HomeMy WebLinkAbout2005-287 'rl - II '
c�nwwar ►aahnlrs� �r ,► _ 790 N . E . 48" Street , Pompano Beach , Florida 33064
Application for Payment No . 1 . FWAL
For Work Accomplished through the period of Mal/ 171h through June 17th 2005
To : Indian River County (OWNER)
From : The Danella Companies , Inc. , Utilities Labor Contractor
Project Name : Chesser' s Gap Force Main Bypass along CR 512
COUNTY WIP NO . : 471 . 26836-044699
ENGINEER OF RECORD : Gordon E . Sparks , P . E . .
1 . Original Contract Price : $ 14 , 148 , 36
2 . Net change by Change Orders and Written Amendments ( + or - ) : ($2 , 872 . 60 )
3 . Current Contract Price ( 1 plus 2 ) : $ 17 , 020 . 96
4 . Total completed and stored to date $ 17 , 202 , 96
5 . Retainage ( per Agreement) :
0 % of completed Work : N/A
0 % of stored material : N/A
Total Retainage : N/A
6 . Total completed and stored to date less retainage (4 minus 5 ) : $ 172020 . 96
7 . Less previous Application for Payments : $0 . 00
8 . DUE THIS APPLICATION (6 MINUS 7) : 17 020 . 96
(°') If applicable, an Itemized list of labor and/or materials furnished and installed I s attached.
CONTRACTOR'S CERTIFICATION :
The undersigned CONTRACTOR certifies that ( 1 ) all previous progress payments received from
OWNER on account of Work done under the Contract referred to above have been applied on
account to discharge CONTRACTOR' s legitimate obligations incurred in connection with Work
covered by prior Applications for Payment numbered 1 through 2 inclusive ; (2 ) title of all Work ,
materials and equipment incorporated in said Work or otherwise listed in or covered by this
Application for Payment will pass to OWNER at time of payment free and clear of all Liens , security
interests and encumbrances (except such as are covered by a Bond acceptable to OWNER
indemnifying OWNER against any such Lien , security interest or encumbrance ) ; (3 ) all Work
covered by this Application for Payment is in accordance with the Contract Documents and not
defective and (4 ) If this Periodic Estimate is for a Final payment to project or improvement , I further
certify that all persons doing work upon or furnishing materials or supplies for this project
or
improvement under this foregoing contract have been paid in full , and that all taxes imposed by No .
212 Florida Statutes , ( Sales and Use Tax Act , as Amended ) have been paid and discharged , and
that I have no claims against the OWNER .
Dated
( NTRA
By: 1
r ,
State of
County of
Subscribed and sworn to before m s .�0 .7H
day of , / 2vc S NICHOLAS J . FIDUCCIA
Notary Public NOTARY PUBLIC - STATE OFFIARIDA
COMMISSION N DD136M
My Commission expires : SONDE PES M
THRRU 14 &WINW-NOTARYI
Page 1 of 2
Z:Uob Folders\Indian River County\Annual Contract\Chesser's Gap\Npplication for Payment - Chesser's Gap.doc Rev. 07/01
CERTIFICATION OF ENGINEER (WHERE APPLICABLE) :
I certify that I have checked and verify the above and foregoing Periodic Estimate for Partial
Payment; that to the best of my knowledge and belief it is a true and correct statement of the work
performed and/or material supplied by the Contractor.
Dated Z
/ ENGINEER SIGNATURE
CERTIFICATION OF ENGINEER /INSPECTOR :
I have checked the estimate against the Contractor's Schedule of Amounts for Contract
Payments and the notes and reports of my inspections of the project . It is my opinion that this
statement of work performed and/or materials supplied is accurate , that the Contractor is observing
the requirements of the Contract , and that the Contractor should be paid the amount requested
above .
