTS NUMBER 1 through 4, between CARTER ASSOCIATES, INC . (ENGINEER) and INDIAN RIVER COUNTY (COUNTY). The proposed scope of work generally includes final design of roadway and drainage improvements and permitting services. The re-design will allow for proper tie-in of College Lane to 66"' Avenue and other minor changes. All provisions of the original Professional Engineering Services Agreement including Amendment Nos. 1 , 2, 3 , and 4 shall remain in full force and effect, unless otherwise specifically modified. This amendment addresses changes in "FINAL DESIGN AND PERMITTING", SERVICES, "COMPENSATION," and "TIME OF COMPLETION" of the AGREEMENT. SCOPE OF SERVICES See attached letter from Carter Associates, Inc. dated January 4, 2007, which specifies changes in the "SCOPE OF SERVICES " and "COMPENSATION." COMPENSATION This section of the AGREEMENT entitled SECTION V - COMPENSATION shall be revised in response to the Scope modifications set out herein. The charges associated with this AMENDMENT NO. 5 are as follows: Fees for Design Modifications : $21 ,460.00 (Lump Sum) The charges associated with the AGREEMENT (which includes changes from Amendment 1 , 2, 3 and 4 and these additional services included in proposed Amendment 5 ), shall be increased from $328,260. 00 to $349, 720 .00 . The AGREEMENT is hereby amended as specifically set forth herein. All sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. This Amendment No. 5 to the AGREEMENT, regardless of where executed, shall be governed by and construed by the laws of the State of Florida. 0 TSMN98-23E misedceWmendment 5.dce t TIME OF COMPLETION Carter Associates, hic. shall have 60 calendar days from their receipt of a written Notice to Proceed to submit plans that are 90% complete. After receiving Indian River County comments regarding these plans, they have 30 calendar days to submit plans that are 100% complete. In WITNESS whereof the parties have executed the Amendment this 23rd ' ' ` ' " yfaf January , 2007. ,. • C E APE .. S, C. INDIAN RIVER COUI�IY, FLORIDA can F . ue , , ' e President Gary C. eeler, Chairman Board ounty Commissioners Witnesse b Approved by BCC 01 - 23 - 2007 Attest: Jeffrey K. Barton, Clerk of Circuit Court By:_ C �l Williams G. Collins, II County Attorney Deputy Clerk Approved as to Form and Legal Sufficiency eph A. gird, County Administrator 0i\PSW\P\98-23E\miscdm\Amendment 5.dm 2 CARTER ASSOCIATES , INC CONSULTING ENGINEERS AND LAND SURVEYORS 1708 21st STREET VERO BEACH. FLORIDA 32960-3472 MARVIN E. CARTER, PS.NI_ 772-562 -4191 DEAN F LUETFUE. P. E. ,F i AN( , 772562 -7180 1KCX JOHN H. BLOM, P. E. FRANK S CUCCURESE, P. S.M. January 4, 2007 DAVID E. LUETRIE. P. S. M. G. SEAN MCGUIRE, BE, GEORGE SIMONS, RE. STEVE SNORERGER. PE. Mr. Christopher J. Kafer, Jr., P.E. , County Engineer PATRICK S. WALTHER, PE. Indian River County Engineering Division 1840 25 " Street Vero Beach, FL 32960 Re 66 " Avenue Roadway Improvements (4t° Street to State Road 60) Addendum No . 5 — Professional Services Agreement IRC Project No. 9810 (CAI Job # 98-23E) Dear Chris: We are pleased to present this proposed addendum for additional services relative to revising the construction plans to match the College Lane extension plans prepared by LBFH (dated November 22, 2006) . All Provisions of the original Professional Engineering Services Agreement (dated November 17, 1998) , including Addendum Nos. 1 , 2 , 3 and 4, shall remain in full force and effect, unless otherwise specifically modified herein . A man-hour breakdown is attached as Exhibit "A" for your use . The following describes our proposed scope of services and terms of agreement between Carter Associates, Inc . (CAI) and Indian River County (COUNTY) : Design Modifications : In general , the roadway plans and drainage design will be modified to accommodate