Loading...
HomeMy WebLinkAbout2007-142 MONSON INDIAN RIVER COUNTY Oslo Road Phase I Roadway Widening AMENDMENT NO. 9 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES AGREEMENT BETWEEN KIMLEY-HORN AND ASSOCIATES, INC. AND INDIAN RIVER COUNTY, FLORIDA. This is an amendment to the existing Engineering/Land Surveying Services Agreement (AGREEMENT) dated March 24th, 1998 between Kimley-Horn and Associates, Inc. (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section III - Scope of Services" and " Section V - Compensation" of the AGREEMENT. Amendment Description This Amendment includes the following: "SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following: Alternate Pond Siting Report The COUNTY desires to prepare an alternate pond siting report to address the 27`h Avenue stormwater requirements between Oslo Road and 7th Street SW. The analysis will address the hydrologic and hydraulic characteristics associated with three alternative pond sites. A preliminary stormwater management system will be developed to include type of collection system, outfalls and best practice stormwater management facility selection. The potential effect on downstream properties and other stormwater management requirements will be addressed. An opinion of probable construction cost will be developed for each alternative pond site evaluated. Costs evaluated will include right-of- way, construction, utilities, maintenance, cultural resources, environmental, floodplain and aesthetics. No site specific geotechnical data will be obtained to aid in seasonal high water elevation determination and soil classification. The ENGINEER will coordinate with the COUNTY and/or their consultant regarding the development of costs associated with right-of-way acquisition. " SECTION V — COMPENSATION" is being modified to incorporate the following: The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered Indian River County, Amendment No. 9 Oslo Road Phase I Roadway Widening Project pursuant to this Agreement fees inclusive of expenses in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the ENGINEER and the COUNTY is as follows : Task Labor Fee Lump Sum Components Alternate Pond Siting Report K780 Hourly Rate Components Labor Fee ' Right-of-Way Acquisition Coordination $ 7,500 'Not to exceed without written authorization. B . Additional Services Fee The COUNTY agrees to pay for additional services, which are outside or beyond the lump sum scope of services identified above in accordance with the revised hourly rate schedule. Principal $ 150 Senior Professional $ 125 Professional $ 100 Engineer Analyst $85 Technician $75 Draftsman $65 Support Staff $48 "SECTION XVI — DURATION OF AGREEMENT" is being modified to incorporate the following: This Agreement shall remain in full force and effect until December 31 , 2008 or until completion of project phases as specified by the Public Works Director, or unless otherwise terminated by mutual consent of the parties hereto or pursuant to Section XII of this AGREEMENT. Page 2 of 3 Indian River County, Amendment No. 9 Oslo Road Phase I Roadway Widening Project The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This Amendment No . 9 to the AGREEMENT regardless of where executed, shall be governed by and construed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this 1 et day of May , 2007. KIMLEY-HORN AND ASSOCIATES, INC. INDIAN RIVER COiJI ;y, FLORIDA 6012 1 ST STREET #400 Board of County Comx�isaiq�rs , VER H, FL 960 A By: > n Good By. Ga Wheeler C airmn Associ� Bo d of Cou t}i 1Co signers J.K. 13ARTON s ` . �. . CLERK CIRCUIT COURT Attest: �� + _ _ Attest: Deputy Clerk of the Court Accepted . Co my Administrator Ap rov s to Form a e al fficiency: County omey a' r ed Date Administration Budget Legal Risk Management _ Public Works Ca ital Projects to Utilities Page 3 of 3