Dated � � 2 7 O l
tNRG NST / ENGINEER) SIGNATURE
Accompanying Documentation : Itemized List of Labor Bid Items
* * END OF SECTION
Page 2 of 2
Z:\Job Folders\Indian River County\Annual Contract\Water Services\IRC - 00622 - Application for Payment Grovenor.doc Rev. 07/01
CM1 z GAP
p
790 N.E. 48th Street - Pompano Beach, Florida 33064
.caa+aerrrar«rr�xs. raivv+c_
Indian River County Department of Utilities
COST ESTIMATE and CONTRACTOR'S BID ITEM LIST
Project: IRC - Chesser's Gap 6" Force Main CHANGE ORDER
Description: WIP #471-26836-044699
5-Jul-05 LABOR COSTS
Bid Bid Item Estimated Unit of Labor Unit Total Labor
Item No. Description Quantity , Measure Price Price
77 Mobilization 1 4% 642 .30
78 Demobilization 1 1 % 160.58
79 Maintenance of Traffic 1 1 % 160. 58
04c Install 8 " HDPE Horiz. Directional Drill 400 LF $22 .00 8,800.00
06 Install MRJDI Fittings 0. 50 Tons $ 1 ,665 .001 832 .50
31f Install 8 " PVC Force Main 10 LF $6 .50 65 .00
13c Ta 8" Main for Installation of Assembly 1 EA $650.00 650.00
Ila Install Wet Ta Assembly 8 " & 8" 1 EA $900.00 900.00
9 Make Connections to Existing 1 EA. $795 .00 795 .00
Main/Structure
44 Core Drill MH & Install Expansion Boot 1 EA. $ 550 .00 550.00
72 Load and Haul Debirs 3 CY $350.00 1 ,050 .00
23 Potholes 6 EA. $200.00 1 ,200 .00
73a Topsoil & Sod 450 SY $2 .70 1 ,215 .00
Subtotal Subtotal Sewer System Labor 16,057 .50
Subtotal Subtotal Sewer System Labor, Mob., 963 .46
Demob .
SubTotal Labor Cos $17,020.96
TOTAL PROJECT COST
CMsw Gap MV Ab
SECTION 00450
CHANGE ORDER FORM
CHANGE ORDER NO . 01
DATE : August 2005 CONTRACTOR: The Danella Companies , Inc .
OWNER : INDIAN RIVER COUNTY AGREEMENT DATE : April 5 , 2005
PROJECT NAME : Chesser' s Gap Force Main Bypass Along CR 512
The following changes are hereby made :
1 ) Change all references to 6" force main to 8" force main and fittings as a result of field conditions
actually encountered
Original CONTRACT PRICE (LABOR ONLY) $ 14 . 148 . 36
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ N/A
Net Increase (Decrease) Resulting from this CHANGE ORDER $ 29872 . 60
The current CONTRACT PRICE including this CHANGE ORDER $ 17 , 020 . 96
ORIGINAL CONTRACT TIME : 30days No . Days 30
Current CONTRACT TIME adjusted by previous CHANGE ORDER No . Days N/A
Net Increase ( Decrease) Resulting from this CHANGE ORDER No . Days 30
Current CONTRACT TIME Including this CHANGE ORDER No . Days 60
CHANGES ORDERED :
I . GENERAL
This change order is necessary to cover changes in the work to be performed under this
Contract. The ANNUAL LABOR CONTRACT AND SPECIFICATIONS apply to and
govern all work under this change order.
Il . REQUIRED CHANGES
Increase/decrease certain item quantities to reflect actual field conditions
III . JUSTIFICATION
To complete construction of force main bypass to eliminate sewage backup condition at
the Elk's Lodge on Fleming Street in Sebastian
Attachment 1
Funds for the project have been approved by the BCC from the Utilities Department
Repair and Replacement Sewer Fund Account No . 471 - 26836-044699
Change Order Form
00450 - - 1 -
C:\DOCUME- 1\NFIDUC— I\LOCALS-1\Temp\notes6030C8\00450 - Change Order Form.doc
IV . WAIVER
This Change Order constitutes full and mutual accord and satisfaction for the adjustment
in contract price or time as a result of increases or decreases in costs and/or time of
performance caused directly and indirectly from the change .
This Change Order represents an equitable adjustment to the contract and
CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is
properly executed .
V . APPROVAL AND CHANGE AUTHORIZATION
Acknowledgements :
The aforementioned change , and work affected thereby, is subject to all provisions of the
original contract not specifically changed by this Change Order ; and ,
It is expressly understood and agreed that the approval of the Change Order shall have
no effect on the original contract other than matters expressly provided herein .
Change Order Request By : Gordon Sparks Department of Utility Services ,
Indi River County, FI a
Change (s ) Ordered By : Gordon Sparks
IV
Arlt RMENTAL ENGINEER
RECOMMENDED BY : Gordon Sparks ACCEPTED BY :
DEPARTMENT OF UTILITY SERVICES The Danella Companies , Inc .
Engineer : Gorcfn Spar C ntr ctor
By ' �/ B : /Z
z aa�
Y
Signature & 16ate Signature & Date
Title : Environmental Engineer Title : Ily
APPR'VED _BY :
INDIAN RIVER COUNTY, FLORIDA
It I
'Thomas 3 • Lowther , Chairman , Board of County Commissioners
BC ' A p- (ov6d, :` � August 23 , *2005 of SECTION
r•
Change Order Foam
00450 - - 2 -
CADOCUME— I \NFIDUC— I \LOCALS— I \Temp\notes6030C8\00450 - Change Order Form-doe