the higher elevation on the eastern leg (College Lane) of the intersection due to the proposed bridge over the IRFWCD Lateral `A ' Canal, as follows : • Revise 16" Street and 66" Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement Marking Plan sheets. • Revise drainage structures, drainage piping, and stormwater management report. • Revise Tabulation of Quantities and Summary of Drainage Structures. • Update engineer 's cost estimate . Addendum No. 5 fees will be invoiced on a percent complete lump sum basis per our original engineering services agreement. The total amount to be billed under Addendum No. 5 shall not exceed $21 ,460 . 00 without further written authorization. Should you have any questions regarding our proposed scope of work or terms of agreement, please call me. Sincerely, CARTER ASSOCIATES , INC. le- - 4&I-r Patrick S . Walther, P .E . Project Manager Attachment- 1 a^ ♦� � SennPlonda Since 19u . 0:\PS WAP198-23 E\miscdoc\Addendum5.doc Indian River County 66th Avenue Roadway Improvements EX) 11b1 t " A " Addendum No. 5 (Raise intersection at 16th Street to match College Lane extension plans) Fee Estimate (CAI) 1/4/2007 $ 140. 00 $ 125 .00 $ 110. 00 $ 75 . 00 $40. 00 En . I,Prin. En . I, P.E. En . II, P. E. DD Tech Clerical Subtotal Desi n Modifications Plan & Profrle Sheets (8 sheets x 6 hrs) 4 12 Cross-Sections 26 sections x 1 hr 32 $47220. 00 Si in & Markin Plans 2 sheets x 4 hrs) 2 4 20 $2, 190. 00 Drama e Structures 12 each x 1 hr) 4 2 6 $670. 00 Draina ePi es 8 8 $ 1 ,980. 00 4 8 8 $ 1 , 980.00 Stormwater Model & Report 8 8 Revise uantmes and Structure Tables $4 ,520. 00 U date Cost Estimate 4 8 $ 1 , 040.00 Quah Control8 $ 880. 00 24 4 $ 1 ,220.00 Coord/Meetin s/Incidentals/Printin 4 8 IRC Review 2 2 2 4 $2, 140.00 $ 620.00 TOTAL = $21 ,460.00 CARTER ASSOCIATES , INC. CONSUL TLSIU ENUMERS AND LANA SURVEYORS 1 708 2151 STREET VERO BEACH, FLORIDA 32960-3472 MARVIN E. CARTER, P.S.M. 772-SG2.4191 DEAN E LUETHJE. P.E. �ac ,uq 772.562 -7180 (FAX ) JOHN H. BLUM. P.E. FRANK S. CUCCUBESE, P.S.M. DAVID E. LUETHJE, P.S.M. January 4, 2007 G. SEAN MCGUIRE, P.E. GEORGE SIMONS, P.E. STEVE SNOBERGER, P.E. Mr. Christopher J. Kafer, Jr., P .E., County Engineer PATRICK S. WALTHER, PE. Indian River County Engineering Division 1840 25"' Street Vero Beach, FL 32960 Re 66 h Avenue Roadway Improvements (4`a Street to State Road 60) Addendum No . 5 — Professional Services Agreement IRC Project No . 9810 (CAI Job # 98-23E) Dear Chris. We are pleased to present this proposed addendum for additional services relative to revising the construction plans to match the College Lane extension plans prepared by LBFH (dated .November 22, 2006). All provisions of the original Professional Engineering Services Agreement ;(dated November 17, 1998)9 including Addendum Nos. 1 , 2, 3 and 4, shall remain in full force and effect, unless otherwise specifically modified herein. A man-hour breakdown is attached as Exhibit "A" for your use. The following describes our proposed scope of services and terms of agreement between Carter Associates, Inc. , (CAI) and Indian River County (COUNTY) : Design Modifications: In general, the roadway plans and drainage design will be modified 'to accommodate the higher elevation on the eastern leg (College Lane) of the intersection due to the proposed bridge over the 'IRFWCD Lateral `A' Canal, as follows: • Revise 16'bStreet and 666 Avenue Plan & Profile sheets, Cross Sections, and Signing &'Pavement Marking Plan sheets. • Revise drainage structures, drainage piping, and stormwater management report. • Revise Tabulation of Quantities and Sunnnary of Drainage Structures. • Update engineer's cost estimate. Addendum No . 5 fees will be invoiced on a percent complete lump sum basis per our original engineering services agreement. The total amount to be billed under Addendum No. 5 shall not exceed $21 ,460.00 without further written authorization. Should you have any questions regarding our proposed scope of work or terms of agreement, please call me . Sincerely, CARTER ASSOCIATES , INC. Patrick S . Walther, P .E. Project Manager Attachment-1 _ Serving Flonda ZU Since 1911 O:\PSVAPU8-23E1misedoc Wddendtnn5.doc Indian River County Exhibit " A " 66th Avenue Roadway Improvements Addendum No. 5 (Raise intersection at 16th Street to match College Lane extension plans) Fee Estimate (CAI) 1/4/2007 $ 140.00 $ 125 .00 $ 110. 00 $75 . 00 $40.00 Desi n Modifications En , I,Prin. Ene . I, P.E. En . 1I5 P.E. CARD Tech Clerical Subtotal Plan & Profile Sheets (8 sheets x 6 hrs) 4 12 32 $4,220. 00 Cross-Sections 26 sections x 1 hr) 2 4 20 $2, 190.00 Si & Marking Pians 2 sheets x 4 Ins) 2 6 $670.00 Drama a Structures (12 each x l hr) 4 8 8 $ 15980.00 Drainage Pies 4 8 8 $ 1 .980. 00 Stormwater Model & Report 8 32 $4,520.00 Revise Quantities and Structure Tables 4 8 U $ 1 .040. 00 date Cost Estimate 8 $ 880.00 Quahtv Control 2 4 4 1 $ 1 ,220.00 Coord/Meetin s/Incidentals Print n 4 8 8 4 $23140.00 IRC Review 2 2 2 $620.00 TOTAL = $21 ,460.00 CARTER ASSOCIATES, INC CONSULTING ENGWEERS AND LAND SURVEYORS 1708 21st SI REE"r NERD REAC11, FI,0RJDA 32960 J472 M.ARAaN f ('.;AR'I ER. I' S NJ 772 762 4 [ !) 1 DL IN 1 JA EIVE. 772-,-162 7180 1 P,1 x l 1011N If, BIaM. 1'. E IRCANK S_ CUCC I 'R FSL. Ps NI_ January 4, 2007 Davin E 1.ursrnaE. Ps.nL G. SEAN W GILt6, RF .E.UI2G1' SIAIONS, I - L_ Mr. Christopher J. Kafer, Jr. , P. E. , County Engineer SATRICKN�O1 Gut. er__ k'ATRICK S. \VgLTHPat. I2F. Indian River County Engineering Division 1840 25 ° Street Vero Beach, FL 32960 Re 66th Avenue Roadway Improvements (4th Street to State Road 60) Addendum No. 5 — Professional Services Agreement IRC Project No. 9810 (CAI Job # 98 -23E) Dear Chris : We are pleased to present this proposed addendum for additional services relative to revising the construction plans to match the College Lane extension plans prepared by LBFH (dated November 22 , 2006). All provisions of the original Professional Engineering Services Agreement (dated November 17 , 1998) , including Addendum Nos . 1 , 2, 3 and 4, shall remain in full force and effect, unless otherwise specifically modified herein . A man-hour breakdown is attached as Exhibit "A " for your use. 'Phe following describes our proposed scope of services and terms of agreement between Carter Associates, Inc. (CAI) and Indian River County (COUNTY) : _Design Modifications : In general , the roadway plans and drainage design will be modified to accommodate the higher elevation on the eastern leg (College Lane) of the intersection due to the proposed bridge over the IRFWCD Lateral ` A ' Canal, as follows : • Revise 10 Street and 66" Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement Marking Plan sheets . • Revise drainage structures, drainage piping, and stormwater management report. • Revise Tabulation of Quantities and Summary of Drainage Structures. • Update engineer ' s cost estimate. Addendum No . 5 fees will be invoiced on a percent complete lump sum basis per our original engineering services agreement. The total amount to be billed under Addendum No . 5 shall not exceed $21 ,460.00 without further written authorization. Should you have any questions regarding our proposed scope of work or terms of agreement, please call me . Sincerely, CARTER ASSOCIATES, INC. Id- - "Zvi Patrick S . Walther, P. E . Project Manager Attachment- 1 Se5 fl ig I Ionia CAI SinC[' ISN I 0-IPS WT198-23E1lnlscdoc Addendunl5-doc Indian River County Exhibit " A " 66th Avenue Roadway Improvements Addendum No. 5 (Raise intersection at 16th Street to match College Lane extension plans) Fee Estimate (CAI) 1/4/2007 $ 140 . 00 $ 125 .00 $ 110. 00 $75.00 $40.00 Desi n Modifications En . I, Prin. En . t, P. E. En x 11, P.E. CADD Tech Clencal Subtotal Plan & Profile Sheets (8 sheets x 6 hrs) 4 12 32 Cross-Sections 26 sections x 1 hr2 4 20 $41220.00 Si nin & Markin Plans 2 sheets x 4 hrs 2 6 $2, 190. 00 Draina e Structures 112 each x 1 hr) 48 $ $670.00 Drama e Pi es 4 $ $ 1 , 980. 00 8 Stormwater Model & Re ort8 32 $ 1 ,980. 00 $4,520. 00 Revise uan[ities and Structure Tables 4 $ U date Cost Estimate $ 1 ,040.00 $880. 00 Quali Control 2 $4 4 Coord/Meetin s/Incidentals/Printin $ 1 ,220. 00 IRC Review 2 2 13 4 $2, 140. 00 2 $ 620.00 TOTAL = $219460.00 CARTER ASSOCIATES , INC . CONSULTING ENGINEERS AND LAND SURVEYORS 1708 2151 SRLl:l MARY"I.N C. GAR-I I R. Ps, %L i'RRU RCACII. I LORIM 32961 -3+,2 IMVNF. l [ H1H E. R8. 772-562 -4 191 792 -.;(i'2-7184) IPAx1 RHI . 11. RIA '%I. III I ' R.ASK S. ( CC( ARI'SL. 1'..S )I. D kN I l 1-- LIHII I f. R S. .M . January 4, 2007 6. sI AN NR ( A IRL. III - GIfORGL SI ?IU-AS- Co-- S I liN F S.AoliltRGER. CIE. . \1 RICK S. \C\I I I1IiR. PI Mr. Christopher J. Kafer, Jr. , P.E ., County Engineer I ' Indian River County Engineering Division 1840 25`h Street Vero Beach, FL 32960 Re 66`h Avenue Roadway Improvements (4`h Street to State Road 60) Addendum No. 5 — Professional Services Agreement IRC Project No. 9810 (CAI Job # 98-23E) Dear Chris: We are pleased to present this proposed addendum for additional services relative to revising the construction plans to match the College Lane extension plans prepared by LBFH (dated November 22 , 2006). All provisions of the original Professional Engineering Services Agreement (dated November 17, 1998), including Addendum Nos. 1 , 2, 3 and 4, shall remain in full force and effect, unless otherwise specifically modified herein. A man-hour breakdown is attached as Exhibit "A" for your use. The following describes our proposed scope of services and terms of agreement between Carter Associates, Inc . (CAI) and Indian River County (COUNTY) : Desian Modifications: In general , the roadway plans and drainage design will be modified to accommodate the higher elevation on the eastern leg (College Lane) of the intersection due to the proposed bridge over the IRFWCD Lateral ` A' Canal, as follows: • Revise 16'b Street and 66`h Avenue Plan & Profile sheets, Cross Sections, and Signing & Pavement Marking Plan sheets. • Revise drainage structures, drainage piping, and stormwater management report. • Revise Tabulation of Quantities and Summary of Drainage Structures . • Update engineer ' s cost estimate. Addendum No. 5 fees will be invoiced on a percent complete lump sum basis per our original engineering services agreement. The total amount to be billed under Addendum No . 5 shall not exceed $21 ,460 .00 without further written authorization. Should you have any questions regarding our proposed scope of work or terms of agreement, please call me . Sincerely, CARTER ASSOCIATES , INC. Patrick S . Walther, P.E. Project Manager Attachment-IL�� S( LE ii le 11( ,I :l Simi 11II1 O: TS W\P\98-23 E\miscdoc\Addendum5 .doc Indian River County Exhibit " A " 66th Avenue Roadway Improvements Addendum No. 5 (Raise intersection at 16th Street to match College Lane extension plans) Fee Estimate (CAI) 1/4/2007 $ 140.00 $ 125 .00 $ 110.00 $75.00 $40.00 En . I,Prin. En . I, P.E. En . II, P.E. CADD Tech Clerical Subtotal RDraina odifications rofile Sheets 8 sheets x 6 hrs 4 12 32 $4,220.00 ctions (26 sections x 1 hr 2 4 20 $2, 190.00 & Markin Plans 2 sheets x 4 1- - 1 2 6 $670.00 Structures 12 each x 1 hr) 4 8 8 $ 1 ,980.00 Pi es 4ter Model & Report 8 32 $4,520.00 Revise Quantities and Structure Tables 4 8 $ 13040.00 Update Cost Estimate 8 $880 . 00 Quality Control 2 4 4 $ 1 ,220.00 Coord/Meetin s/Incidentals/Printin 4 8 8 4 $2, 140.00 IRC Review 2 2 2 $620 .00 TOTAL = $219460.00